TNERC Approves 600 MW Solar-Storage Procurement
POWER & RENEWABLE ENERGY

TNERC Approves 600 MW Solar-Storage Procurement

The Tamil Nadu Electricity Regulatory Commission (TNERC) has approved the procurement of 600 MW of solar power integrated with a 300 MW/1,800 MWh Battery Energy Storage System (BESS). The Tamil Nadu Power Distribution Corporation (TNPDCL) will procure the power at a tariff of Rs. 3.12 per kWh, with the storage component intended to support supply during peak demand hours.

The arrangement provides 600 MW of solar power during solar-generation hours, including 300 MW backed by 1,800 MWh of storage for 6 hours during the designated peak period. The procurement is intended to address part of Tamil Nadu’s projected peak-hour power deficit and reduce the distribution utility’s reliance on short-term market purchases.

TNERC’s approval is based on an analysis submitted by TNPDCL. The assessment projects peak demand of 10,137 MW in FY 2031-32, rising to 12,443 MW in FY 2032-33, 13,768 MW in FY 2033-34 and 14,457 MW in FY 2034-35. The analysis indicates that shortages will continue despite other planned procurement arrangements.

TNPDCL will procure the power from the Solar Energy Corporation of India (SECI) under its Inter-State Transmission System-connected Tranche XXI Scheme. The discovered tariff of Rs. 3.12 per kWh will be accompanied by a trading margin of Rs. 0.07 per kWh payable to SECI. The original SECI tender covered 1,200 MW of solar power and 600 MW/3,600 MWh of storage with a 6-hour duration.

The commission said the storage system would enable contracted renewable power to be supplied during non-solar peak hours. The procurement is also intended to support TNPDCL’s Resource Adequacy obligations under the Electricity (Amendment) Rules, 2022, while improving the availability of renewable power and supporting grid stability. The measure follows concerns over recurring peak-hour shortages and the limitations of solar generation outside daylight hours.

The Tamil Nadu Electricity Regulatory Commission (TNERC) has approved the procurement of 600 MW of solar power integrated with a 300 MW/1,800 MWh Battery Energy Storage System (BESS). The Tamil Nadu Power Distribution Corporation (TNPDCL) will procure the power at a tariff of Rs. 3.12 per kWh, with the storage component intended to support supply during peak demand hours. The arrangement provides 600 MW of solar power during solar-generation hours, including 300 MW backed by 1,800 MWh of storage for 6 hours during the designated peak period. The procurement is intended to address part of Tamil Nadu’s projected peak-hour power deficit and reduce the distribution utility’s reliance on short-term market purchases. TNERC’s approval is based on an analysis submitted by TNPDCL. The assessment projects peak demand of 10,137 MW in FY 2031-32, rising to 12,443 MW in FY 2032-33, 13,768 MW in FY 2033-34 and 14,457 MW in FY 2034-35. The analysis indicates that shortages will continue despite other planned procurement arrangements. TNPDCL will procure the power from the Solar Energy Corporation of India (SECI) under its Inter-State Transmission System-connected Tranche XXI Scheme. The discovered tariff of Rs. 3.12 per kWh will be accompanied by a trading margin of Rs. 0.07 per kWh payable to SECI. The original SECI tender covered 1,200 MW of solar power and 600 MW/3,600 MWh of storage with a 6-hour duration. The commission said the storage system would enable contracted renewable power to be supplied during non-solar peak hours. The procurement is also intended to support TNPDCL’s Resource Adequacy obligations under the Electricity (Amendment) Rules, 2022, while improving the availability of renewable power and supporting grid stability. The measure follows concerns over recurring peak-hour shortages and the limitations of solar generation outside daylight hours.

Related Stories

Gold Stories

Next Story
Real Estate

Sumadhura leases 20,000 sq ft to Iron Hill Brewery in Bengaluru

Sumadhura Group has leased 20,000 sq ft of retail space to Iron Hill Brewery at Sumadhura Capitol Towers, its Grade A+ commercial development in Whitefield, East Bengaluru. The brewery is expected to commence operations at the property before the end of 2026.The development has also leased 3,700 sq ft to Yummy Bee, a café chain offering gluten-free and sugar-free products. The two additions will expand the food and beverage (F&B) offering at Capitol Towers, which combines office spaces with retail, dining and lifestyle facilities.Expanding the retail and F&B mixThe existing retail and..

Next Story
Real Estate

Peninsula Land enters Mumbai suburbs with Versova redevelopment

Peninsula Land, part of the Ashok Piramal Group, has signed a development agreement for the redevelopment of two adjoining residential societies in Versova, Andheri West, marking its entry into Mumbai’s western suburbs. Spread across approximately 1.5 acres, the project has an estimated gross development value (GDV) of Rs 7.5-7.75 billion.The consolidated land parcel is larger than the sub-one-acre developments typically seen in the Versova micro-market. According to the company, the larger site will allow it to develop a gated community with open spaces and integrated amenities.Commenting o..

Next Story
Technology

Goyal & Co. invests Rs 8.2 billion in Bengaluru tech park

Goyal & Co. is developing Titanium Tech Park, a 5 million sq ft commercial project in Whitefield’s technology corridor in Bengaluru, with an investment of approximately Rs 8.2 billion. Spread across 25 acres, the development has secured leasing commitments from global engineering companies Airbus and Caterpillar, which have taken up 880,000 sq ft and 300,000 sq ft, respectively. The combined annual rental value is estimated at Rs 1 billion.The project is being developed in multiple phases. Phase I comprises two operational office blocks of G+15 floors, offering 880,000 sq ft and 622,000 ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code