Telangana CM Orders Faster Work on Musi River Rejuvenation
ECONOMY & POLICY

Telangana CM Orders Faster Work on Musi River Rejuvenation

Telangana Chief Minister Revanth Reddy has directed officials to accelerate projects being implemented by the State Municipal Administration and Urban Development (MA and UD) Department. During a review meeting in Hyderabad on November 25, he sought updates on the Musi River Rejuvenation project, radial roads and other urban infrastructure works.

Officials reported that Phase 1 of the Musi project covers a 9.20 km stretch from Himayat Sagar to Gandhi Sarovar, designated Zone 1A, and an 11.8 km stretch from Osman Sagar to Gandhi Sarovar, designated Zone 1B. Preparations are under way to begin work in January 2027, while the tendering process has started.

The Chief Minister was informed that development work at Mir Alam Tank, including the removal of accumulated silt, is scheduled for completion by January 2028. He also instructed authorities to accelerate radial road construction and land acquisition. A modern cow shelter under construction at Gandipet was reviewed, with completion targeted for March 2027.

Officials presented the techno-economic feasibility of Phase 1 of Hyderabad’s Personal Rapid Transit System (PRTS), including a possible alignment from Kukatpally through Raidurg to Biodiversity. Another proposed route would run from Begumpet Metro Station through the Secretariat and Basheerbagh to Ranigunj. Reddy asked officials to study depot locations near Necklace Road, Raidurg and People’s Plaza, and to prepare preliminary plans for multi-level parking facilities near them.

The meeting also covered a footbridge at IIIT junction, an associated multi-level car park, and the Integrated Fruit Market at Koheda. Reddy directed officials to build connecting roads alongside the market works without compromising quality. Hyderabad Airport Development Authority and Regulation (HYDRAA) proposals for lake restoration, sewage treatment plants (STPs), government asset protection and stepwell restoration were also reviewed. Senior officials from the state, HMDA, GHMC, HYDRAA and other civic agencies attended the meeting.

Telangana Chief Minister Revanth Reddy has directed officials to accelerate projects being implemented by the State Municipal Administration and Urban Development (MA and UD) Department. During a review meeting in Hyderabad on November 25, he sought updates on the Musi River Rejuvenation project, radial roads and other urban infrastructure works. Officials reported that Phase 1 of the Musi project covers a 9.20 km stretch from Himayat Sagar to Gandhi Sarovar, designated Zone 1A, and an 11.8 km stretch from Osman Sagar to Gandhi Sarovar, designated Zone 1B. Preparations are under way to begin work in January 2027, while the tendering process has started. The Chief Minister was informed that development work at Mir Alam Tank, including the removal of accumulated silt, is scheduled for completion by January 2028. He also instructed authorities to accelerate radial road construction and land acquisition. A modern cow shelter under construction at Gandipet was reviewed, with completion targeted for March 2027. Officials presented the techno-economic feasibility of Phase 1 of Hyderabad’s Personal Rapid Transit System (PRTS), including a possible alignment from Kukatpally through Raidurg to Biodiversity. Another proposed route would run from Begumpet Metro Station through the Secretariat and Basheerbagh to Ranigunj. Reddy asked officials to study depot locations near Necklace Road, Raidurg and People’s Plaza, and to prepare preliminary plans for multi-level parking facilities near them. The meeting also covered a footbridge at IIIT junction, an associated multi-level car park, and the Integrated Fruit Market at Koheda. Reddy directed officials to build connecting roads alongside the market works without compromising quality. Hyderabad Airport Development Authority and Regulation (HYDRAA) proposals for lake restoration, sewage treatment plants (STPs), government asset protection and stepwell restoration were also reviewed. Senior officials from the state, HMDA, GHMC, HYDRAA and other civic agencies attended the meeting.

Related Stories

Gold Stories

Next Story
Real Estate

IGBC Green Building Congress 2026 advances India’s net-zero agenda

The Indian Green Building Council (IGBC), part of the Confederation of Indian Industry (CII), opened the 24th edition of the Green Building Congress 2026 at the Jio World Convention Centre, Mumbai, with a focus on accelerating India's green and net-zero building movement. The three-day event, being held from 26 to 28 November, brought together policymakers, industry leaders and sustainability experts to discuss green buildings, climate-resilient infrastructure and sustainable communities.A key highlight of the inaugural session was the launch of five pilot rating systems: Green Retail, DigiBui..

Next Story
Real Estate

Maharashtra CM inaugurates fifth Model Sub-Registrar Office in Mumbai

Maharashtra Chief Minister Devendra Fadnavis has inaugurated a Model Sub-Registrar Office (SRO) in Lower Parel, Mumbai, taking the number of such centres launched in the state to five. The initiative aims to modernise property registration services through technology-enabled infrastructure and citizen-centric processes.Developed by the Government of Maharashtra in association with VFS Global and WE Excel Software, the Lower Parel centre follows the launch of Model SROs in Pune, Bandra Kurla Complex in Mumbai, Navi Mumbai and Nagpur.The centres provide facilities for registering property-relate..

Next Story
Infrastructure Transport

NHBF hails Indian Army aircraft operations on Amritsar–Jamnagar corridor

The National Highways Builders Federation (NHBF) has welcomed the successful landing and take-off of four Indian Army microlight aircraft on the Amritsar–Jamnagar Economic Corridor (NH-754K) in Gujarat. The exercise demonstrated the potential of highway infrastructure to support defence operations and emergency response. The expressway was developed by CDS Infra Projects, an NHBF member company.Developed under the Bharatmala Pariyojana, the six-lane greenfield corridor is described as India's second-longest expressway. The operation was conducted by the Indian Army's Team Mountain Eagles as ..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code