Green Data Centre Foundation Laid at CEL, Ghaziabad
POWER & RENEWABLE ENERGY

Green Data Centre Foundation Laid at CEL, Ghaziabad

Uttar Pradesh Chief Minister Yogi Adityanath and Union Minister Dr. Jitendra Singh recently laid the foundation stone of a state-of-the-art Green Data Centre at Central Electronics Limited (CEL), Ghaziabad. Developed under a Public-Private Partnership with ESDS, the ₹1,000 crore project will have a 30 MW capacity.

Dr. Singh praised CEL’s legacy in solar technology and its transformation through strategic collaboration, while the Chief Minister highlighted its contribution to rural electrification and infrastructure. The data centre will follow Tier III standards, with 200 high-density racks per floor, dual 10 Gbps links, and sustainable features such as rainwater harvesting, reflective roofing, and smart cooling.

The centre aims to attract startups, enterprises, and government agencies, and create skilled jobs. CEL’s revival model was commended as a benchmark for other PSUs. Dr. Singh also announced a Biotechnology Industrial Park in Lucknow and a Startup Conclave post-Independence Day.

Uttar Pradesh Chief Minister Yogi Adityanath and Union Minister Dr. Jitendra Singh recently laid the foundation stone of a state-of-the-art Green Data Centre at Central Electronics Limited (CEL), Ghaziabad. Developed under a Public-Private Partnership with ESDS, the ₹1,000 crore project will have a 30 MW capacity.Dr. Singh praised CEL’s legacy in solar technology and its transformation through strategic collaboration, while the Chief Minister highlighted its contribution to rural electrification and infrastructure. The data centre will follow Tier III standards, with 200 high-density racks per floor, dual 10 Gbps links, and sustainable features such as rainwater harvesting, reflective roofing, and smart cooling.The centre aims to attract startups, enterprises, and government agencies, and create skilled jobs. CEL’s revival model was commended as a benchmark for other PSUs. Dr. Singh also announced a Biotechnology Industrial Park in Lucknow and a Startup Conclave post-Independence Day.

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->