State PWD Takes Over Two Hill Roads From GTA
ROADS & HIGHWAYS

State PWD Takes Over Two Hill Roads From GTA

The Bengal public works department has taken over two strategically important roads in the Darjeeling hills from the Gorkhaland Territorial Administration. The roads are Rohini Road (Subash Ghising Marg), linking NH110 with SH12 near Simulbari, and the under?construction Darjeeling Circular Road from Lebong Bazar to third Mile via Rangayroong tea garden. The state government has ordered preparation of detailed project reports after GTA requests dated 23 June 2026 and directed transfer of assets to the executive engineer of the Darjeeling highway division following administrative formalities.

An order issued by the roads wing on 27 July instructs the chief engineer?I, north zone, to prepare the DPRs through the relevant circle and division. The studies will cover construction of bridges and culverts where required and all associated works to ensure safe and resilient connectivity. The documents are intended to establish technical scope, standards and priority works for comprehensive strengthening and upgradation.

The Rohini Road takeover is expected to secure long term maintenance of a principal link between the hills and the plains and to improve year round access. The Circular Road, covering around 13 km, has been designed as an alternative route bypassing Ghoom where major approaches converge and congestion frequently occurs. Officials regard the move as significant for traffic management and regional connectivity.

Completion of the Circular Road is expected to provide a second approach from the southern side, ease pressure on existing routes and benefit residents and visitors. The project has been under discussion for nearly a decade and progress has been slow, prompting calls for clearer coordination. The DPR process should outline costs, timelines and priority interventions to move construction forward.

The Darjeeling member of parliament and the three hill members of the legislative assembly had urged the chief minister to place the roads under PWD control for improvement and maintenance. Local stakeholders welcomed the decision and expressed hope that DPR preparation will gather momentum. The PWD takeover aims to strengthen transport links, support tourism and improve movement of tea and agricultural produce while enhancing access to education and healthcare.

The Bengal public works department has taken over two strategically important roads in the Darjeeling hills from the Gorkhaland Territorial Administration. The roads are Rohini Road (Subash Ghising Marg), linking NH110 with SH12 near Simulbari, and the under?construction Darjeeling Circular Road from Lebong Bazar to third Mile via Rangayroong tea garden. The state government has ordered preparation of detailed project reports after GTA requests dated 23 June 2026 and directed transfer of assets to the executive engineer of the Darjeeling highway division following administrative formalities. An order issued by the roads wing on 27 July instructs the chief engineer?I, north zone, to prepare the DPRs through the relevant circle and division. The studies will cover construction of bridges and culverts where required and all associated works to ensure safe and resilient connectivity. The documents are intended to establish technical scope, standards and priority works for comprehensive strengthening and upgradation. The Rohini Road takeover is expected to secure long term maintenance of a principal link between the hills and the plains and to improve year round access. The Circular Road, covering around 13 km, has been designed as an alternative route bypassing Ghoom where major approaches converge and congestion frequently occurs. Officials regard the move as significant for traffic management and regional connectivity. Completion of the Circular Road is expected to provide a second approach from the southern side, ease pressure on existing routes and benefit residents and visitors. The project has been under discussion for nearly a decade and progress has been slow, prompting calls for clearer coordination. The DPR process should outline costs, timelines and priority interventions to move construction forward. The Darjeeling member of parliament and the three hill members of the legislative assembly had urged the chief minister to place the roads under PWD control for improvement and maintenance. Local stakeholders welcomed the decision and expressed hope that DPR preparation will gather momentum. The PWD takeover aims to strengthen transport links, support tourism and improve movement of tea and agricultural produce while enhancing access to education and healthcare.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code