Bondada Engineering Bags LOI for 120 MWh Battery Storage Project
POWER & RENEWABLE ENERGY

Bondada Engineering Bags LOI for 120 MWh Battery Storage Project

Bondada Engineering has received a Letter of Intent (LOI) from Gujarat Industries Power Company (GIPCL) to develop a 20 MW/120 MWh Vanadium Redox Flow Battery Energy Storage System (VRFB BESS) in Vadodara, Gujarat. The project will be located at GIPCL’s 165 MW natural gas power plant complex and includes a 10-year operations and maintenance (O&M) contract.

The Hyderabad-based engineering, procurement and construction (EPC) company said the project would support its expansion into advanced energy storage technologies. It described the installation as India’s largest grid-scale Vanadium Redox Flow Battery Energy Storage System, positioning the project within the country’s growing battery energy storage market.

Bondada Engineering’s scope covers the engineering, procurement and construction of the 120 MWh VRFB-based system. It will also provide operations and maintenance services for 10 years. The project is scheduled for completion within 18 months of the receipt of the Notice of Award (NOA).

The company’s chairman and managing director, Dr Bondada Raghavendra Rao, said the project represented an important step in its expansion into advanced energy storage solutions. He noted that the increasing deployment of renewable energy in India would raise the importance of storage systems in maintaining reliable and efficient power supply.

Vanadium Redox Flow Battery technology is being considered for long-duration energy storage because it can store and discharge electricity over extended periods. The technology uses liquid electrolytes and is suited to applications requiring repeated charging and discharge cycles. The Government of India has set a target of deploying approximately 236 GWh of battery energy storage systems by 2030, indicating the scale of infrastructure required to support the country’s energy transition. Bondada Engineering’s project adds to the development of grid-scale storage capacity in Gujarat and broadens the company’s role beyond conventional EPC activities.

Bondada Engineering has received a Letter of Intent (LOI) from Gujarat Industries Power Company (GIPCL) to develop a 20 MW/120 MWh Vanadium Redox Flow Battery Energy Storage System (VRFB BESS) in Vadodara, Gujarat. The project will be located at GIPCL’s 165 MW natural gas power plant complex and includes a 10-year operations and maintenance (O&M) contract. The Hyderabad-based engineering, procurement and construction (EPC) company said the project would support its expansion into advanced energy storage technologies. It described the installation as India’s largest grid-scale Vanadium Redox Flow Battery Energy Storage System, positioning the project within the country’s growing battery energy storage market. Bondada Engineering’s scope covers the engineering, procurement and construction of the 120 MWh VRFB-based system. It will also provide operations and maintenance services for 10 years. The project is scheduled for completion within 18 months of the receipt of the Notice of Award (NOA). The company’s chairman and managing director, Dr Bondada Raghavendra Rao, said the project represented an important step in its expansion into advanced energy storage solutions. He noted that the increasing deployment of renewable energy in India would raise the importance of storage systems in maintaining reliable and efficient power supply. Vanadium Redox Flow Battery technology is being considered for long-duration energy storage because it can store and discharge electricity over extended periods. The technology uses liquid electrolytes and is suited to applications requiring repeated charging and discharge cycles. The Government of India has set a target of deploying approximately 236 GWh of battery energy storage systems by 2030, indicating the scale of infrastructure required to support the country’s energy transition. Bondada Engineering’s project adds to the development of grid-scale storage capacity in Gujarat and broadens the company’s role beyond conventional EPC activities.

Related Stories

Gold Stories

Next Story
Real Estate

Landmark Group plans Rs 150 billion NCR expansion

Landmark Group has announced expansion plans across two real estate projects in the National Capital Region (NCR), with a combined estimated sales potential of Rs 150 billion. The projects include Landmark One, a 2.1 million sq ft corporate office development on Golf Course Extension Road in Gurugram, and a proposed integrated hospitality, commercial and residential development on Dwarka Expressway.Landmark One has an estimated sales value of Rs 40 billion. The project involves an estimated construction investment of Rs 10 billion, apart from the underlying land, currently valued at around Rs ..

Next Story
Real Estate

RMZ entities secure 5-Star ratings in GRESB 2026

RMZ has been recognised as a Global and Regional Sector Leader in the 2026 Global Real Estate Sustainability Benchmark (GRESB) Real Estate Development Assessment, with three of its entities scoring 99.6 out of 100. RMZ Nexus LLP, Millenia Realtors Private Limited and Infralogix LLP secured 5-Star ratings in their respective categories across the Office and Industrial sectors.In the 2026 Development Benchmark, RMZ Nexus LLP and Millenia Realtors Private Limited were named Sector Leaders in the Office and Office Non-Listed categories in Asia. Infralogix LLP received the distinction in the Indust..

Next Story
Products

Schneider Electric deploys smart building systems at Jupiter Hospitals

Schneider Electric has partnered with Jupiter Hospitals to deploy connected building technologies aimed at improving energy efficiency, patient comfort and operational performance across its hospital campus. The deployment of its EcoStruxure Building Operation platform and SpaceLogic thermostats is helping the hospital achieve energy savings of up to 28 per cent, according to the company.With heating, ventilation and air-conditioning (HVAC) systems accounting for nearly 60 per cent of the hospital's total energy consumption, improving efficiency while maintaining the conditions required for pa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code