PM Modi inaugurates 6 mega projects in Uttarakhand
WATER & WASTE

PM Modi inaugurates 6 mega projects in Uttarakhand

Image courtesy: Orissa Diary

In a country where water bodies are revered and worshipped by its people, our nonchalance and lack of awareness have contributed in making the holy river a health hazard for those who rely on Ganga’s water for their daily needs. Ganga is one of the most polluted water bodies in the world. Ganga river basin today is a haven to sewage waste, industrial waste, animals and human remains. 

Keeping in mind the importance the water body holds to the people of the country and the colourful and unique aquatic life it is home to various steps have been taken by different governments from time to time to ameliorate its situation. On those lines and with the same objective the Union Government in 2014 Namami Gange programme with Rs 200 billion budget allocation for conservation, rejuvenation of Ganga. 

To give positive nd necessary nudge to the conservation and rejuvenation efforts, Narendra Modi inaugurated six mega projects in Uttarakhand under the Namnmi Gange scheme. 

These projects are as follows:
  • the construction of a 68 MLD Sewage Treatment Plant (STP),
  • the up-gradation of the existing 27 MLD at Jagjeetpur, in Haridwar and
  • the construction of an 18 MLD STP at Sarai, in Haridwar.
Reportedly, the inauguration of 68 MLD Jagjeetpur project also marks the completion of the first sewerage project taken up on hybrid annuity model of PPP. 

In Rishikesh, a 26 MLD STP at Lakkadghat was inaugurated. The Prime Minister also inaugurated a 5 MLD STP at Chorpani, and two STPs with capacities of 1 MLD and 0.01 MLD at Badrinath.


 The government had a 4 step strategy in place to ensure the fruition of their agenda:
  1.  First: To stop the flow of dirty water into the river by laying a sewage treatment plant network. 
  2. Second: was to ensure that the sewage treatment plants served the purpose for the next 15-20 years
  3. Third: To end open defecation in the 100 big cities and 5000 small towns and villages situated on the banks of the river Ganga
  4. Fourth: To stop pollution in the tributaries of Ganga
The Prime Minister also launched Jal Jeevan Mission`s logo and guidelines.

First of its kind museum was also inaugurated by Prime Minister. The location of Ganga Avalokan Museum is at Chandi ghat in Uttarakhand’s Haridwar. The museum will showcase the biodiversity, the culture and the rejuvenation activities. The National Mission for Clean Ganga (NMCG) and the Wildlife Institute of India (WII) are jointly working on the project. 

Image courtesy: Orissa DiaryIn a country where water bodies are revered and worshipped by its people, our nonchalance and lack of awareness have contributed in making the holy river a health hazard for those who rely on Ganga’s water for their daily needs. Ganga is one of the most polluted water bodies in the world. Ganga river basin today is a haven to sewage waste, industrial waste, animals and human remains. Keeping in mind the importance the water body holds to the people of the country and the colourful and unique aquatic life it is home to various steps have been taken by different governments from time to time to ameliorate its situation. On those lines and with the same objective the Union Government in 2014 Namami Gange programme with Rs 200 billion budget allocation for conservation, rejuvenation of Ganga. To give positive nd necessary nudge to the conservation and rejuvenation efforts, Narendra Modi inaugurated six mega projects in Uttarakhand under the Namnmi Gange scheme. These projects are as follows: the construction of a 68 MLD Sewage Treatment Plant (STP),the up-gradation of the existing 27 MLD at Jagjeetpur, in Haridwar andthe construction of an 18 MLD STP at Sarai, in Haridwar.Reportedly, the inauguration of 68 MLD Jagjeetpur project also marks the completion of the first sewerage project taken up on hybrid annuity model of PPP. In Rishikesh, a 26 MLD STP at Lakkadghat was inaugurated. The Prime Minister also inaugurated a 5 MLD STP at Chorpani, and two STPs with capacities of 1 MLD and 0.01 MLD at Badrinath. The government had a 4 step strategy in place to ensure the fruition of their agenda: First: To stop the flow of dirty water into the river by laying a sewage treatment plant network. Second: was to ensure that the sewage treatment plants served the purpose for the next 15-20 yearsThird: To end open defecation in the 100 big cities and 5000 small towns and villages situated on the banks of the river GangaFourth: To stop pollution in the tributaries of GangaThe Prime Minister also launched Jal Jeevan Mission`s logo and guidelines.First of its kind museum was also inaugurated by Prime Minister. The location of Ganga Avalokan Museum is at Chandi ghat in Uttarakhand’s Haridwar. The museum will showcase the biodiversity, the culture and the rejuvenation activities. The National Mission for Clean Ganga (NMCG) and the Wildlife Institute of India (WII) are jointly working on the project. 

Next Story
Technology

AI-Enabled Workflows Lift Profitability and Productivity

Organisations modernising frontline workflows with artificial intelligence, automation and real-time data are reporting stronger financial performance, higher productivity and improved employee engagement, according to a global study by Zebra Technologies and Oxford Economics.The research covered 1,000 senior leaders across retail, manufacturing, transportation and logistics in the US, Mexico, the UK, Germany, India, Japan, Australia and New Zealand.In transportation and logistics, 54 per cent of companies that improved picking and packing operations reported faster operational performance, wh..

Next Story
Real Estate

India Leads Global AI Readiness but Implementation Lags

Indian companies lead global averages across all eight artificial intelligence readiness indicators tracked by JLL, but only 19 per cent have started making changes to their workplaces, according to the JLL 2026 Future of Work Survey.The study found that 77 per cent of Indian business leaders expect AI to change their office requirements, creating a 58-percentage-point gap between awareness and implementation. The survey covered more than 2,200 CEOs, CFOs and real estate leaders across 21 countries during the first quarter of 2026.Despite concerns over automation, 58 per cent of Indian leaders..

Next Story
Equipment

Three WOLFF Cranes Build Riyadh Cable-Stayed Bridges

Three WOLFF 180 B luffing jib cranes are supporting the construction of two cable-stayed bridges alongside the existing Wadi Laban Bridge in Riyadh, Saudi Arabia. The project is being developed for the Royal Commission for Riyadh City and executed by the ICRC joint venture comprising IC Ictas and Al Rashid Trading & Contracting Company.The cranes are handling lifting operations including formwork, reinforcement, concrete placement, work platforms, surveying equipment and other construction materials. Each crane is fitted with a 40 m jib, reaches a hook height of 157 m and offers a maximum ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement