- Home
- Infrastructure Transport
- ROADS & HIGHWAYS
- MMOPL to build Andheri Metro bridge
Share
MMOPL to build Andheri Metro bridge
01 Apr 2011
1 Min Read
CW Staff
The Western Railway has allotted 142 days of power blocks to Mumbai Metro One (MMOPL) for the construction of a bridge through which the metro will traverse above the Andheri railway lines. The 180-m-long steel bridge, which will be built at the cost of Rs 35 crore, will cross the railway line from Andheri (West) to Andheri (East). The 142 traffic and power blocks for the construction of the steel bridge range from a minimum of one hour 55 minutes to a maximum of four hours.
The Western Railway has allotted 142 days of power blocks to Mumbai Metro One (MMOPL) for the construction of a bridge through which the metro will traverse above the Andheri railway lines. The 180-m-long steel bridge, which will be built at the cost of Rs 35 crore, will cross the railway line from Andheri (West) to Andheri (East). The 142 traffic and power blocks for the construction of the steel bridge range from a minimum of one hour 55 minutes to a maximum of four hours.
Related Stories
Gold Stories
01 May 2024
01 May 2024
01 May 2024
Opinion Poll
Question : Which technological advancement do you believe will most transform the real estate industry in the coming years?
Live Results :
Virtual Reality and 3D Property Tours
Smart Home and Building Automation
Blockchain for Property Transactions
Big Data and Predictive Analytics for Market Insights
Augmented Reality for Property Staging and Design
Drone Technology for Aerial Photography and Site Analysis
Latest updates
07 May 2024