JICA extends ODA loan of Rs 24.80 bn for Mumbai Metro Line 3 Project (III)
PORTS & SHIPPING

JICA extends ODA loan of Rs 24.80 bn for Mumbai Metro Line 3 Project (III)

Japan International Cooperation Agency (JICA) has signed an agreement with the Government of India to provide an Official Development Assistance (ODA) loan of 39,928 million Japanese Yen (approximately Rs 24.80 billion) for the “Mumbai Metro Line 3 Project (III)”.

The objective of the project is to cope with the increase in traffic demand in Mumbai by expanding the mass rapid transportation system, thereby promoting regional economic development and improving urban environment, through mitigation of traffic jams and decrease of pollution caused by increasing motor vehicles.

The ODA loan agreement was signed between Dr CS Mohapatra, Additional Secretary, Department of Economic Affairs, Ministry of Finance, and Katsuo Matsumoto, Chief Representative, JICA India.

Speaking on the occasion, Katsuo Matsumoto, Chief Representative, JICA India, said, “Given the increase in population in Mumbai, there is an essential need for the project in Mumbai Metropolitan Region (MMR). Mass Rapid Transport systems also help in reducing pollution caused by private vehicles and improving living conditions. The current situation highlights the need for MRTS in Mumbai, and aims at easing mobility and connectivity.”

With a total of 33.7 km, entailing 26 stations, Line 3 (Colaba-Bandra-SEEPZ) is planned to connect southern Mumbai with the major activity areas like Bandra Kurla Complex (BKC), Airport (Domestic and International), Maharashtra Industrial Development Corporation (MIDC) area, SEEPZ (Industrial Hub) and the area along Jogeshwari-Vikhroli Link Road (JVLR), which has got tremendous potential for new developments.

Also read: Mumbai Metro Line 3 witnesses 23rd tunnel breakthrough

The Mumbai Metro will help in tackling congestion, as the daily ridership volume for 2021 is estimated as 1.21 million per day and will reach 1.70 million per day in 2031. By Mumbai Metro Line-3, the expected travel time from Domestic Airport station to BKC station will be less than seven minutes and from BKC station to Cuffe Parade station will be less than 40 minutes.

Also read: HCC completes first tunnel for Mumbai Metro-III project 

The project is scheduled to be completed by 2021. Mumbai Metro Rail Corporation (MMRCL) is the Executing Agency of the Project.

Overall, JICA has extended concessional ODA loans worth over 1 trillion Japanese Yen (approximately Rs 600 billion) for the development of metro systems in Delhi, Bengaluru, Kolkata, Chennai, Mumbai and Ahmedabad.

Japan International Cooperation Agency (JICA) has signed an agreement with the Government of India to provide an Official Development Assistance (ODA) loan of 39,928 million Japanese Yen (approximately Rs 24.80 billion) for the “Mumbai Metro Line 3 Project (III)”. The objective of the project is to cope with the increase in traffic demand in Mumbai by expanding the mass rapid transportation system, thereby promoting regional economic development and improving urban environment, through mitigation of traffic jams and decrease of pollution caused by increasing motor vehicles. The ODA loan agreement was signed between Dr CS Mohapatra, Additional Secretary, Department of Economic Affairs, Ministry of Finance, and Katsuo Matsumoto, Chief Representative, JICA India. Speaking on the occasion, Katsuo Matsumoto, Chief Representative, JICA India, said, “Given the increase in population in Mumbai, there is an essential need for the project in Mumbai Metropolitan Region (MMR). Mass Rapid Transport systems also help in reducing pollution caused by private vehicles and improving living conditions. The current situation highlights the need for MRTS in Mumbai, and aims at easing mobility and connectivity.” With a total of 33.7 km, entailing 26 stations, Line 3 (Colaba-Bandra-SEEPZ) is planned to connect southern Mumbai with the major activity areas like Bandra Kurla Complex (BKC), Airport (Domestic and International), Maharashtra Industrial Development Corporation (MIDC) area, SEEPZ (Industrial Hub) and the area along Jogeshwari-Vikhroli Link Road (JVLR), which has got tremendous potential for new developments. Also read: Mumbai Metro Line 3 witnesses 23rd tunnel breakthrough The Mumbai Metro will help in tackling congestion, as the daily ridership volume for 2021 is estimated as 1.21 million per day and will reach 1.70 million per day in 2031. By Mumbai Metro Line-3, the expected travel time from Domestic Airport station to BKC station will be less than seven minutes and from BKC station to Cuffe Parade station will be less than 40 minutes. Also read: HCC completes first tunnel for Mumbai Metro-III project  The project is scheduled to be completed by 2021. Mumbai Metro Rail Corporation (MMRCL) is the Executing Agency of the Project. Overall, JICA has extended concessional ODA loans worth over 1 trillion Japanese Yen (approximately Rs 600 billion) for the development of metro systems in Delhi, Bengaluru, Kolkata, Chennai, Mumbai and Ahmedabad.

Next Story
Infrastructure Energy

South West Pinnacle Wins Rs 30 Cr Oman Mining Contract

South West Pinnacle Exploration Ltd has secured a Rs 30 crore contract from Minerals Development Oman (MDO) for mining exploration in concession areas 12B and 13.The two-year project will be carried out via Alara Resources LLC, a JV in Oman. MDO, backed by Oman’s investment authorities, focuses on monetising mineral wealth.The contract covers copper, gold, and chromite and highlights South West Pinnacle’s growing footprint in international exploration and mining services. ..

Next Story
Equipment

Godrej GEG Boosts Intralogistics with AI and Green Tech

Godrej Enterprises Group (GEG) is revolutionising warehouse and factory logistics through its Material Handling Equipment and Storage Solutions arms by integrating AI, IoT, and automation.With 20–25% market share and 85% local sourcing, GEG champions Atmanirbhar Bharat and sustainability. The Chennai plant, a green manufacturing leader, uses RoHS-compliant materials and has slashed energy consumption by 60%.GEG serves e-commerce, FMCG, retail, and cold chains with high-performance racking and electric forklifts. Upcoming IoT-enabled forklifts and telematics solutions aim to improve speed, sa..

Next Story
Infrastructure Urban

Amit Shah Inaugurates Key Projects Across Gujarat

Union Home Minister Amit Shah inaugurated and laid the foundation stone for various projects in Gujarat’s Panchmahal district and Ahmedabad.In Godhra, he inaugurated the Center of Excellence building, sports complex, reservoir, and Miyawaki plantation. In Ahmedabad, he unveiled a new cooperative complex in Adaroda village and a primary school in Juwal.These projects, under the Model Co-op Village scheme, aim to boost education, sustainability, and rural development across the state. ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?