- Home
- Infrastructure Energy
- POWER & RENEWABLE ENERGY
- Odisha chalks out plan for hydro power
Share
Odisha chalks out plan for hydro power
01 Nov 2013
1 Min Read
CW Team
The Odisha Hydro Power Corporation (OHPC) has chalked out a series of steps to boost power generation in the state. As part of its plan, OHPC has floated a tender to prepare a detailed project report for the proposed 600 MW pump storage project at Indravati. It is one of the three pump storage power projects for which preliminary estimate reports have been prepared. The other two pump storage projects are 500 MW project at Balimela and 320 MW project at Upper Kolab.
Contact: Odisha Hydro Power Corporation.
Tel:0674-254 2983.
E-mail: ohpc.co@gmail.com
Website: www.ohpcltd.com
The Odisha Hydro Power Corporation (OHPC) has chalked out a series of steps to boost power generation in the state. As part of its plan, OHPC has floated a tender to prepare a detailed project report for the proposed 600 MW pump storage project at Indravati. It is one of the three pump storage power projects for which preliminary estimate reports have been prepared. The other two pump storage projects are 500 MW project at Balimela and 320 MW project at Upper Kolab. Contact: Odisha Hydro Power Corporation. Tel:0674-254 2983. E-mail: ohpc.co@gmail.com Website: www.ohpcltd.com
Related Stories
Gold Stories
Opinion Poll
Question : Which technological advancement do you believe will most transform the real estate industry in the coming years?
Live Results :
Virtual Reality and 3D Property Tours
Smart Home and Building Automation
Blockchain for Property Transactions
Big Data and Predictive Analytics for Market Insights
Augmented Reality for Property Staging and Design
Drone Technology for Aerial Photography and Site Analysis
Latest updates
27 Apr 2024
27 Apr 2024
27 Apr 2024