- Home
- Infrastructure Transport
- ROADS & HIGHWAYS
- UP Approves Two Expressways And Rs 240 bn Infrastructure Push
UP Approves Two Expressways And Rs 240 bn Infrastructure Push
The largest allocations include Rs 107.61 billion (Rs 107.61 bn) for an extension of the Ganga Expressway to Haridwar and Rs 79.68 billion (Rs 79.68 bn) for the Jhansi Link Expressway, with the state bearing the full cost of both projects. The Ganga extension is proposed as a six-lane greenfield corridor with provision for future expansion to eight lanes and is intended to improve connectivity between Bijnor, Lucknow and Haridwar. The Jhansi Link Expressway is designed to strengthen access to the Bundelkhand Industrial Development Authority region and the defence corridor around Jhansi. Detailed project reports and statutory approvals will be prepared before construction begins.
The Cabinet also approved Rs 2,722.5 mn for infrastructure development of an Integrated Manufacturing and Logistics Cluster close to the Purvanchal Expressway in Sultanpur, with a global tender to select the construction agency and the state meeting the cost of works. The cluster is intended to give prospective units access to an established high-speed road network and to attract both manufacturing and logistics investment while creating employment opportunities locally. Officials indicated that the works should support industrial expansion along the expressway corridor and improve supply chain efficiency for local producers.
Alongside infrastructure measures, the Cabinet cleared incentives for 11 projects with a combined proposed investment of Rs 55 bn, approving Letters of Comfort for eight projects totalling Rs 29,019.7 mn and for three projects totalling Rs 26,060.4 mn across several districts. Notable approvals include a Rs 15,736.2 mn aluminium beverage can unit in Unnao proposed to have an annual capacity of 1,300 mn units, a Rs 7,942.7 mn expansion in Bijnor with a planned maximum capacity of 75,000 t per year, and other medium sized investments intended to broaden the manufacturing base and generate employment. The finance minister said the Cabinet decisions aim to align expressway expansion with industrial development and support economic activity in adjoining areas.
The Uttar Pradesh Cabinet approved a series of infrastructure and industrial investment proposals totalling Rs 240 billion (Rs 240 bn), including two major expressway projects, a manufacturing and logistics cluster in Sultanpur and incentives for 11 industrial projects across the state. The decisions, taken at a meeting chaired by Chief Minister Yogi Adityanath, underline the state government’s focus on expanding road connectivity around emerging industrial hubs while attracting manufacturing investment to districts beyond major urban centres. The approvals cover both greenfield expressway construction and infrastructure works intended to enable private manufacturing activity. The largest allocations include Rs 107.61 billion (Rs 107.61 bn) for an extension of the Ganga Expressway to Haridwar and Rs 79.68 billion (Rs 79.68 bn) for the Jhansi Link Expressway, with the state bearing the full cost of both projects. The Ganga extension is proposed as a six-lane greenfield corridor with provision for future expansion to eight lanes and is intended to improve connectivity between Bijnor, Lucknow and Haridwar. The Jhansi Link Expressway is designed to strengthen access to the Bundelkhand Industrial Development Authority region and the defence corridor around Jhansi. Detailed project reports and statutory approvals will be prepared before construction begins. The Cabinet also approved Rs 2,722.5 mn for infrastructure development of an Integrated Manufacturing and Logistics Cluster close to the Purvanchal Expressway in Sultanpur, with a global tender to select the construction agency and the state meeting the cost of works. The cluster is intended to give prospective units access to an established high-speed road network and to attract both manufacturing and logistics investment while creating employment opportunities locally. Officials indicated that the works should support industrial expansion along the expressway corridor and improve supply chain efficiency for local producers. Alongside infrastructure measures, the Cabinet cleared incentives for 11 projects with a combined proposed investment of Rs 55 bn, approving Letters of Comfort for eight projects totalling Rs 29,019.7 mn and for three projects totalling Rs 26,060.4 mn across several districts. Notable approvals include a Rs 15,736.2 mn aluminium beverage can unit in Unnao proposed to have an annual capacity of 1,300 mn units, a Rs 7,942.7 mn expansion in Bijnor with a planned maximum capacity of 75,000 t per year, and other medium sized investments intended to broaden the manufacturing base and generate employment. The finance minister said the Cabinet decisions aim to align expressway expansion with industrial development and support economic activity in adjoining areas.
Related Stories
Gold Stories
97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion
Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..
First TBM Starts Digging Five Point Three Kilometre Tunnel Under SGNP
The Goregaon-Mulund Link Road (GMLR) Phase three (B) project has reached a key milestone as the first tunnel boring machine (TBM) began excavation of the first of two tunnels beneath the Sanjay Gandhi National Park (SGNP). The machine, named Tulsi, started cutting a five point three kilometre bore that will link Dadasaheb Phalke Chitranagari in Goregaon East with Amar Nagar in Mulund West. Officials issued a statement noting the commencement of tunnelling work under the protected green belt. The twin tunnels are being constructed using mechanised tunnelling methods that aim to limit surface di..
Related Articles
Latest Updates
Recommended for you
Advertisement
Subscribe to Our Newsletter
Get daily newsletters around different themes from Construction world.
subscribe to the newsletter
Don't miss out on valuable insights and opportunities
to connect with like minded professionals

