India May Need More Coal Power Capacity as Demand Surges
COAL & MINING

India May Need More Coal Power Capacity as Demand Surges

India may need to add substantially more coal-fired power capacity than previously planned as rapidly rising electricity demand strains supply, according to Ghanshyam Prasad, chairperson of the Central Electricity Authority (CEA). The country had planned to add 97 GW of coal power capacity by 2035, taking its total to 307 GW, compared with about 230 GW currently.

Prasad indicated that the additional requirement beyond the existing plan could rise to between 105 GW and 150 GW. He attributed the potential increase to accelerating power consumption and the need for stable resources to meet demand. The remarks were made at an event organised by the Indian Chamber of Commerce.

Daily peak electricity demand this year has been running about 45 GW to 50 GW above the levels recorded a year earlier. Weaker monsoon rains reduced hydropower output and increased dependence on thermal generation, contributing to tighter conditions across the electricity system.

Power shortages reached 560 mn kWh in September, the highest level since August 2023, even as coal-fired plants increased production. Coal-based generation rose 13.3 per cent from a year earlier, while hydropower generation declined 20 per cent, according to government data.

The possible expansion of coal generation does not indicate a slowdown in renewable energy development. India added about 50 GW of renewable capacity last year and is expected to add more than 50 GW annually. However, Prasad said renewable energy would need to be supported by nuclear power and pumped-storage hydropower to maintain grid stability and reliable electricity supplies as consumption continues to grow.

India may need to add substantially more coal-fired power capacity than previously planned as rapidly rising electricity demand strains supply, according to Ghanshyam Prasad, chairperson of the Central Electricity Authority (CEA). The country had planned to add 97 GW of coal power capacity by 2035, taking its total to 307 GW, compared with about 230 GW currently. Prasad indicated that the additional requirement beyond the existing plan could rise to between 105 GW and 150 GW. He attributed the potential increase to accelerating power consumption and the need for stable resources to meet demand. The remarks were made at an event organised by the Indian Chamber of Commerce. Daily peak electricity demand this year has been running about 45 GW to 50 GW above the levels recorded a year earlier. Weaker monsoon rains reduced hydropower output and increased dependence on thermal generation, contributing to tighter conditions across the electricity system. Power shortages reached 560 mn kWh in September, the highest level since August 2023, even as coal-fired plants increased production. Coal-based generation rose 13.3 per cent from a year earlier, while hydropower generation declined 20 per cent, according to government data. The possible expansion of coal generation does not indicate a slowdown in renewable energy development. India added about 50 GW of renewable capacity last year and is expected to add more than 50 GW annually. However, Prasad said renewable energy would need to be supported by nuclear power and pumped-storage hydropower to maintain grid stability and reliable electricity supplies as consumption continues to grow.

Related Stories

Gold Stories

Next Story
Real Estate

IGBC Green Building Congress 2026 advances India’s net-zero agenda

The Indian Green Building Council (IGBC), part of the Confederation of Indian Industry (CII), opened the 24th edition of the Green Building Congress 2026 at the Jio World Convention Centre, Mumbai, with a focus on accelerating India's green and net-zero building movement. The three-day event, being held from 26 to 28 November, brought together policymakers, industry leaders and sustainability experts to discuss green buildings, climate-resilient infrastructure and sustainable communities.A key highlight of the inaugural session was the launch of five pilot rating systems: Green Retail, DigiBui..

Next Story
Real Estate

Maharashtra CM inaugurates fifth Model Sub-Registrar Office in Mumbai

Maharashtra Chief Minister Devendra Fadnavis has inaugurated a Model Sub-Registrar Office (SRO) in Lower Parel, Mumbai, taking the number of such centres launched in the state to five. The initiative aims to modernise property registration services through technology-enabled infrastructure and citizen-centric processes.Developed by the Government of Maharashtra in association with VFS Global and WE Excel Software, the Lower Parel centre follows the launch of Model SROs in Pune, Bandra Kurla Complex in Mumbai, Navi Mumbai and Nagpur.The centres provide facilities for registering property-relate..

Next Story
Infrastructure Transport

NHBF hails Indian Army aircraft operations on Amritsar–Jamnagar corridor

The National Highways Builders Federation (NHBF) has welcomed the successful landing and take-off of four Indian Army microlight aircraft on the Amritsar–Jamnagar Economic Corridor (NH-754K) in Gujarat. The exercise demonstrated the potential of highway infrastructure to support defence operations and emergency response. The expressway was developed by CDS Infra Projects, an NHBF member company.Developed under the Bharatmala Pariyojana, the six-lane greenfield corridor is described as India's second-longest expressway. The operation was conducted by the Indian Army's Team Mountain Eagles as ..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code