Mahanadi Coalfields Invites Bids for 1,086 kW Rooftop Solar Project
POWER & RENEWABLE ENERGY

Mahanadi Coalfields Invites Bids for 1,086 kW Rooftop Solar Project

Mahanadi Coalfields (MCL), a subsidiary of Coal India, has invited online bids to develop grid-connected rooftop solar power plants with an aggregated capacity of 1,086 kW at non-residential buildings in the Jagannath Open Cast Project (OCP) area of Odisha. The tender has been issued by the Staff Officer (E&M) of Jagannath Area.

The selected contractor will undertake engineering, design, supply, civil works, erection, testing and commissioning of the solar plants. The scope also covers net-metering arrangements, quality control, insurance and securing connectivity permissions under applicable Odisha policies.

The contract includes a Comprehensive Annual Maintenance Contract (CAMC) for five years after commissioning. The total completion period is 2,005 days, comprising 180 days for project execution and 1,825 days for maintenance. The estimated value of the work is Rs. 46.61 mn.

The tender requires an Earnest Money Deposit (EMD) of Rs. 583,000, payable online through net-banking or NEFT/RTGS. Eligible Micro and Small Enterprises are exempt from the EMD requirement under applicable provisions. For the successful bidder, the retained EMD will be adjusted against the Performance Security Deposit or Performance Bank Guarantee, with the applicable requirements governed by Coal India’s standard contract guidelines.

The tender was e-published on October 5, 2026, at 18:00 hours, while document downloads and bid submissions opened on October 6 at 10:00 hours. Clarifications can be sought online until October 14 at 17:00 hours. The deadline for downloading documents and submitting bids is October 21 at 17:00 hours, and technical bids under Cover-I will be opened on October 23 at 11:00 hours. The price-bid opening date will be announced separately.

Bidders must hold a valid Digital Signature Certificate issued by an authorised agency under the Controller of Certifying Authority, Government of India, and submit bids through the Coal India e-procurement portal. Offline submissions will not be accepted. MCL said any extensions, corrigenda or other changes would be notified through the portal, with the project expected to support renewable energy use in its operational infrastructure.

Mahanadi Coalfields (MCL), a subsidiary of Coal India, has invited online bids to develop grid-connected rooftop solar power plants with an aggregated capacity of 1,086 kW at non-residential buildings in the Jagannath Open Cast Project (OCP) area of Odisha. The tender has been issued by the Staff Officer (E&M) of Jagannath Area. The selected contractor will undertake engineering, design, supply, civil works, erection, testing and commissioning of the solar plants. The scope also covers net-metering arrangements, quality control, insurance and securing connectivity permissions under applicable Odisha policies. The contract includes a Comprehensive Annual Maintenance Contract (CAMC) for five years after commissioning. The total completion period is 2,005 days, comprising 180 days for project execution and 1,825 days for maintenance. The estimated value of the work is Rs. 46.61 mn. The tender requires an Earnest Money Deposit (EMD) of Rs. 583,000, payable online through net-banking or NEFT/RTGS. Eligible Micro and Small Enterprises are exempt from the EMD requirement under applicable provisions. For the successful bidder, the retained EMD will be adjusted against the Performance Security Deposit or Performance Bank Guarantee, with the applicable requirements governed by Coal India’s standard contract guidelines. The tender was e-published on October 5, 2026, at 18:00 hours, while document downloads and bid submissions opened on October 6 at 10:00 hours. Clarifications can be sought online until October 14 at 17:00 hours. The deadline for downloading documents and submitting bids is October 21 at 17:00 hours, and technical bids under Cover-I will be opened on October 23 at 11:00 hours. The price-bid opening date will be announced separately. Bidders must hold a valid Digital Signature Certificate issued by an authorised agency under the Controller of Certifying Authority, Government of India, and submit bids through the Coal India e-procurement portal. Offline submissions will not be accepted. MCL said any extensions, corrigenda or other changes would be notified through the portal, with the project expected to support renewable energy use in its operational infrastructure.

Related Stories

Gold Stories

Next Story
Real Estate

Landmark Group plans Rs 150 billion NCR expansion

Landmark Group has announced expansion plans across two real estate projects in the National Capital Region (NCR), with a combined estimated sales potential of Rs 150 billion. The projects include Landmark One, a 2.1 million sq ft corporate office development on Golf Course Extension Road in Gurugram, and a proposed integrated hospitality, commercial and residential development on Dwarka Expressway.Landmark One has an estimated sales value of Rs 40 billion. The project involves an estimated construction investment of Rs 10 billion, apart from the underlying land, currently valued at around Rs ..

Next Story
Real Estate

RMZ entities secure 5-Star ratings in GRESB 2026

RMZ has been recognised as a Global and Regional Sector Leader in the 2026 Global Real Estate Sustainability Benchmark (GRESB) Real Estate Development Assessment, with three of its entities scoring 99.6 out of 100. RMZ Nexus LLP, Millenia Realtors Private Limited and Infralogix LLP secured 5-Star ratings in their respective categories across the Office and Industrial sectors.In the 2026 Development Benchmark, RMZ Nexus LLP and Millenia Realtors Private Limited were named Sector Leaders in the Office and Office Non-Listed categories in Asia. Infralogix LLP received the distinction in the Indust..

Next Story
Products

Schneider Electric deploys smart building systems at Jupiter Hospitals

Schneider Electric has partnered with Jupiter Hospitals to deploy connected building technologies aimed at improving energy efficiency, patient comfort and operational performance across its hospital campus. The deployment of its EcoStruxure Building Operation platform and SpaceLogic thermostats is helping the hospital achieve energy savings of up to 28 per cent, according to the company.With heating, ventilation and air-conditioning (HVAC) systems accounting for nearly 60 per cent of the hospital's total energy consumption, improving efficiency while maintaining the conditions required for pa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code