Odisha chalks out plan for hydro power
POWER & RENEWABLE ENERGY

Odisha chalks out plan for hydro power

The Odisha Hydro Power Corporation (OHPC) has chalked out a series of steps to boost power generation in the state. As part of its plan, OHPC has floated a tender to prepare a detailed project report for the proposed 600 MW pump storage project at Indravati. It is one of the three pump storage power projects for which preliminary estimate reports have been prepared. The other two pump storage projects are 500 MW project at Balimela and 320 MW project at Upper Kolab.

Contact: Odisha Hydro Power Corporation.
Tel:0674-254 2983.
E-mail: ohpc.co@gmail.com
Website: www.ohpcltd.com

The Odisha Hydro Power Corporation (OHPC) has chalked out a series of steps to boost power generation in the state. As part of its plan, OHPC has floated a tender to prepare a detailed project report for the proposed 600 MW pump storage project at Indravati. It is one of the three pump storage power projects for which preliminary estimate reports have been prepared. The other two pump storage projects are 500 MW project at Balimela and 320 MW project at Upper Kolab. Contact: Odisha Hydro Power Corporation. Tel:0674-254 2983. E-mail: ohpc.co@gmail.com Website: www.ohpcltd.com

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram