+
India Opens Longest Precast Cut-and-Cover Tunnel
ROADS & HIGHWAYS

India Opens Longest Precast Cut-and-Cover Tunnel

India has inaugurated its longest precast cut-and-cover tunnel, a 920-metre structure located at an altitude of 12,300 ft (3,750 m) in a sensitive border region. The project was formally opened on 7 December 2025 by Defence Minister Rajnath Singh. The tunnel is designed to improve troop movement, strengthen supply lines and bolster operational readiness in challenging high-altitude terrain.

The company has expressed gratitude to the Ministry of Defence and the Border Roads Organisation for their support and guidance, noting that it is honoured to contribute to a project of such strategic significance and remains committed to delivering infrastructure that strengthens India’s defence capabilities.

India has inaugurated its longest precast cut-and-cover tunnel, a 920-metre structure located at an altitude of 12,300 ft (3,750 m) in a sensitive border region. The project was formally opened on 7 December 2025 by Defence Minister Rajnath Singh. The tunnel is designed to improve troop movement, strengthen supply lines and bolster operational readiness in challenging high-altitude terrain. The company has expressed gratitude to the Ministry of Defence and the Border Roads Organisation for their support and guidance, noting that it is honoured to contribute to a project of such strategic significance and remains committed to delivering infrastructure that strengthens India’s defence capabilities.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code