GAIL closes Ratnagiri LNG terminal, reduces imports
PORTS & SHIPPING

GAIL closes Ratnagiri LNG terminal, reduces imports

GAIL (India), the company has temporarily ceased the importation of liquefied natural gas (LNG) at its Ratnagiri plant, which has an annual capacity of 5 million tonnes, since mid-May. The plant is expected to remain closed until the end of September. The shutdown during the monsoon season in the western Maharashtra state is a routine practice for GAIL due to the challenges posed by rain and high tides, which make operations difficult without a breakwater. However, it is anticipated that a breakwater will be constructed by next year, eliminating the need to close the terminal during the monsoon period. The company's most recent LNG cargo arrived at the Dabhol port on May 11, as per Refinitiv Eikon data.

The Maharashtra Maritime Board has issued a notice, viewed by Reuters, stating that restricted operations by inland vessels will be enforced during the "four weather season" from May 26 to August 31, with the aim of ensuring the safety of life and the environment.

The sources within GAIL also mentioned that the importation of LNG will be postponed until October due to the rough seas prevailing in September.

Also read:
GAIL to build Maharashtra ethane cracker at Rs 400 bn
Noida, Greater Noida to set up waste-to-energy plant


GAIL (India), the company has temporarily ceased the importation of liquefied natural gas (LNG) at its Ratnagiri plant, which has an annual capacity of 5 million tonnes, since mid-May. The plant is expected to remain closed until the end of September. The shutdown during the monsoon season in the western Maharashtra state is a routine practice for GAIL due to the challenges posed by rain and high tides, which make operations difficult without a breakwater. However, it is anticipated that a breakwater will be constructed by next year, eliminating the need to close the terminal during the monsoon period. The company's most recent LNG cargo arrived at the Dabhol port on May 11, as per Refinitiv Eikon data. The Maharashtra Maritime Board has issued a notice, viewed by Reuters, stating that restricted operations by inland vessels will be enforced during the four weather season from May 26 to August 31, with the aim of ensuring the safety of life and the environment. The sources within GAIL also mentioned that the importation of LNG will be postponed until October due to the rough seas prevailing in September. Also read: GAIL to build Maharashtra ethane cracker at Rs 400 bn Noida, Greater Noida to set up waste-to-energy plant

Next Story
Technology

Building Faster, Smarter, and Greener!

Backed by ULCCS’s century-old legacy, U-Sphere combines technology, modular design and sustainable practices to deliver faster and more efficient projects. In an interaction with CW, Rohit Prabhakar, Director - Business Development, shares how the company’s integrated model of ‘Speed-Build’, ‘Smart-Build’ and ‘Sustain-Build’ is redefining construction efficiency, quality and environmental responsibility in India.U-Sphere positions itself at the intersection of speed, sustainability and smart design. How does this translate into measurable efficiency on the ground?At U..

Next Story
Infrastructure Transport

Smart Roads, Smarter India

India’s infrastructure boom is not only about laying more kilometres of highways – it’s about building them smarter, safer and more sustainably. From drones mapping fragile Himalayan slopes to 3D machine-controlled graders reducing human error, technology is steadily reshaping the way projects are planned and executed. Yet, the journey towards digitisation remains complex, demanding not just capital but also coordination, training and vision.Until recently, engineers largely depended on Survey of India toposheets and traditional survey methods like total stations or DGPS to prepare detai..

Next Story
Real Estate

What Does DCPR 2034 Mean?

The Maharashtra government has eased approval norms for high-rise buildings under DCPR 2034, enabling the municipal commissioner to sanction projects up to 180 m on large plots. This change is expected to streamline approvals, reduce procedural delays and accelerate redevelopment, drawing reactions from developers, planners and industry experts about its implications for Mumbai’s vertical growth.Under the revised DCPR 2034 rules, buildings on plots of 2,000 sq m or more can now be approved up to 180 m by the municipal commissioner, provided structural and geotechnical reports are certified b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?