GMDA Floats Rs. 7.76 bn SPR Elevated Road Tender
ROADS & HIGHWAYS

GMDA Floats Rs. 7.76 bn SPR Elevated Road Tender

The Gurugram Metropolitan Development Authority (GMDA) has floated a tender for the first phase of an elevated Southern Peripheral Road (SPR) corridor between Vatika Chowk and the Dwarka Expressway cloverleaf on the Delhi-Gurgaon Expressway. The 4.23-km project will be built at an estimated cost of Rs. 7.76 bn under the engineering, procurement and construction (EPC) mode.

The elevated road is scheduled for completion within 30 months of work allotment. The last date for submitting bids is November 18. GMDA officials said the corridor would improve traffic movement and ease bottlenecks at intersections connecting sectors 69, 70, 71/72, 70/75, 71/74, 75/75A, 74/74A and nearby areas.

Traffic studies and population projections conducted by the authority indicate that these junctions will require grade separation within the next 10 years, as peak hourly traffic is projected to exceed 10,000 car units. The proposed structure will have four elevated lanes in each direction between Vatika Chowk and NH-48, along with 3+3-lane primary service roads and 2+2-lane secondary service roads.

The design includes second-level access roads towards the Sector 75 and 75A roads, another access route towards Tulip Chowk, multiple ramps, loops and surface-level U-turns. GMDA said the arrangements would support smoother movement between the Delhi-Gurgaon Expressway and Sohna Road while reducing pressure on the existing road network.

The project was reviewed at a meeting chaired by Haryana chief minister Nayab Singh Saini at the PWD Guest House in Gurugram. GMDA chief executive officer PC Meena said the second phase would include a grade-separated dynamic interchange at Vatika Chowk, while the third phase would cover an 8.5-km elevated corridor from Vatika Chowk to Ghata. Detailed project reports for both phases are being prepared.

The authority had floated a previous tender worth Rs. 7.55 bn in March, but cancelled it in June after the state government sought changes to the request for proposal document. During the review, Saini also directed officials to accelerate the Sheetla Mata Medical College and Hospital, strengthen Gurugram’s drainage network, add rainwater harvesting structures and create ponds and drainage provisions in green belts.

The Gurugram Metropolitan Development Authority (GMDA) has floated a tender for the first phase of an elevated Southern Peripheral Road (SPR) corridor between Vatika Chowk and the Dwarka Expressway cloverleaf on the Delhi-Gurgaon Expressway. The 4.23-km project will be built at an estimated cost of Rs. 7.76 bn under the engineering, procurement and construction (EPC) mode. The elevated road is scheduled for completion within 30 months of work allotment. The last date for submitting bids is November 18. GMDA officials said the corridor would improve traffic movement and ease bottlenecks at intersections connecting sectors 69, 70, 71/72, 70/75, 71/74, 75/75A, 74/74A and nearby areas. Traffic studies and population projections conducted by the authority indicate that these junctions will require grade separation within the next 10 years, as peak hourly traffic is projected to exceed 10,000 car units. The proposed structure will have four elevated lanes in each direction between Vatika Chowk and NH-48, along with 3+3-lane primary service roads and 2+2-lane secondary service roads. The design includes second-level access roads towards the Sector 75 and 75A roads, another access route towards Tulip Chowk, multiple ramps, loops and surface-level U-turns. GMDA said the arrangements would support smoother movement between the Delhi-Gurgaon Expressway and Sohna Road while reducing pressure on the existing road network. The project was reviewed at a meeting chaired by Haryana chief minister Nayab Singh Saini at the PWD Guest House in Gurugram. GMDA chief executive officer PC Meena said the second phase would include a grade-separated dynamic interchange at Vatika Chowk, while the third phase would cover an 8.5-km elevated corridor from Vatika Chowk to Ghata. Detailed project reports for both phases are being prepared. The authority had floated a previous tender worth Rs. 7.55 bn in March, but cancelled it in June after the state government sought changes to the request for proposal document. During the review, Saini also directed officials to accelerate the Sheetla Mata Medical College and Hospital, strengthen Gurugram’s drainage network, add rainwater harvesting structures and create ponds and drainage provisions in green belts.

Related Stories

Gold Stories

Next Story
Technology

Where Infrastructure Meets Intelligence: Inside Bentley's Year inc

Oct 28, 2026  @Tanveer PadodeA first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.- By Tanveer Padode, CEO, IMPACCT: A first-hand account of Bentley’s 2026 awards, where AI, digital twins and engineering innovation are reshaping infrastructure delivery.Two days in SingaporeConstruction is won or lost in two places: how a project is designed and how it is delivered. Technology has promised to improve both for years, and the question I carried into Bentley's Year in Infrastructure, held at the Fairmont Si..

Next Story
Infrastructure Transport

Vaishnaw Inaugurates Two Rail Sections in Madhya Pradesh

Railway Minister Ashwini Vaishnaw on October 24 inaugurated the Satna-Devendranagar and Rewa-Churhat rail sections under the Lalitpur-Singrauli Railway Project in Madhya Pradesh. He also flagged off the new Devendranagar-Churhat passenger train service through video conferencing. Chief Minister Dr Mohan Yadav attended the event. The new Rewa-Churhat railway line, which extends approximately 65 km, was built at a cost of over Rs. 10 bn. The 53 km Satna-Devendranagar line was constructed at a cost of over Rs. 8 bn. The passenger service is expected to provide improved rail access to residents in..

Next Story
Infrastructure Transport

Railways Minister to Inaugurate New Rail Sections Covering 118 km

Railways Minister Ashwini Vaishnaw will inaugurate the Satna-Devendra Nagar and Rewa-Churhat rail sections in Madhya Pradesh on October 24. The two sections have a combined length of 118 km and are intended to improve passenger and freight connectivity across the region. Vaishnaw will also flag off a new train service between Devendra Nagar and Churhat. Madhya Pradesh Chief Minister Mohan Yadav will attend the inauguration programme, according to information released by the Ministry of Railways. The 53-km Satna-Devendra Nagar section is expected to improve rail access to Satna, Nagod, Devendra..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code