Tamil Nadu Approves 100 Per Cent Charge Waiver for BESS
POWER & RENEWABLE ENERGY

Tamil Nadu Approves 100 Per Cent Charge Waiver for BESS

The Tamil Nadu state cabinet has approved the Battery Energy Storage System (BESS) Policy 2026 after detailed discussions, with the policy aimed at accelerating the installation of battery storage across power generation and transmission networks. It covers projects with a capacity of 1 MW and above and seeks to improve renewable energy utilisation while reducing the curtailment of electricity generated from renewable sources.

The policy recognises two categories of battery storage systems: standalone BESS and co-located BESS. Standalone BESS refers to independent systems with a capacity of more than 1 MW, which can be connected to transmission or distribution networks or to private consumer networks.

Standalone projects will be eligible for a 100 per cent waiver of applicable transmission and wheeling charges. The systems can be used to meet peak-hour demand, support grid operations and provide other services approved under the policy.

Co-located BESS refers to storage systems integrated with solar, solar-hybrid or other renewable energy projects with a capacity of more than 1 MW. These systems will store electricity produced by associated renewable energy plants and supply it during peak-demand periods or whenever required.

Co-located BESS projects linked to existing or new solar, wind or hybrid projects will also receive a 100 per cent waiver of applicable transmission and wheeling charges. The policy will apply to all BESS projects for which applications are submitted on or after the date of notification, as well as projects commissioned on or after April 1, 2027.

By covering both independent storage installations and systems paired with renewable energy projects, the policy establishes a common framework for deploying BESS across the state’s electricity network. The incentives are intended to support storage use during periods of peak demand and help renewable power reach the grid when it is needed.

The Tamil Nadu state cabinet has approved the Battery Energy Storage System (BESS) Policy 2026 after detailed discussions, with the policy aimed at accelerating the installation of battery storage across power generation and transmission networks. It covers projects with a capacity of 1 MW and above and seeks to improve renewable energy utilisation while reducing the curtailment of electricity generated from renewable sources. The policy recognises two categories of battery storage systems: standalone BESS and co-located BESS. Standalone BESS refers to independent systems with a capacity of more than 1 MW, which can be connected to transmission or distribution networks or to private consumer networks. Standalone projects will be eligible for a 100 per cent waiver of applicable transmission and wheeling charges. The systems can be used to meet peak-hour demand, support grid operations and provide other services approved under the policy. Co-located BESS refers to storage systems integrated with solar, solar-hybrid or other renewable energy projects with a capacity of more than 1 MW. These systems will store electricity produced by associated renewable energy plants and supply it during peak-demand periods or whenever required. Co-located BESS projects linked to existing or new solar, wind or hybrid projects will also receive a 100 per cent waiver of applicable transmission and wheeling charges. The policy will apply to all BESS projects for which applications are submitted on or after the date of notification, as well as projects commissioned on or after April 1, 2027. By covering both independent storage installations and systems paired with renewable energy projects, the policy establishes a common framework for deploying BESS across the state’s electricity network. The incentives are intended to support storage use during periods of peak demand and help renewable power reach the grid when it is needed.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Welspun One unveils Diwali campaign for World Trade Center Thane

Welspun One has unveiled A Dream Diwali, a festive brand film promoting World Trade Center Thane, its proposed mixed-use development in the Mumbai Metropolitan Region (MMR). The campaign uses individual interpretations of an ideal Diwali to introduce the experiences and offerings planned at the development.The film follows different characters as they share their festive wishes and go about activities such as shopping, meeting friends, playing games and spending time with family. Through these everyday moments, the campaign presents the idea that celebrations are personal and that different ge..

Next Story
Equipment

BorgWarner secures three turbocharger contracts with global powertrain leader

BorgWarner has secured three new turbocharger contracts with a global powertrain technology company. The wins comprise one contract for its variable turbine geometry (VTG) turbocharger and two for its wastegate turbocharger. The technologies will be deployed in the customer's light-vehicle gasoline platforms in South America and Europe, with production scheduled to begin in 2027.The VTG turbochargers are designed for gasoline engines operating under demanding conditions and high-boost pressure requirements. They are engineered to support Miller-cycle engines and withstand exhaust temperatures ..

Next Story
Infrastructure Transport

International Digi Yatra Trials Begin at Seven Airports

India has begun trials of Digi Yatra for international passengers at seven airports, allowing eligible Indian passport holders to use facial recognition at selected airport checkpoints. The facility is currently limited to Indian nationals with e-passports travelling on selected international flights operated by Air India and IndiGo. The Civil Aviation Ministry announced the trials on 1 November, with testing scheduled through December 2026. A wider rollout is expected in 2027 after the ministry assesses passenger feedback gathered during the trial period, according to PTI. The system is inten..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code