Noida to Repair and Resurface All Damaged Roads by Oct 20
ROADS & HIGHWAYS

Noida to Repair and Resurface All Damaged Roads by Oct 20

The Noida Authority has directed officials to repair and resurface all damaged roads across the city by October 20, following the development of potholes and rough patches after recent monsoon rainfall. Chief executive officer Krishna Karunesh said action would be taken against officials responsible for delays.

The directive covers all 10 work circles of the Authority. Roads in several locations, including Film City, Botanical Garden and sectors 15, 16, 37, 51 and 52, have developed potholes and uneven surfaces, with officials attributing the condition partly to resurfacing work not being completed on time.

Inspections also led to disciplinary action over alleged illegal construction and lapses in civic oversight. Five contractual staff members were dismissed after reports by additional chief executive officers Vandana Tripathi and Pushp Raj Singh, and officer on special duty (OSD) Kranti Shekhar identified violations in Barola village and sectors 138 and 140.

In the Barola case, a senior manager informed the Authority that a first information report had been registered and a notice issued to the accused. Two contractual employees, including a junior engineer and a supervisor, were removed for dereliction of duty while dealing with the encroachment. A junior engineer and a supervisor were also dismissed for failing to prevent illegal construction in sectors 138 and 140. One horticulture department official was removed as well.

Further action followed inspections of waste management. A horticulture supervisor was dismissed after waste was found in a park in Sector 19’s B Block, while the contractor was fined Rs. 0.5 mn. Another contractor received the same fine after garbage was found along a road’s central verge in Nithari village. A door-to-door collection agency was fined Rs. 2.5 mn for delayed collection. Officials were also instructed to clean and reopen public conveniences by October 15. A new agency has been appointed to operate and maintain 256 facilities after an earlier contract expired.

The Noida Authority has directed officials to repair and resurface all damaged roads across the city by October 20, following the development of potholes and rough patches after recent monsoon rainfall. Chief executive officer Krishna Karunesh said action would be taken against officials responsible for delays. The directive covers all 10 work circles of the Authority. Roads in several locations, including Film City, Botanical Garden and sectors 15, 16, 37, 51 and 52, have developed potholes and uneven surfaces, with officials attributing the condition partly to resurfacing work not being completed on time. Inspections also led to disciplinary action over alleged illegal construction and lapses in civic oversight. Five contractual staff members were dismissed after reports by additional chief executive officers Vandana Tripathi and Pushp Raj Singh, and officer on special duty (OSD) Kranti Shekhar identified violations in Barola village and sectors 138 and 140. In the Barola case, a senior manager informed the Authority that a first information report had been registered and a notice issued to the accused. Two contractual employees, including a junior engineer and a supervisor, were removed for dereliction of duty while dealing with the encroachment. A junior engineer and a supervisor were also dismissed for failing to prevent illegal construction in sectors 138 and 140. One horticulture department official was removed as well. Further action followed inspections of waste management. A horticulture supervisor was dismissed after waste was found in a park in Sector 19’s B Block, while the contractor was fined Rs. 0.5 mn. Another contractor received the same fine after garbage was found along a road’s central verge in Nithari village. A door-to-door collection agency was fined Rs. 2.5 mn for delayed collection. Officials were also instructed to clean and reopen public conveniences by October 15. A new agency has been appointed to operate and maintain 256 facilities after an earlier contract expired.

Related Stories

Gold Stories

Next Story
Real Estate

Home Loan: 7 Things First-Time Home Buyers Should Know Before Applying

Buying your first home is an important milestone. Whether you are considering an apartment in a metropolitan city or a house in a growing residential neighbourhood, the prospect of owning a property brings excitement and significant financial responsibility. However, first-time buyers can easily focus on the property price while overlooking the financial commitments that follow. A home loan makes it possible to purchase a property without paying the entire amount upfront. But the amount you borrow, ..

Next Story
Products

Antica Ceramica launches terracotta breeze block collection

Antica Ceramica has introduced its Terracotta Breeze Block Collection, combining terracotta craftsmanship with functional applications in contemporary architecture. The collection is designed for architects, interior designers and homeowners seeking decorative architectural elements that provide natural ventilation, filtered light and privacy.Traditionally used for ventilated partitions and enclosures, terracotta breeze blocks are increasingly being incorporated into residential and commercial spaces as design features. Antica Ceramica's collection can be used across facades, balcony enclosure..

Next Story
Infrastructure Urban

Shivtek Enters Electronic-Grade Speciality Chemicals Market

Shivtek Spechemi Industries, a flagship company of the Shiva Group of Industries, recently announced its entry into India’s semiconductor manufacturing value chain through the production of electronic-grade speciality chemicals.The company plans to establish a manufacturing facility in Pungam, Gujarat, with a proposed annual production capacity of 50,000 tonnes of electronic-grade hydrochloric acid (HCl), 6,000 tonnes of isopropyl alcohol (IPA) under Phase I, and 5,000 tonnes of hydrogen peroxide (H2O2).Commercial production of electronic-grade hydrochloric acid is expected to commence in FY..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code