PMRDA to Build 50 Km Concrete Road Along Pune Metro 3
ROADS & HIGHWAYS

PMRDA to Build 50 Km Concrete Road Along Pune Metro 3

The Pune Metropolitan Region Development Authority (PMRDA) has announced plans to construct a 50-kilometre cement-concrete road parallel to Pune Metro Line 3, linking Maan in Hinjewadi with Shivajinagar.
This new corridor will play a vital role in improving travel between Pune’s IT hub and the city centre, aiming to resolve persistent issues such as traffic congestion, surface degradation, and poor drainage along the current route.
The authority has opted for cement-concrete over conventional asphalt to improve the road’s durability and reduce long-term maintenance expenses. The project is aligned with the ongoing development of Metro Line 3 and is intended to foster a more integrated urban transport system.
Once completed, the road is expected to enhance last-mile connectivity, reduce vehicle wear and tear, and support economic growth in the Hinjewadi–Shivajinagar corridor. PMRDA will work closely with multiple agencies to ensure smooth coordination and timely delivery of the project. 

The Pune Metropolitan Region Development Authority (PMRDA) has announced plans to construct a 50-kilometre cement-concrete road parallel to Pune Metro Line 3, linking Maan in Hinjewadi with Shivajinagar.This new corridor will play a vital role in improving travel between Pune’s IT hub and the city centre, aiming to resolve persistent issues such as traffic congestion, surface degradation, and poor drainage along the current route.The authority has opted for cement-concrete over conventional asphalt to improve the road’s durability and reduce long-term maintenance expenses. The project is aligned with the ongoing development of Metro Line 3 and is intended to foster a more integrated urban transport system.Once completed, the road is expected to enhance last-mile connectivity, reduce vehicle wear and tear, and support economic growth in the Hinjewadi–Shivajinagar corridor. PMRDA will work closely with multiple agencies to ensure smooth coordination and timely delivery of the project. 

Next Story
Infrastructure Transport

Tripura Rail Survey Approved For Jirania–Bodhjung Link

The Ministry of Railways has approved a Final Location Survey (FLS) for a proposed new railway line between Jirania and Bodhjung Nagar in Tripura. The planned section will span 14 km and is estimated to cost around Rs 4.2 million, with the entire alignment located within West Tripura district. The approval marks a key step towards strengthening railway infrastructure and supporting industrial growth in the state. Bodhjung Nagar is Tripura’s principal industrial and commercial hub, developed mainly for resource-based industries such as rubber, bamboo and food processing. The proposed Jirania..

Next Story
Infrastructure Transport

MCF Raebareli Rolls Out Its 15,000th Passenger Coach

The Modern Coach Factory (MCF) in Raebareli, Uttar Pradesh, has reached a major production milestone with the manufacture of its 15,000th passenger coach on December 15, the Ministry of Railways said. During the current financial year 2025–26, the unit has produced a total of 1,310 coaches so far. Established in 2007 at Lalganj in Raebareli, MCF is among India’s most advanced passenger coach manufacturing facilities. Built at a cost of around Rs 31.92 billion, the factory has an installed annual capacity of 1,000 coaches and is located about 3 km from Lalganj on the Kanpur–Raebareli Roa..

Next Story
Infrastructure Transport

RVNL Wins Gandak River Rail Bridge Contract

Rail Vikas Nigam Limited (RVNL) has received a Letter of Award from North Eastern Railway for a major railway infrastructure project valued at Rs 1.65 billion. The contract relates to the construction of the substructure for a key railway bridge over the Gandak River. The bridge will be constructed between Paniyahwa and Valmikinagar stations as part of the doubling of the Gorakhpur Cantt–Valmikinagar railway section. Designed to enhance capacity and operational efficiency, the structure will comprise 14 spans of 61 metres each and will be supported by double D-type well foundations. The des..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App