+
India Approves Rail Corridor to Connect Haryana with Gujarat Ports
RAILWAYS & METRO RAIL

India Approves Rail Corridor to Connect Haryana with Gujarat Ports

The Union Railway Ministry has authorized the 129-kilometer South Haryana Economic Rail Corridor, which will connect the state to four ports in Gujarat.

This corridor will cross Rajasthan. The construction is scheduled to begin in a few years, since the ministry is now organizing a survey of the semi-high speed rail corridor. For this survey, a budget of Rs 31 million has been set aside.

The corridor, which would cost Rs 12.25 billion, will run from Farrukhnagar in Gurgaon to Loharu in Bhiwani via Jhajjar and Charkhi Dadri.

The Farrukhnagar-Loharu railway will be linked to Bahadurgarh and Sonipat in Haryana in the future as part of the continuing construction of the Orbital Rail Corridor.

Existing railway lines from Delhi, Rajasthan, and Gurgaon will be linked to the Farrukhnagar-Loharu section as well.

“After construction of the corridor, Haryana will have direct connectivity with four ports of Gujarat — Kandla, Mundra, Navlakhi and Jakhau — through this railway line. It will indirectly help connect Delhi with the four ports,” Rohtak MP Arvind Sharma stated, following his meeting with the Railway Minister Ashwini Vaishnaw.

The Haryana government approved the project in 2022. Trains will be able to operate at speeds ranging from 130 to 160 kmph once the line is completed.

The Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government, will carry out the project's execution.

HRIDC is currently building the Haryana Orbital Rail Corridor, which will link Palwal and Sonipat through Sohna, Manesar, and Kharkhoda. This new railway line will be capable of handling both passenger and freight trains.

The project's goal is to shorten travel time for the region's numerous industrial centres. Officials claim that once completed, the road from Delhi-NCR to Gujarat will be shorter.

The proposed project promises to drastically shorten travel time between Delhi and several Rajasthan cities, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar.

It will also boost connectivity between Delhi and Gujarat's Gandhidham, Bhuj, and Dwarka.

According to the study, trains from Delhi currently travel via Rewari to reach Rajasthan.

See also:
Haryana Orbital Rail: RVNL to construct a 5-km tunnel in the Aravallis
Nashik-Pune rail project beacons a new corridor


The Union Railway Ministry has authorized the 129-kilometer South Haryana Economic Rail Corridor, which will connect the state to four ports in Gujarat. This corridor will cross Rajasthan. The construction is scheduled to begin in a few years, since the ministry is now organizing a survey of the semi-high speed rail corridor. For this survey, a budget of Rs 31 million has been set aside. The corridor, which would cost Rs 12.25 billion, will run from Farrukhnagar in Gurgaon to Loharu in Bhiwani via Jhajjar and Charkhi Dadri. The Farrukhnagar-Loharu railway will be linked to Bahadurgarh and Sonipat in Haryana in the future as part of the continuing construction of the Orbital Rail Corridor. Existing railway lines from Delhi, Rajasthan, and Gurgaon will be linked to the Farrukhnagar-Loharu section as well. “After construction of the corridor, Haryana will have direct connectivity with four ports of Gujarat — Kandla, Mundra, Navlakhi and Jakhau — through this railway line. It will indirectly help connect Delhi with the four ports,” Rohtak MP Arvind Sharma stated, following his meeting with the Railway Minister Ashwini Vaishnaw. The Haryana government approved the project in 2022. Trains will be able to operate at speeds ranging from 130 to 160 kmph once the line is completed. The Haryana Rail Infrastructure Development Corporation (HRIDC), a joint venture between the Indian Railways and the Haryana government, will carry out the project's execution. HRIDC is currently building the Haryana Orbital Rail Corridor, which will link Palwal and Sonipat through Sohna, Manesar, and Kharkhoda. This new railway line will be capable of handling both passenger and freight trains. The project's goal is to shorten travel time for the region's numerous industrial centres. Officials claim that once completed, the road from Delhi-NCR to Gujarat will be shorter. The proposed project promises to drastically shorten travel time between Delhi and several Rajasthan cities, including Sikar, Jhunjhunu, Bikaner, Jaisalmer, Jodhpur, Barmer, Hanumangarh, and Sri Ganganagar. It will also boost connectivity between Delhi and Gujarat's Gandhidham, Bhuj, and Dwarka. According to the study, trains from Delhi currently travel via Rewari to reach Rajasthan. See also: Haryana Orbital Rail: RVNL to construct a 5-km tunnel in the AravallisNashik-Pune rail project beacons a new corridor

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Assam Gets Approval For 350,000 PMAY Homes

Assam Chief Minister Himanta Biswa Sarma met Union Agriculture Minister Shivraj Singh Chouhan in New Delhi, where the minister handed an approval document for 310,000 new homes under the Pradhan Mantri Awas Yojana. The chief minister subsequently posted on X expressing gratitude and noting that the minister had formally handed approval for 380,000 homes as well. The release and the social media post contained varying figures, with broader references to 350,000 homes reported in some summaries. The approvals carry central assistance equivalent to Rs 50 billion (bn), corresponding to the five th..

Next Story
Infrastructure Urban

KPIGreen Achieves Highest Energised Capacity of 630+ MW DC

KPI Green Energy energised more than 630 MW DC of capacity in the June to August quarter, marking the highest quarterly addition in the company's history. The capacity was brought online across its Independent Power Producer (IPP) and Engineering, Procurement and Construction (EPC) businesses. The company said the achievement reflected the scale, speed and consistency of its project execution engine. The firm described the quarter as a material operational milestone since its founding. The milestone covers a diversified mix of IPP assets and projects executed under the EPC vertical, spanning u..

Next Story
Infrastructure Energy

Adani Energy Solutions Wins Rs 47 bn Maharashtra Transmission Project

Adani Energy Solutions has won a transmission contract in Maharashtra valued at Rs 47 billion (Rs 47 bn) to evacuate 4,500 megawatt (MW) of renewable and storage power. The company informed exchanges that the project will facilitate pumped storage potential near Satara and strengthen the inter-regional corridor between the Western and Southern grids. The award follows a competitive bidding process and will support renewable energy evacuation to major load centres in the state. The scope includes establishment of a 765/400 kV substation at Satara, construction of a Kolhapur-Satara 765 kV double..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code