+
NHAI Steps Up Flood Readiness On National Highways
ROADS & HIGHWAYS

NHAI Steps Up Flood Readiness On National Highways

National Highways Authority of India (NHAI) has launched a 15-day nationwide inspection drive to pinpoint stretches vulnerable to flooding and landslides, ensuring that culverts, bridges and side drains remain clear so rainwater can flow away freely when the monsoon intensifies.

Teams are desilting rain-water-harvesting pits, fixing outlets, repairing potholes on main carriageways and diversions, and clearing weep-holes in reinforced-earth walls to prevent recurring waterlogging that disrupts traffic each year.

Heavy machinery, sandbags, warning signage and other emergency materials have already been pre-positioned at known flood-prone sites, while round-the-clock Emergency Response Teams stand ready to restore connectivity at short notice. Quick-response units in field offices will micro-monitor high-risk spots in close co-ordination with local authorities.

Technology will play a larger role this season: AI-based Intelligent Traffic Management Systems will push real-time weather and congestion alerts to drivers via the RajmargYatra and IMD Meghdoot mobile apps, while drones check pavement cracks and verify proper road gradients.

These pre-emptive measures aim to deliver a safer, smoother journey for millions of highway users throughout the rains.


National Highways Authority of India (NHAI) has launched a 15-day nationwide inspection drive to pinpoint stretches vulnerable to flooding and landslides, ensuring that culverts, bridges and side drains remain clear so rainwater can flow away freely when the monsoon intensifies.Teams are desilting rain-water-harvesting pits, fixing outlets, repairing potholes on main carriageways and diversions, and clearing weep-holes in reinforced-earth walls to prevent recurring waterlogging that disrupts traffic each year.Heavy machinery, sandbags, warning signage and other emergency materials have already been pre-positioned at known flood-prone sites, while round-the-clock Emergency Response Teams stand ready to restore connectivity at short notice. Quick-response units in field offices will micro-monitor high-risk spots in close co-ordination with local authorities.Technology will play a larger role this season: AI-based Intelligent Traffic Management Systems will push real-time weather and congestion alerts to drivers via the RajmargYatra and IMD Meghdoot mobile apps, while drones check pavement cracks and verify proper road gradients.These pre-emptive measures aim to deliver a safer, smoother journey for millions of highway users throughout the rains.

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App