Baramati Airport in Maharashtra to Get Rs 1 bn Makeover
ECONOMY & POLICY

Baramati Airport in Maharashtra to Get Rs 1 bn Makeover

The state government is finalising a Rs 1 bn overhaul of the small uncontrolled Baramati airport, six months after the crash that killed deputy chief minister Ajit Pawar. The Maharashtra Airport Development Company (MADC) cleared the proposal and final approval is awaited from a committee led by the state chief secretary after the Maharashtra Industrial Development Corporation handed the airstrip to MADC in July 2025.

Built in the mid?1990s by then chief minister Sharad Pawar, the 1,600 m x 30 m runway remained neglected. The airstrip lacks a perimeter fence and was used mainly by the Pawar family, government officials and businesspersons. Two private flying schools operate there and students assist the air traffic control (ATC) unit because dedicated personnel are absent.

The facility has no emergency services and no fire tender, requiring help from the municipal council during the fatal accident and delaying response. Air traffic is limited, with 10 to 12 VVIP flights a month, but the shortage of basic safety infrastructure has persisted. The airstrip depends on Pune for meteorological information.

Proposed works include construction of an ATC tower and a fire station, recarpeting the runway and a runway?end safety area of 90 m at both ends. The plan also covers grading, storm water drainage, edge lights and installation of Precision Approach Path Indicator (PAPI) lights to aid approaches. An eight?km?long compound wall and an internal perimeter road are also proposed.

The proposal does not include an Instrument Landing System or a dedicated night landing system and is silent on establishing a permanent meteorological unit at the airstrip. Night operations currently rely on battery?powered lamps installed by students.

A former director of civil aviation urged correction of the runway’s inverted hump during recarpeting and expressed scepticism about sustaining political will once key leaders leave office, citing regional projects that stalled after leadership changes. Representatives of the flying fraternity welcomed the upgrades as overdue and urged implementation across MADC airports as basic safety requirements.

The state government is finalising a Rs 1 bn overhaul of the small uncontrolled Baramati airport, six months after the crash that killed deputy chief minister Ajit Pawar. The Maharashtra Airport Development Company (MADC) cleared the proposal and final approval is awaited from a committee led by the state chief secretary after the Maharashtra Industrial Development Corporation handed the airstrip to MADC in July 2025. Built in the mid?1990s by then chief minister Sharad Pawar, the 1,600 m x 30 m runway remained neglected. The airstrip lacks a perimeter fence and was used mainly by the Pawar family, government officials and businesspersons. Two private flying schools operate there and students assist the air traffic control (ATC) unit because dedicated personnel are absent. The facility has no emergency services and no fire tender, requiring help from the municipal council during the fatal accident and delaying response. Air traffic is limited, with 10 to 12 VVIP flights a month, but the shortage of basic safety infrastructure has persisted. The airstrip depends on Pune for meteorological information. Proposed works include construction of an ATC tower and a fire station, recarpeting the runway and a runway?end safety area of 90 m at both ends. The plan also covers grading, storm water drainage, edge lights and installation of Precision Approach Path Indicator (PAPI) lights to aid approaches. An eight?km?long compound wall and an internal perimeter road are also proposed. The proposal does not include an Instrument Landing System or a dedicated night landing system and is silent on establishing a permanent meteorological unit at the airstrip. Night operations currently rely on battery?powered lamps installed by students. A former director of civil aviation urged correction of the runway’s inverted hump during recarpeting and expressed scepticism about sustaining political will once key leaders leave office, citing regional projects that stalled after leadership changes. Representatives of the flying fraternity welcomed the upgrades as overdue and urged implementation across MADC airports as basic safety requirements.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Sabarmati Riverfront Two Plots Up for Auction at Rs2.24 bn Base Price

Two commercial plots on the western bank of the Sabarmati Riverfront will be auctioned with a base price of Rs 112 crore each, equivalent to Rs 1.12 bn apiece and Rs 2.24 billion in total. The parcels are located adjacent to the Metro Rail Bridge in Ahmedabad and form the first commercial offering after a prolonged pause. The Riverfront Development Corporation has framed the sale as part of a phased commercial release to revive development along the riverfront. The combined base valuation has been set by the corporation to reflect market rates along the riverfront. The corporation has fixed a ..

Next Story
Infrastructure Urban

Andhra Pradesh to Connect Over One Million Streetlights

Andhra Pradesh will undertake a statewide smart streetlighting programme across all 123 Urban Local Bodies (ULBs), bringing around 1.05 million (mn) streetlights under an AI enabled monitoring and management system. The programme will be implemented by Energy Efficiency Services Limited (EESL) with the Commissioner and Director of Municipal Administration under the state Municipal Administration and Urban Development Department. The project aims to convert conventional streetlighting into a digitally managed municipal service monitored and maintained remotely. The initial phase will cover abou..

Next Story
Infrastructure Urban

AMC To Procure Four Machines For Guard Rail Cleaning

Ahmedabad Municipal Corporation will introduce four specialised machines for cleaning guard railings along major roads and the central verges of BRTS and Metro corridors. The civic body plans to replace manual labour with mechanised cleaning to improve maintenance of road infrastructure and greenery. The purchase is estimated at Rs 82.8 million (mn), excluding GST. The proposal sets the base price of each machine at about Rs 20.7 million (mn) so four units total Rs 82.8 million (mn) before GST. 18 per cent GST will be applicable separately. During the warranty period each machine will operate ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement