Bokaro Power Supply Under Pressure as Coal Stock Falls to Three Days
POWER & RENEWABLE ENERGY

Bokaro Power Supply Under Pressure as Coal Stock Falls to Three Days

Bokaro power supply has come under renewed pressure after coal stocks at Bokaro Power Supply Company (BPSCL) fell to about three days, with irregular consignments reducing generation and prompting staggered outages across Bokaro Steel City. The shortage is affecting electricity availability for Bokaro Steel Plant (BSL) and its township.

BPSCL requires around 4,000 t of coal daily to maintain normal operations, according to chief executive officer Sudhir Vyas. The utility previously received almost one rake a day, but consignments are now arriving once every two to three days, limiting its ability to maintain generation.

Power generation at the Damodar Valley Corporation (DVC)-SAIL joint venture has declined to around 130-150 MW from about 190 MW in recent weeks. The reduction has increased pressure on supplies to BSL and residential areas served through the township network, while BSL needs about 240 MW for plant operations and a further 55 MW for township demand.

BSL draws electricity from both BPSCL and DVC, making coal availability for the joint venture important to industrial operations and household supply. Central Coalfields (CCL) and Bharat Coking Coal (BCCL) are the main suppliers involved in the disrupted deliveries, which BPSCL officials have partly attributed to monsoon-related effects on mining and transportation.

BPSCL has urged CCL and BCCL to restore regular supplies, warning that its limited buffer stock could constrain generation further if fresh consignments do not improve soon. To manage reduced availability, the utility is distributing power through staggered outages designed to prevent any locality from remaining without electricity for an extended period and to give residents time to charge inverters.

Repeated cuts are affecting daily routines in Bokaro’s residential sectors, including Sector 2, where residents have called for prompt action. Officials have warned that any further reduction in coal deliveries could deepen disruptions in the township and affect steel plant operations, although the immediate operational priority is to restore regular consignments and stabilise generation.

Bokaro power supply has come under renewed pressure after coal stocks at Bokaro Power Supply Company (BPSCL) fell to about three days, with irregular consignments reducing generation and prompting staggered outages across Bokaro Steel City. The shortage is affecting electricity availability for Bokaro Steel Plant (BSL) and its township. BPSCL requires around 4,000 t of coal daily to maintain normal operations, according to chief executive officer Sudhir Vyas. The utility previously received almost one rake a day, but consignments are now arriving once every two to three days, limiting its ability to maintain generation. Power generation at the Damodar Valley Corporation (DVC)-SAIL joint venture has declined to around 130-150 MW from about 190 MW in recent weeks. The reduction has increased pressure on supplies to BSL and residential areas served through the township network, while BSL needs about 240 MW for plant operations and a further 55 MW for township demand. BSL draws electricity from both BPSCL and DVC, making coal availability for the joint venture important to industrial operations and household supply. Central Coalfields (CCL) and Bharat Coking Coal (BCCL) are the main suppliers involved in the disrupted deliveries, which BPSCL officials have partly attributed to monsoon-related effects on mining and transportation. BPSCL has urged CCL and BCCL to restore regular supplies, warning that its limited buffer stock could constrain generation further if fresh consignments do not improve soon. To manage reduced availability, the utility is distributing power through staggered outages designed to prevent any locality from remaining without electricity for an extended period and to give residents time to charge inverters. Repeated cuts are affecting daily routines in Bokaro’s residential sectors, including Sector 2, where residents have called for prompt action. Officials have warned that any further reduction in coal deliveries could deepen disruptions in the township and affect steel plant operations, although the immediate operational priority is to restore regular consignments and stabilise generation.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

New National Highway Between Assam and Arunachal Pradesh Notified

A new national highway connecting Assam and Arunachal Pradesh has been notified by the Union Ministry of Road Transport and Highways, bringing renewed attention to the poor condition of a key route in the region. The notification has raised hopes that long-awaited repairs will be undertaken on the deteriorating Likabali-Garu stretch. The newly designated National Highway 515A begins at its junction with NH-515 near Akajan in Assam. From there, it passes through Likabali, Siji, Garu, Dali and Basar before ending at its junction with NH-13 near Bam, also known as Bame, in Arunachal Pradesh. The ..

Next Story
Infrastructure Transport

NHAI Removes 55 Unauthorised Structures Along Two National Highways

The National Highways Authority of India (NHAI) has completed a special anti-encroachment drive along National Highway-44 (NH-44) and National Highway-444A (NH-444A). The operation was conducted by NHAI’s Project Implementation Unit (PIU) in Ambala under the authority’s Regional Office (RO) in Chandigarh. During the drive, officials removed 55 unauthorised temporary structures located on NHAI land and within the Right of Way (ROW) of the two National Highways. The structures were identified as encroachments affecting land and road corridors under the authority’s jurisdiction. The operati..

Next Story
Infrastructure Transport

Ahmedabad–Mehsana Road to Become Eight-Lane Highway

The Gujarat government is planning to upgrade the Ahmedabad–Mehsana Road by widening the existing four-lane corridor into an eight-lane highway at an estimated cost of Rs. 26 bn. The project is intended to improve road capacity and connectivity between Ahmedabad and Mehsana in North Gujarat. The work will involve strengthening and expanding State Highway-41, which serves as an important transport link between Ahmedabad and Mehsana. The proposed improvement will cover the existing carriageway and associated road infrastructure to support smoother movement of passenger and commercial vehicles...

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code