PWD Declares Road Through Azam Khan University Open To Public
ROADS & HIGHWAYS

PWD Declares Road Through Azam Khan University Open To Public

The Public Works Department (PWD) has declared the road that runs through Samajwadi Party leader Azam Khan's Mohammad Ali Jauhar University campus in Rampur to be a public road. Signboards have been erected at the main gate indicating that the road is open for public use. The declaration formalises public access after years of restricted entry. Local residents and motorists had at times considered the route an important link within Rampur, and the formal declaration clarifies its legal status for everyday use.

The three-kilometre four-lane cement road was built by the PWD during the tenure of the Akhilesh Yadav-led Samajwadi Party in 2016-17 at an estimated cost of around Rs 171.6 mn. The route crosses the university grounds from the main entrance to the rear end. Officials note the construction pre-dates the subsequent closure of the gate. The construction formed part of a wider state infrastructure programme during that administration.

Access to the thoroughfare remained restricted after the university administration closed the main gate in 2019, which had prevented PWD personnel from entering the campus to carry out inspections or maintenance. The closure had limited movement for residents and through traffic who previously used the road as a link across the campus. The PWD decision restores the status of the road as a public right of way.

The move is expected to allow local commuters to resume use of the route and may reduce congestion on alternative roads in Rampur. The PWD declaration and the erection of signboards set out the practical steps taken to assert public access while the university administration and civic authorities adjust to the change. Further administrative or legal follow up has not been detailed in the available information. The announcement is likely to prompt coordination between the PWD and university for maintenance and safety measures on the stretch now designated for public use.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Public Works Department (PWD) has declared the road that runs through Samajwadi Party leader Azam Khan's Mohammad Ali Jauhar University campus in Rampur to be a public road. Signboards have been erected at the main gate indicating that the road is open for public use. The declaration formalises public access after years of restricted entry. Local residents and motorists had at times considered the route an important link within Rampur, and the formal declaration clarifies its legal status for everyday use. The three-kilometre four-lane cement road was built by the PWD during the tenure of the Akhilesh Yadav-led Samajwadi Party in 2016-17 at an estimated cost of around Rs 171.6 mn. The route crosses the university grounds from the main entrance to the rear end. Officials note the construction pre-dates the subsequent closure of the gate. The construction formed part of a wider state infrastructure programme during that administration. Access to the thoroughfare remained restricted after the university administration closed the main gate in 2019, which had prevented PWD personnel from entering the campus to carry out inspections or maintenance. The closure had limited movement for residents and through traffic who previously used the road as a link across the campus. The PWD decision restores the status of the road as a public right of way. The move is expected to allow local commuters to resume use of the route and may reduce congestion on alternative roads in Rampur. The PWD declaration and the erection of signboards set out the practical steps taken to assert public access while the university administration and civic authorities adjust to the change. Further administrative or legal follow up has not been detailed in the available information. The announcement is likely to prompt coordination between the PWD and university for maintenance and safety measures on the stretch now designated for public use.

Next Story
Infrastructure Transport

Uttar Pradesh Accelerates National Highway Projects

Uttar Pradesh Chief Minister Yogi Adityanath met Union Road Transport and Highways Minister Nitin Gadkari to review National Highway and road infrastructure projects. Officials from the National Highways Authority of India presented progress updates and proposals. Ministers directed acceleration of land acquisition, forest clearances, utility shifting and other formalities to expedite delivery. Officials said that since 2014 about 10,204 kilometres of National Highway projects have been awarded and nearly 9,329 kilometres completed, with 606 kilometres approved and 1,010 kilometres completed b..

Next Story
Infrastructure Transport

NHAI Completes Repairs at 33 of 40 Spots Along Gurugram NH-48

The National Highways Authority of India has rectified 33 of 40 deficient locations along an 11km stretch of the Delhi–Gurugram NH-48 corridor, following a joint inspection by the authority, the Municipal Corporation of Gurugram and the Gurugram Metropolitan Development Authority. The audit identified damaged footpaths, crash barriers, inadequate lane markings and poor sanitation at multiple points between Rajiv Chowk and Signature Towers. Repairs and maintenance works have been carried out over May and June as part of the exercise. The report noted broken crash barriers and roadside litteri..

Next Story
Infrastructure Urban

Mankhurd Maharashtra Nagar Flyover To Open By August 2027

The Brihanmumbai Municipal Corporation has said the Mankhurd-Maharashtra Nagar flyover will be operational by August 2027, as part of measures to ease congestion in the eastern suburbs. The structure will provide a direct link from the T Junction on the Sion-Panvel highway to the existing Ghatkopar-Mankhurd Link Road. The T Junction is one of the major traffic choke points in the eastern suburbs and records heavy flows of vehicles travelling to and from Navi Mumbai and Pune. Motorists currently spend more than 15 minutes at the signal during peak periods, according to civic data, prompting the..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement