NHAI Suspends Toll On Kanpur Lucknow Expressway
ROADS & HIGHWAYS

NHAI Suspends Toll On Kanpur Lucknow Expressway

The National Highways Authority of India (NHAI) suspended toll collection on the Kanpur–Lucknow Expressway until repairs to a damaged stretch are completed and initiated disciplinary action against the concessionaire, the project engineer and several officials for alleged lapses in execution and supervision. The authority said the decision followed widespread complaints about damaged portions and patchwork at various locations on the expressway within weeks of its inauguration on 13 July.

The 63 km long expressway has drawn criticism from commuters, who posted videos on social media showing defects, particularly on the Unnao–Lucknow carriageway. Reports indicated that motorists were being charged a one-way fee of Rs 275 for car, jeep or van traffic, while an annual pass had been permitted at the toll plaza.

NHAI stated that tolls will remain suspended until complete rectification and that the authority will seek recovery of the toll loss from the concessionaire. Restoration work began immediately after a reported slippage near kilometre 64 on 26 July and traffic was redirected at the affected location.

The authority has proposed declaring concessionaire PNC Infratech Ltd a non-performer, which would render the company ineligible to bid for future NHAI projects, and has initiated disciplinary proceedings against named contractors and supervisory staff. At present traffic is being allowed to ply smoothly on diverted sections while engineers assess and repair the damaged carriageway.

NHAI said monitoring of restoration work will continue and that no toll will be charged until rectification is complete, without giving a firm timeline for reopening the toll collection. The authority emphasised that recovery mechanisms and contractual remedies are being pursued as part of efforts to ensure accountability and upkeep of national highway assets. Officials will continue inspections and coordinate repairs with the concessionaire until full restoration is certified.

The National Highways Authority of India (NHAI) suspended toll collection on the Kanpur–Lucknow Expressway until repairs to a damaged stretch are completed and initiated disciplinary action against the concessionaire, the project engineer and several officials for alleged lapses in execution and supervision. The authority said the decision followed widespread complaints about damaged portions and patchwork at various locations on the expressway within weeks of its inauguration on 13 July. The 63 km long expressway has drawn criticism from commuters, who posted videos on social media showing defects, particularly on the Unnao–Lucknow carriageway. Reports indicated that motorists were being charged a one-way fee of Rs 275 for car, jeep or van traffic, while an annual pass had been permitted at the toll plaza. NHAI stated that tolls will remain suspended until complete rectification and that the authority will seek recovery of the toll loss from the concessionaire. Restoration work began immediately after a reported slippage near kilometre 64 on 26 July and traffic was redirected at the affected location. The authority has proposed declaring concessionaire PNC Infratech Ltd a non-performer, which would render the company ineligible to bid for future NHAI projects, and has initiated disciplinary proceedings against named contractors and supervisory staff. At present traffic is being allowed to ply smoothly on diverted sections while engineers assess and repair the damaged carriageway. NHAI said monitoring of restoration work will continue and that no toll will be charged until rectification is complete, without giving a firm timeline for reopening the toll collection. The authority emphasised that recovery mechanisms and contractual remedies are being pursued as part of efforts to ensure accountability and upkeep of national highway assets. Officials will continue inspections and coordinate repairs with the concessionaire until full restoration is certified.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code