Trial Begins on Tunnel Linking Kedarnath and Badrinath Highways
ROADS & HIGHWAYS

Trial Begins on Tunnel Linking Kedarnath and Badrinath Highways

Trial traffic began on Monday on a bridge-tunnel route in Rudraprayag, Uttarakhand, connecting the Kedarnath and Badrinath national highways. Chief Minister Pushkar Singh Dhami inspected the project and said it would ease congestion in the town during the Chardham pilgrimage season.

The approximately 1.18-km route comprises a 200-metre bridge and a 900.30-metre tunnel constructed over the Alaknanda River under the Chardham Road Project. Built at a cost of Rs. 1.56 bn, it links Kedarnath National Highway (NH-107) with Badrinath National Highway (NH-07).

Dhami said the route would be formally inaugurated soon and, once regular traffic begins, pilgrims travelling to Kedarnath and Badrinath would not need to pass through the Rudraprayag market. Officials said this would reduce pressure on the town’s roads during the yatra and provide relief to residents and visitors affected by traffic jams.

The chief minister said improved road connectivity and modern infrastructure were intended to make the pilgrimage safer and more accessible while supporting local trade, tourism and employment. He also reviewed slope protection and stabilisation work in landslide-affected areas along the Rudraprayag-Gaurikund National Highway, where officials said the measures were aimed at reducing risks and improving road safety.

Dhami later visited the Sangam Library, established under the district administration’s Donate a Book, Plant a Tree of Knowledge campaign. The library has received more than 2,500 books covering competitive examinations, general knowledge, literature and other subjects, while Dhami contributed 150 books. District Magistrate Vishal Mishra said the material was being made available to students and readers, particularly young people preparing for competitive examinations, with public participation helping libraries become knowledge centres.

Trial traffic began on Monday on a bridge-tunnel route in Rudraprayag, Uttarakhand, connecting the Kedarnath and Badrinath national highways. Chief Minister Pushkar Singh Dhami inspected the project and said it would ease congestion in the town during the Chardham pilgrimage season. The approximately 1.18-km route comprises a 200-metre bridge and a 900.30-metre tunnel constructed over the Alaknanda River under the Chardham Road Project. Built at a cost of Rs. 1.56 bn, it links Kedarnath National Highway (NH-107) with Badrinath National Highway (NH-07). Dhami said the route would be formally inaugurated soon and, once regular traffic begins, pilgrims travelling to Kedarnath and Badrinath would not need to pass through the Rudraprayag market. Officials said this would reduce pressure on the town’s roads during the yatra and provide relief to residents and visitors affected by traffic jams. The chief minister said improved road connectivity and modern infrastructure were intended to make the pilgrimage safer and more accessible while supporting local trade, tourism and employment. He also reviewed slope protection and stabilisation work in landslide-affected areas along the Rudraprayag-Gaurikund National Highway, where officials said the measures were aimed at reducing risks and improving road safety. Dhami later visited the Sangam Library, established under the district administration’s Donate a Book, Plant a Tree of Knowledge campaign. The library has received more than 2,500 books covering competitive examinations, general knowledge, literature and other subjects, while Dhami contributed 150 books. District Magistrate Vishal Mishra said the material was being made available to students and readers, particularly young people preparing for competitive examinations, with public participation helping libraries become knowledge centres.

Related Stories

Gold Stories

Next Story
Real Estate

Address Maker sells over 200 Apollo Address plots in six weeks

The Address Maker Group has sold more than two-thirds of the inventory at its Apollo Address villa-plot development in Nelamangala, North-West Bengaluru, within six weeks of its launch. With over 200 plots purchased and approximately 100 remaining, the project has recorded the fastest sales pace in the developer's history.Spread across 23 acres within a larger 90-acre township, Apollo Address offers villa plots ranging from 1,200 to 2,400 sq ft. Inspired by classical Greek architecture, the development features planned infrastructure, landscaped open spaces and residential amenities.Nearly 30 ..

Next Story
Equipment

Zoomlion strengthens equipment partnerships in Australia

Zoomlion Heavy Industry Science & Technology has reaffirmed its commitment to expanding operations in Australia, with Chairman and CEO Zhan Chunxin meeting customers and business partners in Sydney to strengthen long-term partnerships and discuss opportunities for closer collaboration.The meeting, held on 4 November 2026, focused on equipment quality, technical support, spare parts availability, local training and customer service improvements. Representatives from the tower crane, concrete machinery, earthmoving, aerial work platform, agricultural machinery and financial sectors participa..

Next Story
Real Estate

Rahul Mehta Architects unveils Mumbai cruise terminal design

Rahul Mehta Architects has unveiled the architectural design of the Mumbai International Cruise Terminal (MICT), described as India's first organised international cruise terminal. Located at Indira Dock, the project aims to transform Mumbai's historic waterfront into a destination combining cruise operations, retail, hospitality and public spaces.Appointed by maritime and logistics group JM Baxi, the architectural practice has designed the terminal to meet international cruise operational standards while creating a year-round public destination. The project has been developed under a public-p..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code