

Aizawl to Join Railway Network in July with New Rail Line
In a major boost to connectivity in the Northeast, Aizawl, the capital of Mizoram, is poised to be connected to the Indian railway network for the first time. The Rs 10.5 billion Bairabi–Sairang railway project is set for inauguration in July, with Prime Minister Narendra Modi expected to attend the ceremony.The 51.38-kilometre line will make Aizawl the fourth northeastern capital—after Itanagar, Agartala, and Guwahati—to be linked by rail, significantly improving logistics, travel, and trade in the region. Implemented by Northeast Frontier Railway (NFR), the line has received safety cle..

Vizhinjam Gateway Cargo To Begin By Early 2026
Vizhinjam International Seaport’s gateway freight operations are now expected to commence by December 2025 or January 2026, following delays in the construction of temporary road access to NH-66. While the port has functioned primarily as a transshipment hub since its commercial launch in July 2024, the phased introduction of export-import (exim) cargo is intended to align with infrastructure readiness and ensure smooth operational scale-up.The 1.7-kilometre temporary road linking the port to the national highway is still under construction, with monsoon-related challenges delaying completio..

EMS Wins Rs 1.04 Billion Contract For Agra Water Scheme
EMS Limited has emerged as the lowest bidder for an estimated Rs 1.04 billion infrastructure package under the Agra Water-Supply Re-organisation Scheme (Trans Yamuna Zones I and II), awarded by Uttar Pradesh Jal Nigam (Urban). The twenty-four-month, design-and-build contract spans the full project cycle—from surveying and soil investigation to engineering, procurement, construction, testing and commissioning.Scope includes an intake well-cum-pump house with approach bridge on the river, a 1 100-millimetre-diameter raw-water rising main linking the river intake to site, and a 55-million-litre..