Bengaluru Re-Tenders Six Flyover Projects at Rs. 16.4 bn
ROADS & HIGHWAYS

Bengaluru Re-Tenders Six Flyover Projects at Rs. 16.4 bn

Bengaluru Smart Infrastructure (B-Smile), a special purpose vehicle, has re-invited civil bids for six elevated corridor and flyover projects at a combined revised cost of Rs. 16.4 bn, excluding goods and services tax. The revised outlay is Rs. 160 mn higher than the previous tender baseline issued in May 2026.

The re-tendering follows the Urban Development Department’s cancellation of nine elevated corridor packages valued at Rs. 30.6 bn earlier this month. An audit panel had identified procurement irregularities, including inappropriate qualification criteria for urban works and non-compliance with national highway standards.

The six packages include the Shoolay Circle–St John’s Hospital Road corridor, valued at Rs. 5.64 bn, and the Minerva Circle–Town Hall Loop–KR Circle corridor, estimated at Rs. 5.4 bn. The Pipeline Road grade separators in Mahalakshmi Layout are priced at Rs. 3.15 bn, while the Doddaballapura Road–Kogilu Circle corridor is valued at Rs. 1.03 bn.

The remaining projects are the Konanakunte Cross elevated corridor on Kanakapura Road, with an estimated cost of Rs. 768 mn, and the MEI Junction split flyover on Tumakuru Road, priced at Rs. 416 mn. All six projects carry a construction period of 30 months and a maintenance obligation lasting 10 years.

Several major corridors remain pending, including the Old Madras Road–Silk Board Junction elevated corridor, which was previously valued at Rs. 8.52 bn and has not been re-tendered. Civic advocacy groups, including Dear DK, continue to oppose the high-capital elevated corridor network and are urging the state authorities to prioritise mass transit alternatives such as airport metro connectivity.

Bengaluru Smart Infrastructure (B-Smile), a special purpose vehicle, has re-invited civil bids for six elevated corridor and flyover projects at a combined revised cost of Rs. 16.4 bn, excluding goods and services tax. The revised outlay is Rs. 160 mn higher than the previous tender baseline issued in May 2026. The re-tendering follows the Urban Development Department’s cancellation of nine elevated corridor packages valued at Rs. 30.6 bn earlier this month. An audit panel had identified procurement irregularities, including inappropriate qualification criteria for urban works and non-compliance with national highway standards. The six packages include the Shoolay Circle–St John’s Hospital Road corridor, valued at Rs. 5.64 bn, and the Minerva Circle–Town Hall Loop–KR Circle corridor, estimated at Rs. 5.4 bn. The Pipeline Road grade separators in Mahalakshmi Layout are priced at Rs. 3.15 bn, while the Doddaballapura Road–Kogilu Circle corridor is valued at Rs. 1.03 bn. The remaining projects are the Konanakunte Cross elevated corridor on Kanakapura Road, with an estimated cost of Rs. 768 mn, and the MEI Junction split flyover on Tumakuru Road, priced at Rs. 416 mn. All six projects carry a construction period of 30 months and a maintenance obligation lasting 10 years. Several major corridors remain pending, including the Old Madras Road–Silk Board Junction elevated corridor, which was previously valued at Rs. 8.52 bn and has not been re-tendered. Civic advocacy groups, including Dear DK, continue to oppose the high-capital elevated corridor network and are urging the state authorities to prioritise mass transit alternatives such as airport metro connectivity.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Welspun One unveils Diwali campaign for World Trade Center Thane

Welspun One has unveiled A Dream Diwali, a festive brand film promoting World Trade Center Thane, its proposed mixed-use development in the Mumbai Metropolitan Region (MMR). The campaign uses individual interpretations of an ideal Diwali to introduce the experiences and offerings planned at the development.The film follows different characters as they share their festive wishes and go about activities such as shopping, meeting friends, playing games and spending time with family. Through these everyday moments, the campaign presents the idea that celebrations are personal and that different ge..

Next Story
Equipment

BorgWarner secures three turbocharger contracts with global powertrain leader

BorgWarner has secured three new turbocharger contracts with a global powertrain technology company. The wins comprise one contract for its variable turbine geometry (VTG) turbocharger and two for its wastegate turbocharger. The technologies will be deployed in the customer's light-vehicle gasoline platforms in South America and Europe, with production scheduled to begin in 2027.The VTG turbochargers are designed for gasoline engines operating under demanding conditions and high-boost pressure requirements. They are engineered to support Miller-cycle engines and withstand exhaust temperatures ..

Next Story
Infrastructure Transport

International Digi Yatra Trials Begin at Seven Airports

India has begun trials of Digi Yatra for international passengers at seven airports, allowing eligible Indian passport holders to use facial recognition at selected airport checkpoints. The facility is currently limited to Indian nationals with e-passports travelling on selected international flights operated by Air India and IndiGo. The Civil Aviation Ministry announced the trials on 1 November, with testing scheduled through December 2026. A wider rollout is expected in 2027 after the ministry assesses passenger feedback gathered during the trial period, according to PTI. The system is inten..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code