Gujarat Asks Factories to Curb Power Usage as Demand Surges
COAL & MINING

Gujarat Asks Factories to Curb Power Usage as Demand Surges

Gujarat has asked factories to reduce electricity consumption during evening hours as rising demand and low coal inventories at power plants put pressure on supplies. The western Indian state has also sought additional coal and electricity from the federal government to manage the tightening situation.

Uttar Gujarat Vij Company has sent messages to industries and citizens asking them to conserve power during the peak period from 5 p.m. to 11 p.m. The state has urged factories to voluntarily move production away from the evening peak, when the gap between demand and available supply is most challenging.

The appeal comes as half of India’s 191 coal-fired power plants are operating with critically low coal inventories, according to data from the Central Electricity Authority. Gujarat is also planning new coal, nuclear and battery-storage projects to support electricity needs over the longer term.

Hotter weather linked to El Niño, greater irrigation requirements and increased industrial activity have contributed to the rise in power consumption. Several states, including Punjab, Madhya Pradesh, Bihar, Kerala, Tamil Nadu and Himachal Pradesh, are seeking short-term coal-fired electricity through tenders, according to power ministry data.

India’s total coal inventories at power plants have declined by about 5 per cent since the beginning of October. At the same time, daily peak electricity demand has been 45 gigawatts (GW) to 50 GW higher than a year earlier. The gap between electricity demand and supply widened to 560 mn kilowatt-hours last month, the highest level since August 2023, government data showed. India’s limited battery capacity also makes it difficult to store clean electricity generated during daylight hours for use during the evening peak.

Gujarat has asked factories to reduce electricity consumption during evening hours as rising demand and low coal inventories at power plants put pressure on supplies. The western Indian state has also sought additional coal and electricity from the federal government to manage the tightening situation. Uttar Gujarat Vij Company has sent messages to industries and citizens asking them to conserve power during the peak period from 5 p.m. to 11 p.m. The state has urged factories to voluntarily move production away from the evening peak, when the gap between demand and available supply is most challenging. The appeal comes as half of India’s 191 coal-fired power plants are operating with critically low coal inventories, according to data from the Central Electricity Authority. Gujarat is also planning new coal, nuclear and battery-storage projects to support electricity needs over the longer term. Hotter weather linked to El Niño, greater irrigation requirements and increased industrial activity have contributed to the rise in power consumption. Several states, including Punjab, Madhya Pradesh, Bihar, Kerala, Tamil Nadu and Himachal Pradesh, are seeking short-term coal-fired electricity through tenders, according to power ministry data. India’s total coal inventories at power plants have declined by about 5 per cent since the beginning of October. At the same time, daily peak electricity demand has been 45 gigawatts (GW) to 50 GW higher than a year earlier. The gap between electricity demand and supply widened to 560 mn kilowatt-hours last month, the highest level since August 2023, government data showed. India’s limited battery capacity also makes it difficult to store clean electricity generated during daylight hours for use during the evening peak.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Welspun One unveils Diwali campaign for World Trade Center Thane

Welspun One has unveiled A Dream Diwali, a festive brand film promoting World Trade Center Thane, its proposed mixed-use development in the Mumbai Metropolitan Region (MMR). The campaign uses individual interpretations of an ideal Diwali to introduce the experiences and offerings planned at the development.The film follows different characters as they share their festive wishes and go about activities such as shopping, meeting friends, playing games and spending time with family. Through these everyday moments, the campaign presents the idea that celebrations are personal and that different ge..

Next Story
Equipment

BorgWarner secures three turbocharger contracts with global powertrain leader

BorgWarner has secured three new turbocharger contracts with a global powertrain technology company. The wins comprise one contract for its variable turbine geometry (VTG) turbocharger and two for its wastegate turbocharger. The technologies will be deployed in the customer's light-vehicle gasoline platforms in South America and Europe, with production scheduled to begin in 2027.The VTG turbochargers are designed for gasoline engines operating under demanding conditions and high-boost pressure requirements. They are engineered to support Miller-cycle engines and withstand exhaust temperatures ..

Next Story
Infrastructure Transport

International Digi Yatra Trials Begin at Seven Airports

India has begun trials of Digi Yatra for international passengers at seven airports, allowing eligible Indian passport holders to use facial recognition at selected airport checkpoints. The facility is currently limited to Indian nationals with e-passports travelling on selected international flights operated by Air India and IndiGo. The Civil Aviation Ministry announced the trials on 1 November, with testing scheduled through December 2026. A wider rollout is expected in 2027 after the ministry assesses passenger feedback gathered during the trial period, according to PTI. The system is inten..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code