+
Bekem Infra Wins Rs 23.42 Billion Rajiv Rahadari Corridor Project
ROADS & HIGHWAYS

Bekem Infra Wins Rs 23.42 Billion Rajiv Rahadari Corridor Project

Bekem Infra Projects Private Limited has been awarded the contract to build the 18.1-kilometre Rajiv Rahadari elevated corridor connecting Paradise Junction to Shamirpet Junction on Hyderabad’s Outer Ring Road.

The project is valued at around Rs 23.42 billion and is scheduled for completion within two years. Land acquisition activities are currently under way to facilitate timely execution.

Once completed, the elevated corridor is expected to reduce commute time between Paradise Junction and the Shamirpet Outer Ring Road junction by approximately 45 minutes, while enabling smoother and congestion-free travel. At present, the journey from Paradise to the Shamirpet ORR junction typically takes more than an hour.

The corridor is designed to significantly improve traffic flow on this busy urban stretch, enhance connectivity to the Outer Ring Road and ease pressure on existing surface roads, contributing to more efficient urban mobility in the northern parts of Hyderabad.

Bekem Infra Projects Private Limited has been awarded the contract to build the 18.1-kilometre Rajiv Rahadari elevated corridor connecting Paradise Junction to Shamirpet Junction on Hyderabad’s Outer Ring Road. The project is valued at around Rs 23.42 billion and is scheduled for completion within two years. Land acquisition activities are currently under way to facilitate timely execution. Once completed, the elevated corridor is expected to reduce commute time between Paradise Junction and the Shamirpet Outer Ring Road junction by approximately 45 minutes, while enabling smoother and congestion-free travel. At present, the journey from Paradise to the Shamirpet ORR junction typically takes more than an hour. The corridor is designed to significantly improve traffic flow on this busy urban stretch, enhance connectivity to the Outer Ring Road and ease pressure on existing surface roads, contributing to more efficient urban mobility in the northern parts of Hyderabad.

Next Story
Infrastructure Transport

Second Mountain Tunnel Breakthrough in Palghar Advances High Speed Rail

The Mumbai-Ahmedabad high speed rail (MAHSR) project reached a milestone with the breakthrough of a mountain tunnel in Palghar, Maharashtra. Mountain tunnel MT-six measures 454 metres long and 14.4 metres wide and will accommodate up and down tracks. The breakthrough follows MT-five near Saphale on second January 2026 and the MT-six excavation was completed from both ends using the New Austrian Tunnelling Method. The ministry reported that the tunnelling was completed within 12 months. The New Austrian Tunnelling Method is favoured for its flexibility in complex geology and irregular tunnel s..

Next Story
Infrastructure Transport

Modi Government Pushes Atmanirbhar Container Drive With BCSL MoU

The Union Government advanced a plan to create an integrated, domestically anchored container ecosystem with the signing of a Memorandum of Understanding to establish the Bharat Container Shipping Line (BCSL). The MoU was signed by key agencies including the Shipping Corporation of India and Container Corporation of India alongside major port authorities and Sagarmala Finance Corporation Limited under the Ministry of Ports, Shipping and Waterways, in the presence of senior ministers. The initiative aligns with the Container Manufacturing Assistance Scheme announced in the Union Budget 2026–2..

Next Story
Infrastructure Urban

Ministry Reports Gains In Mobility For Marginalised Communities

The Ministry of Social Justice and Empowerment is implementing skill development, education and rehabilitation schemes to promote socio-economic mobility and sustainable livelihoods for marginalised and disadvantaged communities across the country. Programmes target Scheduled Castes, Other Backward Classes, Economically Weaker Sections, De-notified Tribes and Safai Karamcharis through specialised implementing corporations and empanelled training institutes. Pradhan Mantri Dakshata Aur Kushalta Sampann Hitgrahi Yojana, or PM-DAKSH, provided skill training and placement support through the Nati..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App