+
Solarium Energy Wins Additional Rs 2.01 Million Order from NTPC
POWER & RENEWABLE ENERGY

Solarium Energy Wins Additional Rs 2.01 Million Order from NTPC

Solarium Green Energy Limited has received an additional work order worth approximately Rs 20.1 million (exclusive of GST) from NTPC Vidyut Vyapar Nigam Limited. 

The order includes an additional 650 KW capacity for Troop Comforts Limited under the "Development of 6929 KW Grid Connected Rooftop Solar Projects" across various locations of the Central Armed Forces and Departments under the Ministry of Home Affairs (Zone 4, Uttar Pradesh), as per bid document NVVN/C&M/RE-313/2024-25 dated August 19, 2024.

Shares of Solarium Green Energy Limited last traded on the BSE at Rs 241.00, up from the previous close of Rs 236.05, with 7,200 shares exchanged across 12 trades.

(equitybulls)
                

Solarium Green Energy Limited has received an additional work order worth approximately Rs 20.1 million (exclusive of GST) from NTPC Vidyut Vyapar Nigam Limited. The order includes an additional 650 KW capacity for Troop Comforts Limited under the Development of 6929 KW Grid Connected Rooftop Solar Projects across various locations of the Central Armed Forces and Departments under the Ministry of Home Affairs (Zone 4, Uttar Pradesh), as per bid document NVVN/C&M/RE-313/2024-25 dated August 19, 2024.Shares of Solarium Green Energy Limited last traded on the BSE at Rs 241.00, up from the previous close of Rs 236.05, with 7,200 shares exchanged across 12 trades.(equitybulls)                

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code