Adani Power Bags 1,234 MW Supply Contract from Uttarakhand
POWER & RENEWABLE ENERGY

Adani Power Bags 1,234 MW Supply Contract from Uttarakhand

Adani Power has received a Letter of Award (LoA) from Uttarakhand Power Corporation (UPCL) to supply 1,234 MW of thermal power under a long-term agreement lasting 25 years. The award followed the company’s selection as the successful bidder in UPCL’s tender, with the LoA issued on October 13, 2026.

The contract covers a net supply of 1,234 MW at the ex-bus level, supported by an installed capacity of 1,320 MW. The power supply agreement (PSA) will remain in force for 25 years and will operate according to the conditions set out in the LoA and the tender.

The award is subject to approval by the Uttarakhand Electricity Regulatory Commission (UERC) for adoption of the tariff under Section 63 of the Electricity Act, 2003. Adani Power disclosed the development in a regulatory filing, but the filing did not indicate when the tariff approval process would be completed.

Adani Power reported a 47.2 per cent year-on-year increase in net profit to Rs. 48.67 bn in Q1 FY27, while revenue rose 32.6 per cent to Rs. 193.22 bn. Power generation reached a record 31 bn units, and power sales increased 16.9 per cent year-on-year to 28.8 bn units, supported by higher electricity demand, increased operating capacity and new power purchase agreements.

The company, part of the Adani Group, is India’s largest private-sector thermal power producer. It generates and sells electricity to homes, businesses and industries, and is headquartered in Ahmedabad, Gujarat. Shares of Adani Power rose 2 per cent during intraday trading, although the stock was down 16.38 per cent over the previous three months and 27.11 per cent on a year-to-date basis.

Adani Power has received a Letter of Award (LoA) from Uttarakhand Power Corporation (UPCL) to supply 1,234 MW of thermal power under a long-term agreement lasting 25 years. The award followed the company’s selection as the successful bidder in UPCL’s tender, with the LoA issued on October 13, 2026. The contract covers a net supply of 1,234 MW at the ex-bus level, supported by an installed capacity of 1,320 MW. The power supply agreement (PSA) will remain in force for 25 years and will operate according to the conditions set out in the LoA and the tender. The award is subject to approval by the Uttarakhand Electricity Regulatory Commission (UERC) for adoption of the tariff under Section 63 of the Electricity Act, 2003. Adani Power disclosed the development in a regulatory filing, but the filing did not indicate when the tariff approval process would be completed. Adani Power reported a 47.2 per cent year-on-year increase in net profit to Rs. 48.67 bn in Q1 FY27, while revenue rose 32.6 per cent to Rs. 193.22 bn. Power generation reached a record 31 bn units, and power sales increased 16.9 per cent year-on-year to 28.8 bn units, supported by higher electricity demand, increased operating capacity and new power purchase agreements. The company, part of the Adani Group, is India’s largest private-sector thermal power producer. It generates and sells electricity to homes, businesses and industries, and is headquartered in Ahmedabad, Gujarat. Shares of Adani Power rose 2 per cent during intraday trading, although the stock was down 16.38 per cent over the previous three months and 27.11 per cent on a year-to-date basis.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

GEON Commissions 10 MW/20 MWh BESS in Jaisalmer

GEON, the future technologies division of Kabra Extrusiontechnik, has commissioned a 10 MW/20 MWh battery energy storage system (BESS) in Jaisalmer, Rajasthan, on an engineering, procurement and construction (EPC) basis.Executed in accordance with the Rajasthan Integrated Clean Energy Policy, 2024, the project covered detailed engineering and design, equipment procurement and supply, installation, testing and commissioning.The system has a power capacity of 10 MW and an energy storage capacity of 20 MWh. It is designed to improve energy management, support grid stability and facilitate the int..

Next Story
Infrastructure Urban

Tembo Lists on BSE, Expands Defence Manufacturing Plans

Tembo Global Industries has listed its equity shares on the Main Board of BSE while expanding its focus on defence manufacturing and unmanned aerial vehicle (UAV) technologies alongside its existing engineering and industrial businesses.Through its subsidiary, Tembo Classic Engineering, the company is developing manufacturing capabilities in small arms and ammunition. Its defence facility in Amravati, Maharashtra, is under development, with commercial production targeted for Q1 FY2028. The subsidiary has obtained government licences for ammunition and small-arms manufacturing.The company is co..

Next Story
Infrastructure Urban

Bondada Gets NSE In-Principle Nod for Main Board Migration

Bondada Engineering has received in-principle approval from the National Stock Exchange of India (NSE) to migrate its equity shares from the BSE SME Platform to NSE’s Capital Market Segment, or Main Board.The approval, conveyed through a letter dated 14 October 2026, follows BSE’s in-principle approval on 9 September 2026 for migration to its Main Board. The company now holds preliminary approvals to establish a presence on the Main Boards of both exchanges.Bondada Engineering will complete the subsequent formalities required under applicable regulatory and stock exchange requirements. The..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code