+
MLA Launches Road Project From Servad To Udhan
ROADS & HIGHWAYS

MLA Launches Road Project From Servad To Udhan

Baldev Raj Sharma, the MLA for the Shri Mata Vaishno Devi constituency, today kick-started work on the construction and maintenance of the road from L142 Link Road Servad to Gunni road, at kilometre two towards Udhan under the Pradhan Mantri Gram Sadak Yojana IV scheme, at an estimated cost of Rs 107 million (mn). The commencement of the project was described as the fulfilment of a long-pending and genuine demand of local residents who had sought improved road connectivity for many years. The project is expected to bring substantial relief to local residents by providing better, safer and more reliable transportation while strengthening links between habitations and adjoining areas. Improved connectivity is anticipated to facilitate easier access to education, healthcare, markets and other essential services and to support socio-economic development across the constituency. Local residents expressed gratitude for what they characterised as persistent follow-up and commitment by the MLA, who was credited with taking up public issues and translating development demands into concrete projects on the ground. The MLA directed the executing agency and the contractor to maintain a fast pace of work and to complete the project within the stipulated timeframe while strictly adhering to prescribed technical specifications and quality standards, insisting that there should be no compromise with construction quality and workmanship.\n\nHe reiterated his commitment to balanced and comprehensive development of the constituency with special focus on strengthening road connectivity and addressing long-pending infrastructure needs. The inauguration was attended by the AEE PMGSY Reasi, the AE PMGSY Reasi and their staff, alongside Sardari Lal Dubey, Ramesh Singh, Suresh Sharma, other prominent citizens and a large number of local residents.

Baldev Raj Sharma, the MLA for the Shri Mata Vaishno Devi constituency, today kick-started work on the construction and maintenance of the road from L142 Link Road Servad to Gunni road, at kilometre two towards Udhan under the Pradhan Mantri Gram Sadak Yojana IV scheme, at an estimated cost of Rs 107 million (mn). The commencement of the project was described as the fulfilment of a long-pending and genuine demand of local residents who had sought improved road connectivity for many years. The project is expected to bring substantial relief to local residents by providing better, safer and more reliable transportation while strengthening links between habitations and adjoining areas. Improved connectivity is anticipated to facilitate easier access to education, healthcare, markets and other essential services and to support socio-economic development across the constituency. Local residents expressed gratitude for what they characterised as persistent follow-up and commitment by the MLA, who was credited with taking up public issues and translating development demands into concrete projects on the ground. The MLA directed the executing agency and the contractor to maintain a fast pace of work and to complete the project within the stipulated timeframe while strictly adhering to prescribed technical specifications and quality standards, insisting that there should be no compromise with construction quality and workmanship.\n\nHe reiterated his commitment to balanced and comprehensive development of the constituency with special focus on strengthening road connectivity and addressing long-pending infrastructure needs. The inauguration was attended by the AEE PMGSY Reasi, the AE PMGSY Reasi and their staff, alongside Sardari Lal Dubey, Ramesh Singh, Suresh Sharma, other prominent citizens and a large number of local residents.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Emiza Expands Bhiwandi Fulfilment Capacity by 2.32 Lakh Sq Ft

Emiza, a leading third-party logistics (3PL) provider, has expanded its Mumbai operations with the launch of two new fulfilment facilities in Bhiwandi, adding a combined capacity of 2.32 lakh sq ft to its network.The new facilities, spread across 75,000 sq ft and 1,57,000 sq ft, mark Emiza’s fifth and sixth warehouses in the Mumbai region. The expansion strengthens the company’s fulfilment infrastructure in Western India amid the rapid growth of India’s digital commerce ecosystem.With increasing online consumption, wider product categories and rising customer expectations for faster deli..

Next Story
Infrastructure Urban

Ingersoll Rand Showcases Air Solutions for Semiconductor Sector

Ingersoll Rand will showcase its advanced compressed air solutions for India’s growing semiconductor ecosystem at SEMICON India 2026, scheduled from September 17–19 at Yashobhoomi, New Delhi.The company will display its portfolio of oil-free compressors, centrifugal compression technologies and advanced air treatment systems at Stall No. 1156, Hall No. 1. The solutions are designed to address the stringent air quality, reliability and efficiency requirements of semiconductor manufacturing applications.With India accelerating investments across semiconductor manufacturing, packaging, equipm..

Next Story
Infrastructure Energy

RECPDCL Transfers Musalgaon Transmission SPV to MSETCL

REC Power Development and Consultancy Limited (RECPDCL), a wholly owned subsidiary of REC Limited, has handed over Musalgaon Power Transmission Limited, a project-specific Special Purpose Vehicle (SPV), to Maharashtra State Electricity Transmission Company Limited (MSETCL).MSETCL emerged as the successful bidder through the Tariff-Based Competitive Bidding (TBCB) process conducted by RECPDCL, the Bid Process Coordinator, for developing Maharashtra’s intra-state transmission project on a Build, Own, Operate and Transfer (BOOT) basis.The SPV was handed over by Shri Ratnesh Kumar, General Manag..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code