Coal India September Output Drops 3.9% to 48.97 MT Amid Monsoon Impact
COAL & MINING

Coal India September Output Drops 3.9% to 48.97 MT Amid Monsoon Impact

Coal India (CIL) reported a 3.9 per cent decline in coal production in September, reaching 48.97 million tonnes (MT) compared with 50.94 MT in the same month last year, according to a filing with the BSE.

The fall in output is attributed to heavy monsoon rains and waterlogging, which created operational challenges across mining units, though the company did not specify official reasons. Subsidiaries impacted include Bharat Coking Coal (BCCL), Central Coalfields (CCL), Western Coalfields (WCL), Mahanadi Coalfields (MCL), and North Eastern Coalfields (NEC).

Coal production for the April–September period also declined to 329.14 MT, down from 341.35 MT in the year-ago period. CIL remains the dominant player in India’s coal sector, accounting for over 80 per cent of domestic production.

Despite the slowdown, CIL has set ambitious targets for 2025–26, aiming for 875 MT in production and 900 MT in dispatches to meet rising power demand and reduce reliance on imported coal. 

News source: Business Standard

Coal India (CIL) reported a 3.9 per cent decline in coal production in September, reaching 48.97 million tonnes (MT) compared with 50.94 MT in the same month last year, according to a filing with the BSE.The fall in output is attributed to heavy monsoon rains and waterlogging, which created operational challenges across mining units, though the company did not specify official reasons. Subsidiaries impacted include Bharat Coking Coal (BCCL), Central Coalfields (CCL), Western Coalfields (WCL), Mahanadi Coalfields (MCL), and North Eastern Coalfields (NEC).Coal production for the April–September period also declined to 329.14 MT, down from 341.35 MT in the year-ago period. CIL remains the dominant player in India’s coal sector, accounting for over 80 per cent of domestic production.Despite the slowdown, CIL has set ambitious targets for 2025–26, aiming for 875 MT in production and 900 MT in dispatches to meet rising power demand and reduce reliance on imported coal. News source: Business Standard

Next Story
Infrastructure Transport

Tunnelling Begins for Thane, Borivali twin tunnel project

Tunnelling work has commenced for the 11.84-km Thane–Borivali Twin Tunnel, set to be India’s longest urban road tunnel, marking a key milestone in Mumbai’s infrastructure development.As per a post shared by Mumbai Metropolitan Region Development Authority on social media platform X, the tunnel boring machine (TBM) ‘Nayak’—the country’s largest single-shield hard rock TBM for an urban tunnel—was launched by Devendra Fadnavis on Tuesday. The event was attended by Eknath Shinde and Sunetra Pawar, among other dignitaries. A second TBM, ‘Arjuna’, is expected to be launched so..

Next Story
Infrastructure Transport

Large Format Store Planned At M G Road Metro Station

M G Road station in Bengaluru is set to host the city’s first large-format commercial and experience space, with planning led by Bangalore Metro Rail Corporation Limited. BMRCL has invited proposals to develop and operate a central business district destination at the Purple?Pink Line interchange. The plan positions the station as a commercial hub designed to serve a broad commuter base across the city. The proposal is part of a broader effort to activate transit nodes commercially. Tender documents set a minimum monthly rental of Rs 0.944 million (mn), inclusive of GST, for the large-format..

Next Story
Infrastructure Energy

Government Cancels Auction Of Eleven Critical Mineral Blocks

The government has cancelled the auction of 11 critical and strategic mineral blocks after receiving a poor investor response and failing to attract a sufficient number of qualified bidders. The decision represents a setback to plans to ramp up domestic exploration and production of critical minerals amid global supply chain disruptions and rising demand for materials used in clean energy and advanced technologies. The mines ministry issued an annulment notice setting out the reasons for the cancellations. The annulment notice indicated that the auction process for five mineral blocks was canc..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement