Noida Authority Approves Rs. 2.8 bn Road Extension
ROADS & HIGHWAYS

Noida Authority Approves Rs. 2.8 bn Road Extension

The Noida Authority has approved Rs. 2.8 bn to extend the Yamuna Pushta Road by 10 km from Sector 135 to the Yamuna Expressway through Sector 150. The project is intended to create an alternative connection between Noida, Greater Noida and areas administered by the Yamuna Expressway Industrial Development Authority.

The existing 11.5 km road begins at Okhla Barrage near Kalindi Kunj and ends at Sector 135. An embankment exists between sectors 135 and 150, but it is not currently suitable for motor vehicles. The proposed extension will run parallel to the Noida-Greater Noida Expressway and connect with the Yamuna Expressway after passing through Sector 150.

The Uttar Pradesh irrigation department will develop the four-lane road, while the Noida Authority will provide the funding. The authority is preparing to issue a tender for the work. Once completed, the route will allow commuters from Kalindi Kunj and other parts of Noida to reach the Yamuna Expressway without depending entirely on the existing expressway corridor.

The extension has been under consideration for several months as the authorities seek to reduce congestion on the Noida-Greater Noida Expressway. Officials also said the existing Yamuna Pushta Road is being redeveloped by the Noida Authority and the irrigation department at a cost of Rs. 340 mn.

Separately, the authorities are examining a 50 km elevated corridor along the Yamuna embankment from Kalindi Kunj to Yeida Sector 32C. The route is planned to pass through sectors 95, 125 to 135, with loops providing access to adjoining areas. Noida, Greater Noida and Yamuna authorities, along with the National Highways Authority of India (NHAI), have approved extending the elevated road towards Noida International Airport. The project is estimated to cost Rs. 40 bn, and NHAI is preparing a detailed project report.

The Noida Authority has approved Rs. 2.8 bn to extend the Yamuna Pushta Road by 10 km from Sector 135 to the Yamuna Expressway through Sector 150. The project is intended to create an alternative connection between Noida, Greater Noida and areas administered by the Yamuna Expressway Industrial Development Authority. The existing 11.5 km road begins at Okhla Barrage near Kalindi Kunj and ends at Sector 135. An embankment exists between sectors 135 and 150, but it is not currently suitable for motor vehicles. The proposed extension will run parallel to the Noida-Greater Noida Expressway and connect with the Yamuna Expressway after passing through Sector 150. The Uttar Pradesh irrigation department will develop the four-lane road, while the Noida Authority will provide the funding. The authority is preparing to issue a tender for the work. Once completed, the route will allow commuters from Kalindi Kunj and other parts of Noida to reach the Yamuna Expressway without depending entirely on the existing expressway corridor. The extension has been under consideration for several months as the authorities seek to reduce congestion on the Noida-Greater Noida Expressway. Officials also said the existing Yamuna Pushta Road is being redeveloped by the Noida Authority and the irrigation department at a cost of Rs. 340 mn. Separately, the authorities are examining a 50 km elevated corridor along the Yamuna embankment from Kalindi Kunj to Yeida Sector 32C. The route is planned to pass through sectors 95, 125 to 135, with loops providing access to adjoining areas. Noida, Greater Noida and Yamuna authorities, along with the National Highways Authority of India (NHAI), have approved extending the elevated road towards Noida International Airport. The project is estimated to cost Rs. 40 bn, and NHAI is preparing a detailed project report.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Signature Global Consortium Wins 475-Acre Raigad Parcel for Rs. 1.94 bn

Signature Global has emerged as the successful bidder for a 474.66-acre land parcel in Maharashtra’s Raigad district for Rs. 1.94 bn through an online auction conducted under the asset monetisation process of PACL. The acquisition marks the Gurugram-based developer’s entry into the Mumbai Metropolitan Region (MMR). The consortium was led by Maa Vaishno Net-Tech, a wholly owned subsidiary of Signature Global. Under the consortium arrangement, 35 per cent equity in the subsidiary will be diluted, subject to necessary approvals, with the other partners acquiring the stake. Signature Global wi..

Next Story
Real Estate

K Raheja Corp to Develop 165-Acre Township in Mumbai MMR

Mumbai-based real estate developer K Raheja Corp has entered into a joint development agreement with landowners to develop a 165-acre mixed-use township in Panvel, within the Mumbai Metropolitan Region. The agreement provides for revenue sharing between the developer and the landowners. Real estate data analytics firm CRE Matrix reviewed the joint development agreement, which was registered earlier this month. The document covers a large land parcel in Panvel, a growing development centre in the Mumbai Metropolitan Region and an important part of the wider Mumbai property market. Under the arr..

Next Story
Infrastructure Urban

Khan Market Ranks 24th Among World's Most Expensive Retail Streets

Delhi’s Khan Market has retained its 24th position among the world’s most expensive high-street retail locations, with annual rents rising 14 per cent year-on-year to about USD 238 per sq ft, according to real estate consultant Cushman & Wakefield. The market remains India’s most expensive high street. New York City’s Upper Fifth Avenue reclaimed the top position globally, overtaking London’s New Bond Street. Annual rents on the New York street increased 35 per cent to USD 2,700 per sq ft, after it ranked third in 2025. New Bond Street was second at USD 2,230 per sq ft, while Milanâ€..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code