+
FASTag Annual Pass Improves Toll Plaza Efficiency, NHAI Survey Finds
ROADS & HIGHWAYS

FASTag Annual Pass Improves Toll Plaza Efficiency, NHAI Survey Finds

The National Highways Authority of India (NHAI) has found that the FASTag Annual Pass has improved toll plaza operations, increased vehicle throughput and reduced payment-related complaints. A survey commissioned by NHAI covered 580 toll plazas and assessed the pass across eight operational parameters, recording an average positive response of 91 per cent from operators and other stakeholders.

The findings indicated improvements in operational efficiency and traffic movement, along with lower workloads for toll operators. The pass also reduced the need for on-lane FASTag recharges, while helping address exemption-related disputes and other payment concerns at toll plazas.

According to the survey, throughput improved by 94 per cent after the Annual Pass was introduced, while payment-related complaints declined by 89 per cent. Exemption-related disputes and incidents of violence fell by more than 84 per cent and 89 per cent, respectively, while UPI and cash transactions declined by 96 per cent.

The survey also pointed to wider adoption of digital toll payments and smoother vehicle movement through fee plazas. NHAI said the results demonstrated the pass’s contribution to seamless toll collection, improved operational efficiency and a more convenient travel experience for frequent National Highway users.

The FASTag Annual Pass has crossed 10 mn passes issued since its launch on 15 August last year. It is valid at about 1,150 fee plazas on National Highways and expressways and removes the need for repeated recharges through a one-time payment of Rs. 3,075. The pass remains valid for one year or 200 toll plaza crossings and is available to non-commercial vehicles with a valid FASTag. It is activated on the existing tag after payment through the Rajmargyatra app.

The National Highways Authority of India (NHAI) has found that the FASTag Annual Pass has improved toll plaza operations, increased vehicle throughput and reduced payment-related complaints. A survey commissioned by NHAI covered 580 toll plazas and assessed the pass across eight operational parameters, recording an average positive response of 91 per cent from operators and other stakeholders. The findings indicated improvements in operational efficiency and traffic movement, along with lower workloads for toll operators. The pass also reduced the need for on-lane FASTag recharges, while helping address exemption-related disputes and other payment concerns at toll plazas. According to the survey, throughput improved by 94 per cent after the Annual Pass was introduced, while payment-related complaints declined by 89 per cent. Exemption-related disputes and incidents of violence fell by more than 84 per cent and 89 per cent, respectively, while UPI and cash transactions declined by 96 per cent. The survey also pointed to wider adoption of digital toll payments and smoother vehicle movement through fee plazas. NHAI said the results demonstrated the pass’s contribution to seamless toll collection, improved operational efficiency and a more convenient travel experience for frequent National Highway users. The FASTag Annual Pass has crossed 10 mn passes issued since its launch on 15 August last year. It is valid at about 1,150 fee plazas on National Highways and expressways and removes the need for repeated recharges through a one-time payment of Rs. 3,075. The pass remains valid for one year or 200 toll plaza crossings and is available to non-commercial vehicles with a valid FASTag. It is activated on the existing tag after payment through the Rajmargyatra app.

Related Stories

Gold Stories

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Equipment

Seven Propel 470 HEV electric tippers go to work on coal haulage in Chhattisgarh

Propel EV, the electric mobility division of Propel Industries and India's No. 1 electric tipper brand, has deployed seven 470 HEV electric trucks with a leading coal-haulage contractor at one of India's largest opencast coal mines in Chhattisgarh. The trucks are in daily operation, moving coal on continuous haul cycles in one of the most demanding applications in Indian mining.Why Electric - and Why CoalCoal haulage runs round the clock: heavy loads, long haul cycles, steep ramps and abrasive dust. It is also where diesel hurts most. Engines run continuously, fuel is the largest single operat..

Next Story
Infrastructure Transport

UP Cabinet Approves Renaming Jewar Airport After PM Modi

The Uttar Pradesh Cabinet has approved a proposal to rename Noida International Airport at Jewar as Narendra Modi International Airport, Noida-Jewar. Chief Minister Yogi Adityanath announced the decision after a Cabinet meeting, saying the airport represented a major contribution to the state and would become Uttar Pradesh’s largest airport and a significant aviation hub. The greenfield airport’s foundation stone was laid by Prime Minister Narendra Modi on November 25, 2021. He inaugurated Phase 1 on March 28, 2026, and commercial flights began on June 15. The facility is being developed a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code