Trial Begins on Tunnel Linking Kedarnath and Badrinath Highways
ROADS & HIGHWAYS

Trial Begins on Tunnel Linking Kedarnath and Badrinath Highways

Trial traffic began on Monday on a bridge-tunnel route in Rudraprayag, Uttarakhand, connecting the Kedarnath and Badrinath national highways. Chief Minister Pushkar Singh Dhami inspected the project and said it would ease congestion in the town during the Chardham pilgrimage season.

The approximately 1.18-km route comprises a 200-metre bridge and a 900.30-metre tunnel constructed over the Alaknanda River under the Chardham Road Project. Built at a cost of Rs. 1.56 bn, it links Kedarnath National Highway (NH-107) with Badrinath National Highway (NH-07).

Dhami said the route would be formally inaugurated soon and, once regular traffic begins, pilgrims travelling to Kedarnath and Badrinath would not need to pass through the Rudraprayag market. Officials said this would reduce pressure on the town’s roads during the yatra and provide relief to residents and visitors affected by traffic jams.

The chief minister said improved road connectivity and modern infrastructure were intended to make the pilgrimage safer and more accessible while supporting local trade, tourism and employment. He also reviewed slope protection and stabilisation work in landslide-affected areas along the Rudraprayag-Gaurikund National Highway, where officials said the measures were aimed at reducing risks and improving road safety.

Dhami later visited the Sangam Library, established under the district administration’s Donate a Book, Plant a Tree of Knowledge campaign. The library has received more than 2,500 books covering competitive examinations, general knowledge, literature and other subjects, while Dhami contributed 150 books. District Magistrate Vishal Mishra said the material was being made available to students and readers, particularly young people preparing for competitive examinations, with public participation helping libraries become knowledge centres.

Trial traffic began on Monday on a bridge-tunnel route in Rudraprayag, Uttarakhand, connecting the Kedarnath and Badrinath national highways. Chief Minister Pushkar Singh Dhami inspected the project and said it would ease congestion in the town during the Chardham pilgrimage season. The approximately 1.18-km route comprises a 200-metre bridge and a 900.30-metre tunnel constructed over the Alaknanda River under the Chardham Road Project. Built at a cost of Rs. 1.56 bn, it links Kedarnath National Highway (NH-107) with Badrinath National Highway (NH-07). Dhami said the route would be formally inaugurated soon and, once regular traffic begins, pilgrims travelling to Kedarnath and Badrinath would not need to pass through the Rudraprayag market. Officials said this would reduce pressure on the town’s roads during the yatra and provide relief to residents and visitors affected by traffic jams. The chief minister said improved road connectivity and modern infrastructure were intended to make the pilgrimage safer and more accessible while supporting local trade, tourism and employment. He also reviewed slope protection and stabilisation work in landslide-affected areas along the Rudraprayag-Gaurikund National Highway, where officials said the measures were aimed at reducing risks and improving road safety. Dhami later visited the Sangam Library, established under the district administration’s Donate a Book, Plant a Tree of Knowledge campaign. The library has received more than 2,500 books covering competitive examinations, general knowledge, literature and other subjects, while Dhami contributed 150 books. District Magistrate Vishal Mishra said the material was being made available to students and readers, particularly young people preparing for competitive examinations, with public participation helping libraries become knowledge centres.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Bajaj Auto to Raise Monthly Electric 2W Capacity to 80,000 by March

Bajaj Auto plans to raise monthly production capacity for electric two-wheelers to around 80,000 units by the end of March, as demand for its Chetak electric scooter continues to exceed available output. The company currently has capacity for around 60,000 electric two-wheelers a month. Joint Managing Director Rakesh Sharma said production had returned to the existing full capacity after a supply chain disruption affected output. The issue had reduced recent production to around 40,000 units, resulting in a shortfall of 20,000 vehicles despite strong demand. The company expects to remove produ..

Next Story
Infrastructure Transport

India’s Domestic Air Passenger Traffic Falls 6.5% in September

India’s domestic air passenger traffic declined 6.49 per cent month on month to 11.8 mn in September, according to data released by the Directorate General of Civil Aviation (DGCA). IndiGo retained its leading position, carrying nearly two-thirds of domestic passengers, while the Air India Group remained the second-largest operator. IndiGo held a 65.4 per cent market share and transported 7.73 mn passengers during the month. The Air India Group accounted for 26.8 per cent of the market, carrying 3.165 mn passengers, based on data from the aviation regulator. Akasa Air ranked third with a 5.6..

Next Story
Infrastructure Urban

DPIIT Advances Trust-Based Governance Across India

The Department for Promotion of Industry and Internal Trade (DPIIT), under the Ministry of Commerce and Industry, is shifting India’s regulatory approach from permission-based administration to trust-based governance. The reforms seek to reduce business compliance, support startups, attract investment and simplify approvals across the country. According to an official statement, 47,957 compliance requirements have been reduced across Central Ministries and States and Union Territories. Of these, 22,290 have been digitised, 16,141 simplified, 5,255 decriminalised and 4,271 eliminated. The Jan..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code