Shakti Pumps Wins Rs. 1.12 bn Solar Pump Order
WATER & WASTE

Shakti Pumps Wins Rs. 1.12 bn Solar Pump Order

Shakti Pumps has received a Letter of Empanelment worth Rs. 1.12 bn, including goods and services tax, from Maharashtra State Electricity Distribution Company (MSEDCL) for the supply and installation of 4,755 off-grid solar photovoltaic water pumping systems across Maharashtra.

The order covers pumps with capacities of 3 HP, 5 HP and 7.5 HP under the Maharashtra government’s Magel Tyala Saur Krushi Pump Yojana. The contract is valued at Rs. 1.03 bn excluding GST and Rs. 1.12 bn including GST, according to the company’s exchange filing.

Shakti Pumps is responsible for the end-to-end execution of the project. This includes designing, manufacturing, supplying, transporting, installing and testing the systems, as well as commissioning them after installation.

The project must be completed within 60 days of the issuance of the work order or Notice to Proceed. The company said the order was awarded by a domestic entity and did not involve any interest of its promoter, promoter group or group companies in the awarding organisation.

The latest contract follows another MSEDCL order received by Shakti Pumps in the previous month. That contract, valued at Rs. 2.36 bn including GST, covers the supply and installation of 10,000 solar-powered water pumping systems across Maharashtra under the same state scheme.

The earlier order also involved pumps with capacities of 3 HP, 5 HP and 7.5 HP and carried a 60-day execution period from the date of the work order or Notice to Proceed. Shakti Pumps’ shares rose as much as 1.5 per cent to Rs. 450 on the National Stock Exchange during trading on Tuesday. The stock had declined 5.4 per cent over the previous month and 39.5 per cent so far this year.

Shakti Pumps has received a Letter of Empanelment worth Rs. 1.12 bn, including goods and services tax, from Maharashtra State Electricity Distribution Company (MSEDCL) for the supply and installation of 4,755 off-grid solar photovoltaic water pumping systems across Maharashtra. The order covers pumps with capacities of 3 HP, 5 HP and 7.5 HP under the Maharashtra government’s Magel Tyala Saur Krushi Pump Yojana. The contract is valued at Rs. 1.03 bn excluding GST and Rs. 1.12 bn including GST, according to the company’s exchange filing. Shakti Pumps is responsible for the end-to-end execution of the project. This includes designing, manufacturing, supplying, transporting, installing and testing the systems, as well as commissioning them after installation. The project must be completed within 60 days of the issuance of the work order or Notice to Proceed. The company said the order was awarded by a domestic entity and did not involve any interest of its promoter, promoter group or group companies in the awarding organisation. The latest contract follows another MSEDCL order received by Shakti Pumps in the previous month. That contract, valued at Rs. 2.36 bn including GST, covers the supply and installation of 10,000 solar-powered water pumping systems across Maharashtra under the same state scheme. The earlier order also involved pumps with capacities of 3 HP, 5 HP and 7.5 HP and carried a 60-day execution period from the date of the work order or Notice to Proceed. Shakti Pumps’ shares rose as much as 1.5 per cent to Rs. 450 on the National Stock Exchange during trading on Tuesday. The stock had declined 5.4 per cent over the previous month and 39.5 per cent so far this year.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Welspun One unveils Diwali campaign for World Trade Center Thane

Welspun One has unveiled A Dream Diwali, a festive brand film promoting World Trade Center Thane, its proposed mixed-use development in the Mumbai Metropolitan Region (MMR). The campaign uses individual interpretations of an ideal Diwali to introduce the experiences and offerings planned at the development.The film follows different characters as they share their festive wishes and go about activities such as shopping, meeting friends, playing games and spending time with family. Through these everyday moments, the campaign presents the idea that celebrations are personal and that different ge..

Next Story
Equipment

BorgWarner secures three turbocharger contracts with global powertrain leader

BorgWarner has secured three new turbocharger contracts with a global powertrain technology company. The wins comprise one contract for its variable turbine geometry (VTG) turbocharger and two for its wastegate turbocharger. The technologies will be deployed in the customer's light-vehicle gasoline platforms in South America and Europe, with production scheduled to begin in 2027.The VTG turbochargers are designed for gasoline engines operating under demanding conditions and high-boost pressure requirements. They are engineered to support Miller-cycle engines and withstand exhaust temperatures ..

Next Story
Infrastructure Transport

International Digi Yatra Trials Begin at Seven Airports

India has begun trials of Digi Yatra for international passengers at seven airports, allowing eligible Indian passport holders to use facial recognition at selected airport checkpoints. The facility is currently limited to Indian nationals with e-passports travelling on selected international flights operated by Air India and IndiGo. The Civil Aviation Ministry announced the trials on 1 November, with testing scheduled through December 2026. A wider rollout is expected in 2027 after the ministry assesses passenger feedback gathered during the trial period, according to PTI. The system is inten..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code