Cemindia Projects Wins Rs 6.66 bn Bengaluru Rail Contract
RAILWAYS & METRO RAIL

Cemindia Projects Wins Rs 6.66 bn Bengaluru Rail Contract

Adani Group-backed Cemindia Projects has secured a Rs. 6.66 bn civil works contract for the Bengaluru Suburban Transport Project. The award covers Package 1 of the Mallige Line, or Corridor 2, and was issued by the Karnataka Rail Infrastructure Development Company (K-RIDE) through a Letter of Acceptance on October 29, 2026. The contract excludes GST and has a completion period of 24 months.

The project involves constructing a 7.795-km elevated viaduct, ramps, a double-decker rail-cum-road flyover and a station at Mathikere. The scope also includes road flyover ramps, a Y-loop ramp, foot overbridges, multimodal integration facilities and related infrastructure between Benniganahalli and Shettihalli.

A 1.2-km double-decker structure will be built along Mohan Kumar Road between Mathikere and Yeshwanthpur. The upper level will carry the elevated suburban railway, while the lower level will function as a road flyover. The design is intended to address right-of-way constraints in the densely developed area, with additional works planned at Hebbal, Shettihalli and Yeshwanthpur.

K-RIDE is a special purpose vehicle of the Union and Karnataka governments implementing the 148-km Bengaluru Suburban Rail Project. The Mallige Line runs from Benniganahalli to Chikkabanavara, and all its civil works packages have now been awarded. Cemindia Projects was formerly known as ITD Cementation India.

K-RIDE has also awarded Package 1 of Corridor 4, or the Kanaka Line, to the RNS-GPL joint venture for Rs. 3.42 bn. The package includes 6.2 km of at-grade formation and 3.6 km of elevated viaduct between Benniganahalli and Jakkur. Package 2, covering a 13-km at-grade section between Heelalige and Bellandur, was awarded to RNS Infrastructure for Rs. 1.69 bn. Two of the four civil works packages under Corridor 4 have therefore been awarded, with tenders for the remaining packages to follow.

Adani Group-backed Cemindia Projects has secured a Rs. 6.66 bn civil works contract for the Bengaluru Suburban Transport Project. The award covers Package 1 of the Mallige Line, or Corridor 2, and was issued by the Karnataka Rail Infrastructure Development Company (K-RIDE) through a Letter of Acceptance on October 29, 2026. The contract excludes GST and has a completion period of 24 months. The project involves constructing a 7.795-km elevated viaduct, ramps, a double-decker rail-cum-road flyover and a station at Mathikere. The scope also includes road flyover ramps, a Y-loop ramp, foot overbridges, multimodal integration facilities and related infrastructure between Benniganahalli and Shettihalli. A 1.2-km double-decker structure will be built along Mohan Kumar Road between Mathikere and Yeshwanthpur. The upper level will carry the elevated suburban railway, while the lower level will function as a road flyover. The design is intended to address right-of-way constraints in the densely developed area, with additional works planned at Hebbal, Shettihalli and Yeshwanthpur. K-RIDE is a special purpose vehicle of the Union and Karnataka governments implementing the 148-km Bengaluru Suburban Rail Project. The Mallige Line runs from Benniganahalli to Chikkabanavara, and all its civil works packages have now been awarded. Cemindia Projects was formerly known as ITD Cementation India. K-RIDE has also awarded Package 1 of Corridor 4, or the Kanaka Line, to the RNS-GPL joint venture for Rs. 3.42 bn. The package includes 6.2 km of at-grade formation and 3.6 km of elevated viaduct between Benniganahalli and Jakkur. Package 2, covering a 13-km at-grade section between Heelalige and Bellandur, was awarded to RNS Infrastructure for Rs. 1.69 bn. Two of the four civil works packages under Corridor 4 have therefore been awarded, with tenders for the remaining packages to follow.

Related Stories

Gold Stories

Next Story
Real Estate

WSB Real Estate Partners Exits Six Housing Investments

WSB Real Estate Partners recently announced the successful exit of six residential investments across Bengaluru, Mumbai Metropolitan Region (MMR) and National Capital Region (NCR), delivering an average internal rate of return (IRR) of 19–21 per cent and an overall investment return of 1.4 times.The real estate-focused investment firm invested approximately Rs 7 billion across six mid-affordable housing projects over the past four years. All six investments were fully repaid between April and November 2026, several months ahead of their original investment tenures.WSB collaborated with sever..

Next Story
Infrastructure Transport

Aluminium Industry Seeks Policy Support for Rs 4 Trillion Investment

The Aluminium Association of India (AAI) has recently urged the government to introduce supportive policy measures to safeguard the sector’s proposed Rs 4 trillion investment pipeline. The association highlighted the need for a predictable policy framework to strengthen domestic manufacturing, expand production capacity and reduce import dependence.AAI submitted its recommendations for the Union Budget 2027-28 to the Ministries of Finance, Commerce and Industry, and Mines, along with the Department for Promotion of Industry and Internal Trade (DPIIT).India’s aluminium demand is projected t..

Next Story
Technology

ABB Unveils Intelligent Motor to Accelerate Industrial AI Adoption

ABB recently launched Intelleqt, which it describes as the world’s first low-voltage motor with factory-integrated intelligence, at the SPS trade fair in Germany. Designed to deliver real-time operational insights from its first rotation, the motor enables industrial operators to integrate equipment-level data into existing digital platforms while retaining full ownership of their data.The launch addresses growing challenges in scaling artificial intelligence (AI) across industrial operations, particularly data quality and availability. According to Deloitte, while 84 per cent of manufacture..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code