Paralakhemundi Station Redeveloped Under Amrit Bharat Scheme
ECONOMY & POLICY

Paralakhemundi Station Redeveloped Under Amrit Bharat Scheme

Paralakhemundi railway station in Odisha's Gajapati district has been redeveloped under the Amrit Bharat Station Scheme (ABSS) at a cost of Rs 170 million (Rs 170 mn) and is among 59 stations in the State to be upgraded under the programme. The redevelopment has achieved 100 per cent physical and financial completion and was scheduled to be inaugurated by the Prime Minister on Friday. The project blends conservation and modernisation while aiming to enhance passenger convenience. Officials indicated the upgrade aims to integrate local design motifs with durable materials to reduce maintenance needs and support tourism.

The new station building covers 1,375 sq. metres and takes architectural inspiration from the historic Paralakhemundi Royal Palace, incorporating murals and charcoal artwork that reflect the region's cultural heritage. Platforms have been improved and shelters expanded to accommodate increased passenger flow. A new 12-metre-wide foot overbridge links platforms and improves circulation.

Passenger amenities now include a spacious waiting hall, enhanced seating, a catering unit and a One Station One Product (OSOP) outlet to promote local goods and artisans. The station has been made Divyangjan-friendly with lifts connecting both platforms, tactile pathways, ramps, Braille maps, accessible toilets and low-height ticket counters along with designated parking spaces. Additional conveniences include automatic ticket vending machines and RO drinking water facilities.

Safety and information systems have been upgraded with a public announcement system, coach position display system, train indication boards, CCTV surveillance and firefighting equipment. Sustainability measures comprise rainwater harvesting, solar power and landscaped green spaces around the station. Paralakhemundi is part of a wider national mission to modernise stations under the Amrit Bharat Station Scheme and seeks to preserve the architectural and cultural identity of each location while delivering modern passenger services. The scheme's emphasis on heritage conservation alongside modern services is intended to boost regional connectivity and passenger experience.

Paralakhemundi railway station in Odisha's Gajapati district has been redeveloped under the Amrit Bharat Station Scheme (ABSS) at a cost of Rs 170 million (Rs 170 mn) and is among 59 stations in the State to be upgraded under the programme. The redevelopment has achieved 100 per cent physical and financial completion and was scheduled to be inaugurated by the Prime Minister on Friday. The project blends conservation and modernisation while aiming to enhance passenger convenience. Officials indicated the upgrade aims to integrate local design motifs with durable materials to reduce maintenance needs and support tourism. The new station building covers 1,375 sq. metres and takes architectural inspiration from the historic Paralakhemundi Royal Palace, incorporating murals and charcoal artwork that reflect the region's cultural heritage. Platforms have been improved and shelters expanded to accommodate increased passenger flow. A new 12-metre-wide foot overbridge links platforms and improves circulation. Passenger amenities now include a spacious waiting hall, enhanced seating, a catering unit and a One Station One Product (OSOP) outlet to promote local goods and artisans. The station has been made Divyangjan-friendly with lifts connecting both platforms, tactile pathways, ramps, Braille maps, accessible toilets and low-height ticket counters along with designated parking spaces. Additional conveniences include automatic ticket vending machines and RO drinking water facilities. Safety and information systems have been upgraded with a public announcement system, coach position display system, train indication boards, CCTV surveillance and firefighting equipment. Sustainability measures comprise rainwater harvesting, solar power and landscaped green spaces around the station. Paralakhemundi is part of a wider national mission to modernise stations under the Amrit Bharat Station Scheme and seeks to preserve the architectural and cultural identity of each location while delivering modern passenger services. The scheme's emphasis on heritage conservation alongside modern services is intended to boost regional connectivity and passenger experience.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

NABARD, NaBFID Partner to Fund Rural Infrastructure

The National Bank for Agriculture and Rural Development (NABARD) and the National Bank for Financing Infrastructure and Development (NaBFID) have signed a Memorandum of Understanding (MoU) to collaborate on financing infrastructure projects with significant rural impact.The partnership combines NABARD’s expertise in rural and agricultural infrastructure with NaBFID’s specialised infrastructure financing capabilities. It will focus on joint financing, knowledge sharing and developing financing solutions to improve access to long-term, competitively priced capital for rural infrastructure an..

Next Story
Infrastructure Energy

Advait Energy Wins Rs 1.34 Billion MPPTCL Order

Advait Energy Transitions (AETL) has secured a Rs 1.34 billion turnkey contract from Madhya Pradesh Power Transmission Co. Ltd. (MPPTCL) for the design, manufacturing and supply of Emergency Restoration Systems (ERS) for 400kV, 220kV and 132kV EHV transmission lines.The order, received against Tender No. TR-23/2025 on August 25, 2026, will be executed over 18 months. The contract value, inclusive of taxes, covers the complete ERS along with the required accessories.Emergency Restoration Systems are used to restore transmission infrastructure following disruptions, helping maintain continuity a..

Next Story
Real Estate

Gradiant expands Coimbatore engineering centre

Gradiant has expanded its Global Engineering Center (GEC) in Coimbatore, more than doubling its engineering workforce from approximately 100 to over 200 professionals as it strengthens its global project execution capabilities.The expanded centre will bring together multidisciplinary expertise across process engineering, detailed design and project engineering, enabling the India team to take on greater responsibility for the engineering and design of Gradiant’s international projects.According to Govind Alagappan, COO, Gradiant, Coimbatore’s engineering talent and industrial heritage make..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement