BUILDING SOLUTIONS
Real Estate

BUILDING SOLUTIONS

Dr Fixit has launched building envelope solutions for roofs and walls for better thermal insulation of the building. The comprehensive range of low energy consumption system solutions include  Dr Fixit LEC system, Dr Fixit Blueseal system and light weight concrete under roofing soluti...

Dr Fixit has launched building envelope solutions for roofs and walls for better thermal insulation of the building. The comprehensive range of low energy consumption system solutions include  Dr Fixit LEC system, Dr Fixit Blueseal system and light weight concrete under roofing solutions. For walls, it offers smart wall insulation finishing system, external insulated finishing system and light weight wall plaster.Contact: Dr Fixit. E-mail: info.drfixit@pidilite.com. Website: www.drfixit.co.in

Next Story
Infrastructure Energy

Sigenergy Launches AI Agent for Renewable Energy

Sigenergy has introduced SigenAgent, an all-domain AI agent designed for the renewable energy industry. Unveiled at the company’s ‘AI in All’ event, the system aims to turn solar and storage hardware into autonomous, goal-driven energy systems for homes and businesses.SigenAgent works through a continuous cycle of perception, reasoning and action. It analyses real-time factors such as weather conditions, electricity prices and grid status to automatically determine the most efficient operating path. Users can set broader goals such as lowering energy bills or securing backup power, while..

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->