Power Mech Secures Rs 2,662.6 mn O&M Contract For Adani Plant
POWER & RENEWABLE ENERGY

Power Mech Secures Rs 2,662.6 mn O&M Contract For Adani Plant

Power Mech Projects has secured a KPI-based operations and maintenance contract from Adani Infrastructure Management Services for a two 300 Megawatt (MW) thermal power plant at Butibori in Maharashtra. The domestic deal has a total value of Rs 2,662.6 million (Rs 2,662.6 million) and will be executed at arm's length. The company will provide services under a performance-linked framework.

The scope covers operations and maintenance under key performance indicators for the twin-unit plant and will run for 60 months from 01 July 2026 to 30 June 2031. The arrangement does not constitute a related party transaction, and the promoter and promoter group companies have no interest in the awarding entity. The contract is classified as a domestic order.

Power Mech Projects is an engineering and construction company that offers integrated services in erection, testing and commissioning (ETC) of boilers, turbines and generators, balance of plant work, civil works and operation and maintenance services across power, infrastructure and industrial sectors. The firm will apply its ETC and O&M capabilities to meet the KPI thresholds stipulated by the client. The engagement is expected to involve routine maintenance, performance optimisation and regulatory compliance activities.

In the quarter ended 31 March 2026, the company reported a 21.6 per cent increase in consolidated net profit to Rs 1,425.5 million (Rs 1,425.5 mn) from the corresponding period a year earlier, and revenue from operations rose 13.89 per cent to Rs 21,107.3 million (Rs 21,107.3 mn). Share trading reflected a modest positive reaction with the stock rising 0.55 per cent to Rs 25,013.10 on the BSE. Management stated that the contract will support recurring revenue and operational presence in Maharashtra.

The contract will be implemented through the company's existing operations team and will be monitored under the KPI framework for the duration of the agreement. The award reinforces the company's O&M credentials in the domestic thermal power segment.

Power Mech Projects has secured a KPI-based operations and maintenance contract from Adani Infrastructure Management Services for a two 300 Megawatt (MW) thermal power plant at Butibori in Maharashtra. The domestic deal has a total value of Rs 2,662.6 million (Rs 2,662.6 million) and will be executed at arm's length. The company will provide services under a performance-linked framework. The scope covers operations and maintenance under key performance indicators for the twin-unit plant and will run for 60 months from 01 July 2026 to 30 June 2031. The arrangement does not constitute a related party transaction, and the promoter and promoter group companies have no interest in the awarding entity. The contract is classified as a domestic order. Power Mech Projects is an engineering and construction company that offers integrated services in erection, testing and commissioning (ETC) of boilers, turbines and generators, balance of plant work, civil works and operation and maintenance services across power, infrastructure and industrial sectors. The firm will apply its ETC and O&M capabilities to meet the KPI thresholds stipulated by the client. The engagement is expected to involve routine maintenance, performance optimisation and regulatory compliance activities. In the quarter ended 31 March 2026, the company reported a 21.6 per cent increase in consolidated net profit to Rs 1,425.5 million (Rs 1,425.5 mn) from the corresponding period a year earlier, and revenue from operations rose 13.89 per cent to Rs 21,107.3 million (Rs 21,107.3 mn). Share trading reflected a modest positive reaction with the stock rising 0.55 per cent to Rs 25,013.10 on the BSE. Management stated that the contract will support recurring revenue and operational presence in Maharashtra. The contract will be implemented through the company's existing operations team and will be monitored under the KPI framework for the duration of the agreement. The award reinforces the company's O&M credentials in the domestic thermal power segment.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code