Mahagenco Floats Consultancy Tender For 200 MW Solar Project
POWER & RENEWABLE ENERGY

Mahagenco Floats Consultancy Tender For 200 MW Solar Project

Maharashtra State Power Generation Company Limited (MAHAGENCO) has issued a consultancy tender for the preparation of a detailed project report and associated services for eight 25 Megawatt (MW) grid-connected solar plants paired with a battery energy storage system in Maharashtra. The scope covers bid specifications, tendering activity, approval of detailed engineering, material inspections and project management. The deadline for bid submission is June 29, 2026.

Work has been divided into multiple modules including pre-FEED engineering, tender preparation, engineering review and project execution support. The consultant will be expected to prepare pre-feasibility studies, hydrology and geotechnical reviews, energy yield assessments, financial modelling and project risk analysis. Technical specifications will be required for solar modules, balance of system and battery storage packages.

The selected agency will provide bid evaluation support, review engineering designs and layouts submitted by engineering, procurement and construction contractors, and conduct grid integration studies and quality inspections. The role also covers project documentation management, commissioning assistance and monitoring of construction activities through to testing and handover. Additionally, the consultant must ensure compliance with statutory requirements and the optimisation of plant layouts and evacuation infrastructure.

Bidders must pay a tender fee of Rs 17,700 online, a processing fee of Rs 29,500 and an earnest money deposit of Rs 500,000. Eligibility requires prior experience in technical due diligence, detailed project report preparation, design engineering, owner's engineering, lender's technical advisory or project monitoring for solar or solar-hybrid projects of at least 25 MW, or completion of one FEED assignment of at least 25 MW. They must also have completed either three similar assignments worth at least Rs 20 million (mn) each, two projects worth at least Rs 25 mn each or one project valued at a minimum of Rs 40 mn, maintain a minimum average annual turnover of Rs 50 mn during the last three financial years and a net worth of at least 25 per cent of paid-up share capital.

Maharashtra State Power Generation Company Limited (MAHAGENCO) has issued a consultancy tender for the preparation of a detailed project report and associated services for eight 25 Megawatt (MW) grid-connected solar plants paired with a battery energy storage system in Maharashtra. The scope covers bid specifications, tendering activity, approval of detailed engineering, material inspections and project management. The deadline for bid submission is June 29, 2026. Work has been divided into multiple modules including pre-FEED engineering, tender preparation, engineering review and project execution support. The consultant will be expected to prepare pre-feasibility studies, hydrology and geotechnical reviews, energy yield assessments, financial modelling and project risk analysis. Technical specifications will be required for solar modules, balance of system and battery storage packages. The selected agency will provide bid evaluation support, review engineering designs and layouts submitted by engineering, procurement and construction contractors, and conduct grid integration studies and quality inspections. The role also covers project documentation management, commissioning assistance and monitoring of construction activities through to testing and handover. Additionally, the consultant must ensure compliance with statutory requirements and the optimisation of plant layouts and evacuation infrastructure. Bidders must pay a tender fee of Rs 17,700 online, a processing fee of Rs 29,500 and an earnest money deposit of Rs 500,000. Eligibility requires prior experience in technical due diligence, detailed project report preparation, design engineering, owner's engineering, lender's technical advisory or project monitoring for solar or solar-hybrid projects of at least 25 MW, or completion of one FEED assignment of at least 25 MW. They must also have completed either three similar assignments worth at least Rs 20 million (mn) each, two projects worth at least Rs 25 mn each or one project valued at a minimum of Rs 40 mn, maintain a minimum average annual turnover of Rs 50 mn during the last three financial years and a net worth of at least 25 per cent of paid-up share capital.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code