+
Tricity metro project gets green signal from Ministry
RAILWAYS & METRO RAIL

Tricity metro project gets green signal from Ministry

The Union ministry of housing and urban affairs has given the green signal for the Tricity metro project, a month after it received the comprehensive mobility plan (CMP). The Metro proposal, as readied by the Rail India Technical and Economic Services (RITES), will tackle Tricity’s burgeoning traffic chaos. RITES has proposed a 39-km metro network, spread across Chandigarh, Mohali and Panchkula while steering clear of the heritage sectors – Sector 1 to 30.

A senior UT official said, “We have got a nod from the ministry, stating that they do not have any objection to the project. The ministry had asked the Rail India Technical and Economic Services (RITES) to prepare a detailed project report (DPR) phase-wise, which will be again sent to the ministry for funds.”

Expected to cost Rs 10,570 crore, the mass rapid transport system (MRTS) will also comprise bus terminals, bus depots and geometrical improvements at busy intersections, among others.

In April this year, Chandigarh, Haryana and Punjab accorded in-principle approval to the comprehensive mobility plan (CMP) for the tricity, prepared by RITES. The final metro network comprises two phases, spread across Chandigarh, Mohali, Panchkula and also Zirakpur, New Chandigarh and Pinjore.

In the first phase, which will be developed between 2027 and 2037, the MRTS will run from Sarangpur to Panchkula ISBT; Rock Garden to Zirakpur ISBT via Mohali Industrial Area and airport; and from Grain Market Chowk, Sector 39, to Transport Nagar, Sector 26.

The second phase, to be developed after 2037, will cover four routes: Panchkula ISBT to Panchkula Extension; Paraul, New Chandigarh to Sarangpur; Airport Chowk to Manakpur Kallar; and Zirakpur ISBT to Pinjore ISBT.

In line with RITES proposal for a robust local bus network, to encourage more people to switch to public transport and ensure smooth flow of traffic, UT has also finalised seven straight bus corridors criss-crossing through the tricity.

RITES had found that these seven corridors — Sector 43 ISBT to New Chandigarh; Sector 17 ISBT to Mansa Devi Complex; Sector 43 ISBT to Panchkula ISBT; Sector 17 ISBT to Kharar ISBT; PGIMER/Dadumajra to Zirakpur ISBT; PGIMER to ISBT Panchkula; ISBT Kharar to ISBT Zirakpur — have the maximum traffic flow.

The Union ministry of housing and urban affairs has given the green signal for the Tricity metro project, a month after it received the comprehensive mobility plan (CMP). The Metro proposal, as readied by the Rail India Technical and Economic Services (RITES), will tackle Tricity’s burgeoning traffic chaos. RITES has proposed a 39-km metro network, spread across Chandigarh, Mohali and Panchkula while steering clear of the heritage sectors – Sector 1 to 30.A senior UT official said, “We have got a nod from the ministry, stating that they do not have any objection to the project. The ministry had asked the Rail India Technical and Economic Services (RITES) to prepare a detailed project report (DPR) phase-wise, which will be again sent to the ministry for funds.”Expected to cost Rs 10,570 crore, the mass rapid transport system (MRTS) will also comprise bus terminals, bus depots and geometrical improvements at busy intersections, among others.In April this year, Chandigarh, Haryana and Punjab accorded in-principle approval to the comprehensive mobility plan (CMP) for the tricity, prepared by RITES. The final metro network comprises two phases, spread across Chandigarh, Mohali, Panchkula and also Zirakpur, New Chandigarh and Pinjore.In the first phase, which will be developed between 2027 and 2037, the MRTS will run from Sarangpur to Panchkula ISBT; Rock Garden to Zirakpur ISBT via Mohali Industrial Area and airport; and from Grain Market Chowk, Sector 39, to Transport Nagar, Sector 26.The second phase, to be developed after 2037, will cover four routes: Panchkula ISBT to Panchkula Extension; Paraul, New Chandigarh to Sarangpur; Airport Chowk to Manakpur Kallar; and Zirakpur ISBT to Pinjore ISBT.In line with RITES proposal for a robust local bus network, to encourage more people to switch to public transport and ensure smooth flow of traffic, UT has also finalised seven straight bus corridors criss-crossing through the tricity.RITES had found that these seven corridors — Sector 43 ISBT to New Chandigarh; Sector 17 ISBT to Mansa Devi Complex; Sector 43 ISBT to Panchkula ISBT; Sector 17 ISBT to Kharar ISBT; PGIMER/Dadumajra to Zirakpur ISBT; PGIMER to ISBT Panchkula; ISBT Kharar to ISBT Zirakpur — have the maximum traffic flow.

Next Story
Infrastructure Urban

P Govt Signs MoU With NaBFID for Amaravati Infrastructure Advisory

The Andhra Pradesh Capital Region Development Authority (APCRDA) has signed a Memorandum of Understanding (MoU) with the National Bank for Financing Infrastructure and Development (NaBFID) for Transaction Advisory Services. The agreement was signed in the presence of Hon’ble Chief Minister Shri N. Chandrababu Naidu. As per the MoU, NaBFID will support APCRDA in designing a financial strategy and evaluating implementation models including Public-Private Partnerships (PPP) for infrastructure projects in Amaravati. It will also assist in identifying revenue sources and land monetisation op..

Next Story
Infrastructure Urban

Gentari and Shell team up to boost EV charging network in India

Gentari Green Mobility India and Shell India have entered into a strategic roaming partnership aimed at improving electric vehicle (EV) charging accessibility across the country. Starting from 10 July, users of the Gentari Go app will be able to access Shell Recharge charging stations, while Shell Recharge users will also gain access to Gentari’s charging network, covering over 450 chargers.This collaboration is designed to expand the EV charging infrastructure and improve service quality in India by enabling interoperability between the two platforms. Gentari Go already operates more than 3..

Next Story
Infrastructure Transport

Maharashtra may allow higher FSI in Mumbai airport funnel zone

The Maharashtra government is considering the possibility of allowing higher potential Floor Space Index (FSI) for buildings located within Mumbai's airport funnel zone, in response to the redevelopment challenges caused by stringent height restrictions in these areas.The affected regions mainly include Vile Parle, Santacruz, and Kurla. As part of its revised policy for the funnel zone, the state government is, for the first time, offering Transfer of Development Rights (TDR) specifically for redevelopment purposes rather than for land acquisition.The issue was highlighted in the Assembly, whe..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?