Tricity metro project gets green signal from Ministry
RAILWAYS & METRO RAIL

Tricity metro project gets green signal from Ministry

The Union ministry of housing and urban affairs has given the green signal for the Tricity metro project, a month after it received the comprehensive mobility plan (CMP). The Metro proposal, as readied by the Rail India Technical and Economic Services (RITES), will tackle Tricity’s burgeoning traffic chaos. RITES has proposed a 39-km metro network, spread across Chandigarh, Mohali and Panchkula while steering clear of the heritage sectors – Sector 1 to 30.

A senior UT official said, “We have got a nod from the ministry, stating that they do not have any objection to the project. The ministry had asked the Rail India Technical and Economic Services (RITES) to prepare a detailed project report (DPR) phase-wise, which will be again sent to the ministry for funds.”

Expected to cost Rs 10,570 crore, the mass rapid transport system (MRTS) will also comprise bus terminals, bus depots and geometrical improvements at busy intersections, among others.

In April this year, Chandigarh, Haryana and Punjab accorded in-principle approval to the comprehensive mobility plan (CMP) for the tricity, prepared by RITES. The final metro network comprises two phases, spread across Chandigarh, Mohali, Panchkula and also Zirakpur, New Chandigarh and Pinjore.

In the first phase, which will be developed between 2027 and 2037, the MRTS will run from Sarangpur to Panchkula ISBT; Rock Garden to Zirakpur ISBT via Mohali Industrial Area and airport; and from Grain Market Chowk, Sector 39, to Transport Nagar, Sector 26.

The second phase, to be developed after 2037, will cover four routes: Panchkula ISBT to Panchkula Extension; Paraul, New Chandigarh to Sarangpur; Airport Chowk to Manakpur Kallar; and Zirakpur ISBT to Pinjore ISBT.

In line with RITES proposal for a robust local bus network, to encourage more people to switch to public transport and ensure smooth flow of traffic, UT has also finalised seven straight bus corridors criss-crossing through the tricity.

RITES had found that these seven corridors — Sector 43 ISBT to New Chandigarh; Sector 17 ISBT to Mansa Devi Complex; Sector 43 ISBT to Panchkula ISBT; Sector 17 ISBT to Kharar ISBT; PGIMER/Dadumajra to Zirakpur ISBT; PGIMER to ISBT Panchkula; ISBT Kharar to ISBT Zirakpur — have the maximum traffic flow.

The Union ministry of housing and urban affairs has given the green signal for the Tricity metro project, a month after it received the comprehensive mobility plan (CMP). The Metro proposal, as readied by the Rail India Technical and Economic Services (RITES), will tackle Tricity’s burgeoning traffic chaos. RITES has proposed a 39-km metro network, spread across Chandigarh, Mohali and Panchkula while steering clear of the heritage sectors – Sector 1 to 30.A senior UT official said, “We have got a nod from the ministry, stating that they do not have any objection to the project. The ministry had asked the Rail India Technical and Economic Services (RITES) to prepare a detailed project report (DPR) phase-wise, which will be again sent to the ministry for funds.”Expected to cost Rs 10,570 crore, the mass rapid transport system (MRTS) will also comprise bus terminals, bus depots and geometrical improvements at busy intersections, among others.In April this year, Chandigarh, Haryana and Punjab accorded in-principle approval to the comprehensive mobility plan (CMP) for the tricity, prepared by RITES. The final metro network comprises two phases, spread across Chandigarh, Mohali, Panchkula and also Zirakpur, New Chandigarh and Pinjore.In the first phase, which will be developed between 2027 and 2037, the MRTS will run from Sarangpur to Panchkula ISBT; Rock Garden to Zirakpur ISBT via Mohali Industrial Area and airport; and from Grain Market Chowk, Sector 39, to Transport Nagar, Sector 26.The second phase, to be developed after 2037, will cover four routes: Panchkula ISBT to Panchkula Extension; Paraul, New Chandigarh to Sarangpur; Airport Chowk to Manakpur Kallar; and Zirakpur ISBT to Pinjore ISBT.In line with RITES proposal for a robust local bus network, to encourage more people to switch to public transport and ensure smooth flow of traffic, UT has also finalised seven straight bus corridors criss-crossing through the tricity.RITES had found that these seven corridors — Sector 43 ISBT to New Chandigarh; Sector 17 ISBT to Mansa Devi Complex; Sector 43 ISBT to Panchkula ISBT; Sector 17 ISBT to Kharar ISBT; PGIMER/Dadumajra to Zirakpur ISBT; PGIMER to ISBT Panchkula; ISBT Kharar to ISBT Zirakpur — have the maximum traffic flow.

Next Story
Infrastructure Energy

GAIL to Set Up Bengaluru CBG Plant Under New Concession Pact

GAIL (India) Limited has signed a 20-year concession agreement with the Bengaluru City Municipal Corporation (BBMP) to set up a compressed biogas (CBG) plant in the city. The project, expected to produce around 10 tonnes of CBG daily, will utilise municipal solid waste as feedstock, contributing to clean energy generation and efficient waste management. The CBG produced will be used in GAIL’s City Gas Distribution network to promote cleaner fuel usage. The initiative aligns with the government’s Sustainable Alternative Towards Affordable Transportation (SATAT) scheme and GAIL’s broader ..

Next Story
Infrastructure Energy

Uttarakhand HC Lifts 31-Year Ban on ONGC’s Contractual Hiring

The Uttarakhand High Court has lifted a 31-year-old ban on the Oil and Natural Gas Corporation (ONGC) from hiring contractual workers, a restriction imposed in 1993. The decision enables ONGC’s Dehradun establishment to employ personnel on a contractual basis to meet operational requirements. The long-standing prohibition had limited ONGC’s ability to fill vacancies in its technical and administrative departments, often leading to project delays and higher dependence on outsourcing. With the court’s directive, the public sector enterprise can now proceed with temporary recruitments whil..

Next Story
Infrastructure Energy

JSW Energy’s Utkal Unit Bags 400 MW, 25-Year Power Supply Deal

JSW Energy Limited announced that its subsidiary, JSW Energy (Utkal) Limited, has secured a Letter of Award (LoA) from Karnataka’s Power Company of Karnataka Limited (PCKL) for the supply of 400 MW of electricity for 25 years. The agreement is part of a competitive bidding process for long-term procurement of power to meet the state’s growing energy demand. The 400 MW capacity will be supplied from JSW Energy’s upcoming thermal power project in Odisha. This development strengthens JSW Energy’s presence in the southern market and aligns with its strategy to enhance long-term contracte..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?