MSRTC Tests AC Buses via MTHL
ROADS & HIGHWAYS

MSRTC Tests AC Buses via MTHL

The Maharashtra State Road Transport Corporation (MSRTC) is set to conduct an experimental run of four air-conditioned Shivneri buses through the Mumbai Trans Harbour Link (MTHL). This initiative aims to evaluate the feasibility and efficiency of operating these buses via the MTHL, a significant infrastructure project that connects Mumbai and Navi Mumbai.

The experimental run is designed to assess the performance and suitability of AC Shivneri buses on the MTHL route, offering a glimpse into the potential benefits and challenges associated with this mode of transportation. The decision to conduct the trial underscores MSRTC's commitment to exploring innovative solutions for enhancing connectivity and providing comfortable travel options to commuters.

As the buses traverse the MTHL, the trial run will offer valuable insights into the operational dynamics, passenger experience, and overall viability of incorporating AC Shivneri buses into the transportation network via this crucial link. The results of this experiment will play a crucial role in shaping future decisions related to the integration of such services in the region.

MSRTC's move to test AC Shivneri buses on the MTHL aligns with the broader goal of optimising public transportation infrastructure and offering enhanced services to commuters. The experimental run serves as a strategic step in evaluating the potential expansion of air-conditioned bus services on key routes, contributing to the overall improvement of the transportation ecosystem in the Mumbai metropolitan region.

The Maharashtra State Road Transport Corporation (MSRTC) is set to conduct an experimental run of four air-conditioned Shivneri buses through the Mumbai Trans Harbour Link (MTHL). This initiative aims to evaluate the feasibility and efficiency of operating these buses via the MTHL, a significant infrastructure project that connects Mumbai and Navi Mumbai. The experimental run is designed to assess the performance and suitability of AC Shivneri buses on the MTHL route, offering a glimpse into the potential benefits and challenges associated with this mode of transportation. The decision to conduct the trial underscores MSRTC's commitment to exploring innovative solutions for enhancing connectivity and providing comfortable travel options to commuters. As the buses traverse the MTHL, the trial run will offer valuable insights into the operational dynamics, passenger experience, and overall viability of incorporating AC Shivneri buses into the transportation network via this crucial link. The results of this experiment will play a crucial role in shaping future decisions related to the integration of such services in the region. MSRTC's move to test AC Shivneri buses on the MTHL aligns with the broader goal of optimising public transportation infrastructure and offering enhanced services to commuters. The experimental run serves as a strategic step in evaluating the potential expansion of air-conditioned bus services on key routes, contributing to the overall improvement of the transportation ecosystem in the Mumbai metropolitan region.

Next Story
Infrastructure Urban

Welspun Enterprises Wins 910 MLD Panjrapur WTP Contract

Welspun Enterprises (WEL), the infrastructure and energy arm of Welspun World, has secured a major contract from the Brihanmumbai Municipal Corporation (BMC) to design, build and operate a 910 million litres per day (MLD) Water Treatment Plant (WTP) at Panjrapur, Maharashtra.Valued at approximately Rs 31.45 billion, the project encompasses end-to-end civil, mechanical, electrical and instrumentation works, including the construction of a treated water sump and pumping station. Of the total value, nearly Rs 11.56 billion is allocated to Operations & Maintenance (O&M), with an additional..

Next Story
Infrastructure Energy

Mitsubishi Power Wins Boiler Upgrade Contract for O Mon 1 Plant

Mitsubishi Power, a power solutions brand of Mitsubishi Heavy Industries, (MHI), has been awarded a contract to support the oil-to-natural-gas fuel conversion at the O Mon 1 Thermal Power Plant in Can Tho, southern Vietnam. As the OEM of the plant’s existing boiler, Mitsubishi Power will supply key equipment—including new gas burners—and implement a selective catalytic reduction (SCR) system to reduce NOx emissions and help the plant meet stricter environmental standards.The O Mon 1 facility includes two 330 MW units that commenced operations in 2009 and 2015, with all major equipment or..

Next Story
Equipment

Liebherr’s 10,000th XPower Wheel Loader Joins BERGER’s Fleet

BERGER Rohstoffe GmbH has welcomed the 10,000th Liebherr XPower wheel loader to its operations at the Schlag granite quarry in Passau. The milestone machine, officially handed over at Liebherr’s Bischofshofen plant in May 2025, underscores the long-standing partnership between BERGER, Liebherr, and the Beutlhauser Group. Equipped with Liebherr’s signature power-split travel drive, the new L 580 XPower is already delivering strong results under demanding quarry conditions.At the Schlag quarry, BERGER Rohstoffe processes approximately 200,000 tonnes of Bayerwald granite annually into high-qu..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Get CW App