MMRDA Reaches 650 Metre Milestone on Orange Gate–Marine Drive Tunnel
ROADS & HIGHWAYS

MMRDA Reaches 650 Metre Milestone on Orange Gate–Marine Drive Tunnel

The Mumbai Metropolitan Region Development Authority (MMRDA) has reported completion of more than 650 metres of excavation on the Orange Gate–Marine Drive underground road tunnel, marking a significant construction milestone. The progress advances work on one of the city’s most technically demanding transport projects and underlines efforts to reinforce east–west connectivity across South Mumbai. The milestone follows sustained tunnelling activity using a specialised tunnel boring machine adapted for coastal geology and high groundwater conditions.

The Orange Gate–Marine Drive tunnel is a 9.96 km underground road corridor being developed at an approved cost of Rs 80.56 billion (bn), with nearly seven km of the alignment comprising twin tunnels linking Orange Gate near the Eastern Freeway with Marine Drive. Designed as a high-speed underground route, the corridor will integrate with the Mumbai Coastal Road and the Mumbai Trans Harbour Link to improve freight movement and commuter mobility. Each tunnel is planned to accommodate two traffic lanes plus an emergency lane and to support vehicle speeds up to 80 kmph.

Excavation is being carried out using a 12.19-metre slurry shield tunnel boring machine chosen for the alignment’s subsurface conditions, which include densely populated neighbourhoods and high groundwater. The alignment passes beneath critical transport corridors, including the Central Railway, Western Railway and Metro Line 3, at depths ranging from around 12 metres to nearly 52 metres, adding to engineering complexity. MMRDA reports the project has achieved around 14 per cent physical progress to date.

The corridor will incorporate cross passages, mechanical ventilation, fire-resistant infrastructure, intelligent traffic management systems and modern lighting to enhance operational safety and resilience. The authority anticipates that diverting through traffic into the tunnel will substantially ease congestion on surface roads, with travel time between Orange Gate and Marine Drive expected to reduce to about five minutes and overall journeys across South Mumbai cut by up to 20 minutes. The project forms part of MMRDA’s broader strategy to expand underground transport infrastructure and to support the city’s long-term mobility requirements.

The Mumbai Metropolitan Region Development Authority (MMRDA) has reported completion of more than 650 metres of excavation on the Orange Gate–Marine Drive underground road tunnel, marking a significant construction milestone. The progress advances work on one of the city’s most technically demanding transport projects and underlines efforts to reinforce east–west connectivity across South Mumbai. The milestone follows sustained tunnelling activity using a specialised tunnel boring machine adapted for coastal geology and high groundwater conditions. The Orange Gate–Marine Drive tunnel is a 9.96 km underground road corridor being developed at an approved cost of Rs 80.56 billion (bn), with nearly seven km of the alignment comprising twin tunnels linking Orange Gate near the Eastern Freeway with Marine Drive. Designed as a high-speed underground route, the corridor will integrate with the Mumbai Coastal Road and the Mumbai Trans Harbour Link to improve freight movement and commuter mobility. Each tunnel is planned to accommodate two traffic lanes plus an emergency lane and to support vehicle speeds up to 80 kmph. Excavation is being carried out using a 12.19-metre slurry shield tunnel boring machine chosen for the alignment’s subsurface conditions, which include densely populated neighbourhoods and high groundwater. The alignment passes beneath critical transport corridors, including the Central Railway, Western Railway and Metro Line 3, at depths ranging from around 12 metres to nearly 52 metres, adding to engineering complexity. MMRDA reports the project has achieved around 14 per cent physical progress to date. The corridor will incorporate cross passages, mechanical ventilation, fire-resistant infrastructure, intelligent traffic management systems and modern lighting to enhance operational safety and resilience. The authority anticipates that diverting through traffic into the tunnel will substantially ease congestion on surface roads, with travel time between Orange Gate and Marine Drive expected to reduce to about five minutes and overall journeys across South Mumbai cut by up to 20 minutes. The project forms part of MMRDA’s broader strategy to expand underground transport infrastructure and to support the city’s long-term mobility requirements.

Related Stories

Gold Stories

Next Story
Real Estate

LML Realty Sells Out Jhirka Valley Industrial Park in Haryana

LML Realty, the real estate arm of LML Group, recently announced the complete sell-out of its Jhirka Valley Industrial Park in Haryana, with over 1.17 million sq ft of industrial space acquired by more than 50 companies. With utilities and internal infrastructure in place, the company has commenced plot handovers, enabling buyers to begin construction and establish their operations.The industrial park has attracted companies across diverse sectors, including chemicals, metals and alloys, textiles, electrical equipment, energy, logistics, construction, polymers and engineering. Key buyers inclu..

Next Story
Real Estate

WSB Real Estate Partners Exits Six Housing Investments

WSB Real Estate Partners recently announced the successful exit of six residential investments across Bengaluru, Mumbai Metropolitan Region (MMR) and National Capital Region (NCR), delivering an average internal rate of return (IRR) of 19–21 per cent and an overall investment return of 1.4 times.The real estate-focused investment firm invested approximately Rs 7 billion across six mid-affordable housing projects over the past four years. All six investments were fully repaid between April and November 2026, several months ahead of their original investment tenures.WSB collaborated with sever..

Next Story
Infrastructure Transport

Aluminium Industry Seeks Policy Support for Rs 4 Trillion Investment

The Aluminium Association of India (AAI) has recently urged the government to introduce supportive policy measures to safeguard the sector’s proposed Rs 4 trillion investment pipeline. The association highlighted the need for a predictable policy framework to strengthen domestic manufacturing, expand production capacity and reduce import dependence.AAI submitted its recommendations for the Union Budget 2027-28 to the Ministries of Finance, Commerce and Industry, and Mines, along with the Department for Promotion of Industry and Internal Trade (DPIIT).India’s aluminium demand is projected t..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code