Railways propose elevated corridor plan for Mumbai
RAILWAYS & METRO RAIL

Railways propose elevated corridor plan for Mumbai

The railways proposed a plan to build two elevated  rail corridors along the Churchgate-Virar and CST-Panvel routes. The plan involves an elevated corridor between Oval Maidan and Virar covering a distance of 63 km and another corridor between CST and Panvel, which will be a 49 km long. The first corridor will have a 16 km underground route and the rest of the route will be elevated. The  31 km of the CST-Panvel corridor will be elevated and the rest will be along the current tracks of the harbour line.

The railways proposed a plan to build two elevated  rail corridors along the Churchgate-Virar and CST-Panvel routes. The plan involves an elevated corridor between Oval Maidan and Virar covering a distance of 63 km and another corridor between CST and Panvel, which will be a 49 km long. The first corridor will have a 16 km underground route and the rest of the route will be elevated. The  31 km of the CST-Panvel corridor will be elevated and the rest will be along the current tracks of the harbour line.

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram