NHPC, JKSPDC form JV for 850 MW Ratle hydroelectric project
POWER & RENEWABLE ENERGY

NHPC, JKSPDC form JV for 850 MW Ratle hydroelectric project

NHPC has set up a JV company, Ratle Hydroelectric Power Corporation, with the Jammu & Kashmir State Power Development Corporation (JKSPDC), for the execution of the 850-MW Ratle hydroelectric project. The JV company was incorporated on June 1, 2021, with NHPC and JKSPDC having an equity sha...

NHPC has set up a JV company, Ratle Hydroelectric Power Corporation, with the Jammu & Kashmir State Power Development Corporation (JKSPDC), for the execution of the 850-MW Ratle hydroelectric project. The JV company was incorporated on June 1, 2021, with NHPC and JKSPDC having an equity share of 51 per cent and 49 per cent, respectively. Ratle Hydroelectric Project is a Run of River Scheme built on River Chenab located in the Kishtwar district in the Union Territory of Jammu and Kashmir. The Ministry of Power has already sent an investment approval for 850 MW Ratle HE Project formation at an approximate Rs.52.8194 bn.  Contact: NHPC.Website: www.nhpcindia.com

Next Story
Infrastructure Transport

NHAI to Build 6-Lane Agra-Gwalior Expressway on BOT (Toll) Mode

To enhance connectivity between the tourism hubs of Agra and Gwalior, National Highways Authority of India (NHAI) will develop 88 km long 6-lane access controlled Agra-Gwalior Greenfield Expressway (NH-719D). NHAI, today signed a concession agreement for the implementation of project with GR Infraprojects, in presence of NHAI Chairman, Santosh Kumar Yadav and senior officials of NHAI and the Concessionaire. The Agra-Gwalior Greenfield Expressway will start from Deori village in Agra and terminate at Susera village in Gwalior. The project shall be developed at a Total Capital Cost of Rs 46.13 b..

Next Story
Infrastructure Transport

Cabinet Nods 166.8-km NH-6 Greenfield Corridor on HAM Mode

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Narendra Modi has approved the proposal for Development, Maintenance and Management of 4-lane Greenfield Access Controlled 166.80 km of National Highway No. 06 from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam on Hybrid Annuity Mode as an access controlled greenfield High-Speed Corridor at a total capital cost of Rs 228.64 billion. The project length of 166.80 km lies in Meghalaya (144.80 km) and Assam (22.00 km). The proposed Greenfield high-speed corridor will improve the service level ..

Next Story
Infrastructure Urban

Commercial Ops Begin at Multi-Modal Logistics Park in Nagpur

Under the PM Gati Shakti initiative of Prime Minister with the aim to provide seamless and efficient connectivity for the movement of people, goods and services across various modes of transport, thereby enhancing last-mile connectivity and reducing travel time, and under the guidance of Union Minister of Road Transport and Highways, Nitin Gadkari, the Multi Modal Logistics Park, Nagpur (MMLP Nagpur) at Sindi, near Wardha commenced its commercial operations with a goal to establish a faster link. The MMLP Nagpur established by National Highway Logistics Management (NHLML), a 100 per cent own..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?