MMOPL to build Andheri Metro bridge
ROADS & HIGHWAYS

MMOPL to build Andheri Metro bridge

The Western Railway has allotted 142 days of power blocks to Mumbai Metro One (MMOPL) for the construction of a bridge through which the metro will traverse above the Andheri railway lines. The 180-m-long steel bridge, which will be built at the cost of Rs 35 crore, will cross the railway line from Andheri (West) to Andheri (East). The 142 traffic and power blocks for the construction of the steel bridge range from a minimum of one hour 55 minutes to a maximum of four hours.

The Western Railway has allotted 142 days of power blocks to Mumbai Metro One (MMOPL) for the construction of a bridge through which the metro will traverse above the Andheri railway lines. The 180-m-long steel bridge, which will be built at the cost of Rs 35 crore, will cross the railway line from Andheri (West) to Andheri (East). The 142 traffic and power blocks for the construction of the steel bridge range from a minimum of one hour 55 minutes to a maximum of four hours.

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram