NHAI Responds to Damage Claims on Rs 42 bn Lucknow–Kanpur Expressway
ROADS & HIGHWAYS

NHAI Responds to Damage Claims on Rs 42 bn Lucknow–Kanpur Expressway

The National Highways Authority of India responded to viral footage that purported to show damage to the Rs 42 billion (bn) Lucknow–Kanpur Expressway, saying the issue was a localised surface slippage near kilometre 64 in Unnao's Korari area that was rectified. The authority said the recent videos do not show new damage but depict preventive maintenance and corrective work being carried out after a detailed inspection of the entire expressway following the slippage incident. It indicated that traffic was restored promptly after the initial rectification.

NHAI said it removed two independent engineers engaged for supervision and one official of the construction company after investigations into the initial slippage, as part of corrective measures. The project director said a thorough review was conducted and that preventive corrective work was being undertaken across the corridor, particularly in view of the monsoon season. He added that the slippage had been fixed within six hours and that traffic resumed on the same day.

The authority rejected claims that the expressway had caved in, stating that only the bituminous wearing course over about 40-metre stretch was affected and that there was no structural damage. It reiterated that the expressway is covered under a 15-year Defect Liability Period (DLP), during which the concessionaire is obliged to carry out maintenance and rectification at no additional cost to NHAI. Routine operations and maintenance activities, including prompt rectification of rain cuts and other monsoon-related issues, were said to be part of standard procedure to ensure safety and serviceability.

The footage triggered political criticism, with Opposition parties alleging compromised construction quality on a flagship project and asserting that repeated repairs pointed to deeper governance and accountability concerns. The Samajwadi Party accused the expressway of needing repairs for the second time in 17 days, while the UP Congress described the condition as evidence of corruption and a risk to public safety. NHAI maintained that the affected stretch has been restored and that normal traffic movement is being observed.

The National Highways Authority of India responded to viral footage that purported to show damage to the Rs 42 billion (bn) Lucknow–Kanpur Expressway, saying the issue was a localised surface slippage near kilometre 64 in Unnao's Korari area that was rectified. The authority said the recent videos do not show new damage but depict preventive maintenance and corrective work being carried out after a detailed inspection of the entire expressway following the slippage incident. It indicated that traffic was restored promptly after the initial rectification. NHAI said it removed two independent engineers engaged for supervision and one official of the construction company after investigations into the initial slippage, as part of corrective measures. The project director said a thorough review was conducted and that preventive corrective work was being undertaken across the corridor, particularly in view of the monsoon season. He added that the slippage had been fixed within six hours and that traffic resumed on the same day. The authority rejected claims that the expressway had caved in, stating that only the bituminous wearing course over about 40-metre stretch was affected and that there was no structural damage. It reiterated that the expressway is covered under a 15-year Defect Liability Period (DLP), during which the concessionaire is obliged to carry out maintenance and rectification at no additional cost to NHAI. Routine operations and maintenance activities, including prompt rectification of rain cuts and other monsoon-related issues, were said to be part of standard procedure to ensure safety and serviceability. The footage triggered political criticism, with Opposition parties alleging compromised construction quality on a flagship project and asserting that repeated repairs pointed to deeper governance and accountability concerns. The Samajwadi Party accused the expressway of needing repairs for the second time in 17 days, while the UP Congress described the condition as evidence of corruption and a risk to public safety. NHAI maintained that the affected stretch has been restored and that normal traffic movement is being observed.

Related Stories

Gold Stories

Next Story
Real Estate

LML Realty Sells Out Jhirka Valley Industrial Park in Haryana

LML Realty, the real estate arm of LML Group, recently announced the complete sell-out of its Jhirka Valley Industrial Park in Haryana, with over 1.17 million sq ft of industrial space acquired by more than 50 companies. With utilities and internal infrastructure in place, the company has commenced plot handovers, enabling buyers to begin construction and establish their operations.The industrial park has attracted companies across diverse sectors, including chemicals, metals and alloys, textiles, electrical equipment, energy, logistics, construction, polymers and engineering. Key buyers inclu..

Next Story
Real Estate

WSB Real Estate Partners Exits Six Housing Investments

WSB Real Estate Partners recently announced the successful exit of six residential investments across Bengaluru, Mumbai Metropolitan Region (MMR) and National Capital Region (NCR), delivering an average internal rate of return (IRR) of 19–21 per cent and an overall investment return of 1.4 times.The real estate-focused investment firm invested approximately Rs 7 billion across six mid-affordable housing projects over the past four years. All six investments were fully repaid between April and November 2026, several months ahead of their original investment tenures.WSB collaborated with sever..

Next Story
Infrastructure Transport

Aluminium Industry Seeks Policy Support for Rs 4 Trillion Investment

The Aluminium Association of India (AAI) has recently urged the government to introduce supportive policy measures to safeguard the sector’s proposed Rs 4 trillion investment pipeline. The association highlighted the need for a predictable policy framework to strengthen domestic manufacturing, expand production capacity and reduce import dependence.AAI submitted its recommendations for the Union Budget 2027-28 to the Ministries of Finance, Commerce and Industry, and Mines, along with the Department for Promotion of Industry and Internal Trade (DPIIT).India’s aluminium demand is projected t..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code