State PWD Takes Over Two Hill Roads From GTA
ROADS & HIGHWAYS

State PWD Takes Over Two Hill Roads From GTA

The Bengal public works department has taken over two strategically important roads in the Darjeeling hills from the Gorkhaland Territorial Administration. The roads are Rohini Road (Subash Ghising Marg), linking NH110 with SH12 near Simulbari, and the under?construction Darjeeling Circular Road from Lebong Bazar to third Mile via Rangayroong tea garden. The state government has ordered preparation of detailed project reports after GTA requests dated 23 June 2026 and directed transfer of assets to the executive engineer of the Darjeeling highway division following administrative formalities.

An order issued by the roads wing on 27 July instructs the chief engineer?I, north zone, to prepare the DPRs through the relevant circle and division. The studies will cover construction of bridges and culverts where required and all associated works to ensure safe and resilient connectivity. The documents are intended to establish technical scope, standards and priority works for comprehensive strengthening and upgradation.

The Rohini Road takeover is expected to secure long term maintenance of a principal link between the hills and the plains and to improve year round access. The Circular Road, covering around 13 km, has been designed as an alternative route bypassing Ghoom where major approaches converge and congestion frequently occurs. Officials regard the move as significant for traffic management and regional connectivity.

Completion of the Circular Road is expected to provide a second approach from the southern side, ease pressure on existing routes and benefit residents and visitors. The project has been under discussion for nearly a decade and progress has been slow, prompting calls for clearer coordination. The DPR process should outline costs, timelines and priority interventions to move construction forward.

The Darjeeling member of parliament and the three hill members of the legislative assembly had urged the chief minister to place the roads under PWD control for improvement and maintenance. Local stakeholders welcomed the decision and expressed hope that DPR preparation will gather momentum. The PWD takeover aims to strengthen transport links, support tourism and improve movement of tea and agricultural produce while enhancing access to education and healthcare.

The Bengal public works department has taken over two strategically important roads in the Darjeeling hills from the Gorkhaland Territorial Administration. The roads are Rohini Road (Subash Ghising Marg), linking NH110 with SH12 near Simulbari, and the under?construction Darjeeling Circular Road from Lebong Bazar to third Mile via Rangayroong tea garden. The state government has ordered preparation of detailed project reports after GTA requests dated 23 June 2026 and directed transfer of assets to the executive engineer of the Darjeeling highway division following administrative formalities. An order issued by the roads wing on 27 July instructs the chief engineer?I, north zone, to prepare the DPRs through the relevant circle and division. The studies will cover construction of bridges and culverts where required and all associated works to ensure safe and resilient connectivity. The documents are intended to establish technical scope, standards and priority works for comprehensive strengthening and upgradation. The Rohini Road takeover is expected to secure long term maintenance of a principal link between the hills and the plains and to improve year round access. The Circular Road, covering around 13 km, has been designed as an alternative route bypassing Ghoom where major approaches converge and congestion frequently occurs. Officials regard the move as significant for traffic management and regional connectivity. Completion of the Circular Road is expected to provide a second approach from the southern side, ease pressure on existing routes and benefit residents and visitors. The project has been under discussion for nearly a decade and progress has been slow, prompting calls for clearer coordination. The DPR process should outline costs, timelines and priority interventions to move construction forward. The Darjeeling member of parliament and the three hill members of the legislative assembly had urged the chief minister to place the roads under PWD control for improvement and maintenance. Local stakeholders welcomed the decision and expressed hope that DPR preparation will gather momentum. The PWD takeover aims to strengthen transport links, support tourism and improve movement of tea and agricultural produce while enhancing access to education and healthcare.

Related Stories

Gold Stories

Next Story
Real Estate

LML Realty Sells Out Jhirka Valley Industrial Park in Haryana

LML Realty, the real estate arm of LML Group, recently announced the complete sell-out of its Jhirka Valley Industrial Park in Haryana, with over 1.17 million sq ft of industrial space acquired by more than 50 companies. With utilities and internal infrastructure in place, the company has commenced plot handovers, enabling buyers to begin construction and establish their operations.The industrial park has attracted companies across diverse sectors, including chemicals, metals and alloys, textiles, electrical equipment, energy, logistics, construction, polymers and engineering. Key buyers inclu..

Next Story
Real Estate

WSB Real Estate Partners Exits Six Housing Investments

WSB Real Estate Partners recently announced the successful exit of six residential investments across Bengaluru, Mumbai Metropolitan Region (MMR) and National Capital Region (NCR), delivering an average internal rate of return (IRR) of 19–21 per cent and an overall investment return of 1.4 times.The real estate-focused investment firm invested approximately Rs 7 billion across six mid-affordable housing projects over the past four years. All six investments were fully repaid between April and November 2026, several months ahead of their original investment tenures.WSB collaborated with sever..

Next Story
Infrastructure Transport

Aluminium Industry Seeks Policy Support for Rs 4 Trillion Investment

The Aluminium Association of India (AAI) has recently urged the government to introduce supportive policy measures to safeguard the sector’s proposed Rs 4 trillion investment pipeline. The association highlighted the need for a predictable policy framework to strengthen domestic manufacturing, expand production capacity and reduce import dependence.AAI submitted its recommendations for the Union Budget 2027-28 to the Ministries of Finance, Commerce and Industry, and Mines, along with the Department for Promotion of Industry and Internal Trade (DPIIT).India’s aluminium demand is projected t..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code