+
India Drives Coal and Mineral Reforms for Green Growth
COAL & MINING

India Drives Coal and Mineral Reforms for Green Growth

India is undertaking major reforms in its coal and mineral sectors to meet growing energy needs while advancing sustainability goals, Union Coal and Mines Minister G Kishan Reddy stated. Domestic coal production surpassed 1 billion tonnes in 2024–25 and is projected to reach 1.6 billion tonnes by 2030.
Reddy highlighted the Coal Gasification Mission, targeting 100 million tonnes by 2030, supported by an Rs 8.5 billion incentive scheme, with seven projects already underway. Coal PSUs are diversifying into renewables, having added 1,900 MW of solar and wind capacity, aiming for 15 GW by 2030, with Neyveli Lignite Corporation contributing 10.11 GW.
On environmental initiatives, over 57,000 hectares of mined land have been reclaimed, with another 16,000 hectares targeted under Mission GREEN Coal Regions by 2030.
The minister noted that 542 mineral blocks, including 34 critical minerals, have been auctioned. Private and junior exploration agencies are now involved, supported by drone surveys, AI modelling, and remote sensing, with 13 exploration licences already granted.
Under the National Critical Minerals Mission, strategic stockpiles are being built and overseas assets secured. State-run KABIL has acquired lithium blocks in Argentina, while Rs 1.5 billion is allocated for domestic recycling and Centres of Excellence to boost research.
Reddy emphasised that coal will remain central to India’s energy mix even as renewables and critical mineral exploration expand.

India is undertaking major reforms in its coal and mineral sectors to meet growing energy needs while advancing sustainability goals, Union Coal and Mines Minister G Kishan Reddy stated. Domestic coal production surpassed 1 billion tonnes in 2024–25 and is projected to reach 1.6 billion tonnes by 2030.Reddy highlighted the Coal Gasification Mission, targeting 100 million tonnes by 2030, supported by an Rs 8.5 billion incentive scheme, with seven projects already underway. Coal PSUs are diversifying into renewables, having added 1,900 MW of solar and wind capacity, aiming for 15 GW by 2030, with Neyveli Lignite Corporation contributing 10.11 GW.On environmental initiatives, over 57,000 hectares of mined land have been reclaimed, with another 16,000 hectares targeted under Mission GREEN Coal Regions by 2030.The minister noted that 542 mineral blocks, including 34 critical minerals, have been auctioned. Private and junior exploration agencies are now involved, supported by drone surveys, AI modelling, and remote sensing, with 13 exploration licences already granted.Under the National Critical Minerals Mission, strategic stockpiles are being built and overseas assets secured. State-run KABIL has acquired lithium blocks in Argentina, while Rs 1.5 billion is allocated for domestic recycling and Centres of Excellence to boost research.Reddy emphasised that coal will remain central to India’s energy mix even as renewables and critical mineral exploration expand.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App