Bakhtawar Chowk Double-Decker Design Needs More Changes
ECONOMY & POLICY

Bakhtawar Chowk Double-Decker Design Needs More Changes

The design of the proposed double-decker flyover and underpass at Bakhtawar Chowk in Gurugram is likely to take longer to finalise after the Gurugram Metropolitan Development Authority (GMDA) sought further amendments to the revised plan submitted by Gurugram Metro Rail (GMRL).

The authority wants to use the available space at the junction more efficiently so that the proposed six-lane underpass can be accommodated while maintaining smooth traffic movement between Sector 47 and Medanta Medicity. The underpass is planned to address the increase in traffic associated with commercial developments in Sector 47 and nearby areas.

GMRL submitted a revised design to GMDA on October 1 after being directed to make provisions for the six-lane underpass. The agency said it had incorporated the required changes and submitted revised drawings for approval. The plan relates to Medicity-Satpaul Mittal Marg, which has a right of way of 50 metres.

GMRL has proposed a central pier for the double-decker structure. The first level will comprise an elevated road with three lanes on each side, while the second level will carry a metro viaduct and include a station at Bakhtawar Chowk.

The proposal also includes space for a future underpass to be constructed by GMDA, connecting Sector 47 with the Medanta hospital road. Two service lanes on each side will operate at ground level. GMRL has indicated that the junction has enough width for six lanes, but the connecting roads on either side are narrower and present practical design challenges.

GMDA has therefore asked that the locations of the piers and other structural elements be reconsidered to ensure adequate space for the underpass. Officials from both agencies are working on further changes before the design is submitted again for approval.

The design of the proposed double-decker flyover and underpass at Bakhtawar Chowk in Gurugram is likely to take longer to finalise after the Gurugram Metropolitan Development Authority (GMDA) sought further amendments to the revised plan submitted by Gurugram Metro Rail (GMRL). The authority wants to use the available space at the junction more efficiently so that the proposed six-lane underpass can be accommodated while maintaining smooth traffic movement between Sector 47 and Medanta Medicity. The underpass is planned to address the increase in traffic associated with commercial developments in Sector 47 and nearby areas. GMRL submitted a revised design to GMDA on October 1 after being directed to make provisions for the six-lane underpass. The agency said it had incorporated the required changes and submitted revised drawings for approval. The plan relates to Medicity-Satpaul Mittal Marg, which has a right of way of 50 metres. GMRL has proposed a central pier for the double-decker structure. The first level will comprise an elevated road with three lanes on each side, while the second level will carry a metro viaduct and include a station at Bakhtawar Chowk. The proposal also includes space for a future underpass to be constructed by GMDA, connecting Sector 47 with the Medanta hospital road. Two service lanes on each side will operate at ground level. GMRL has indicated that the junction has enough width for six lanes, but the connecting roads on either side are narrower and present practical design challenges. GMDA has therefore asked that the locations of the piers and other structural elements be reconsidered to ensure adequate space for the underpass. Officials from both agencies are working on further changes before the design is submitted again for approval.

Related Stories

Gold Stories

Next Story
Resources

Bluspring Q2 EBITDA rises 130 per cent to Rs 670 million

Bluspring Enterprises reported a 49 per cent year-on-year increase in revenue to Rs 12.5 billion in Q2 FY27, while EBITDA rose 130 per cent to Rs 670 million. Profit after tax (PAT) increased 95 per cent to Rs 320 million. The financial results exclude the company's investment in foundit.EBITDA margin expanded by 188 basis points to 5.4 per cent, compared with 3.5 per cent in Q2 FY26. Profit before tax rose 159 per cent to Rs 390 million, while diluted earnings per share increased 88 per cent to Rs 2.10.For the half year ended 30 September 2026, revenue grew 35 per cent to Rs 21.8 billion. EBI..

Next Story
Building Material

Shankar Fenestrations works on façade design for CRC The Flagship

Shankar Fenestrations and Glasses is involved in the façade development of CRC The Flagship, a commercial real estate project in Noida. The project highlights the role of glass and fenestration systems in contemporary commercial architecture, where aesthetics, functionality and material selection influence building design.Façade systems play an important role in defining a building's visual identity while addressing practical requirements related to building performance. The development also reflects the growing adoption of contemporary architectural approaches in Noida's commercial real est..

Next Story
Real Estate

Urban Planners & City Architects Seek Mumbai DCPR 2034 Reexamination

Dr Niranjan Hiranandani, Ghulam Zia and industry experts call for stronger resident safeguards, affordable housing and better urban planning. Urban Planners & Architects sought an urgent relook at DCPR 2034 at 3rd Mumbai Redevelopment SummitMumbai's redevelopment must move beyond rebuilding individual buildings to creating sustainable, well-planned neighbourhoods supported by adequate infrastructure, industry leaders emphasised at the 3rd Mumbai Redevelopment Summit 2026, held on November 4 at Radisson Blu Mumbai International Airport.The summit was presented by FIRST Construction Council ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code