Nepal Exports USD 39 mn of Electricity to India After Floods
POWER & RENEWABLE ENERGY

Nepal Exports USD 39 mn of Electricity to India After Floods

Nepal exported electricity worth more than USD 39 mn to India between mid-September and mid-October, as cross-border power trading recovered after flash floods disrupted generation and transmission infrastructure in August. The exports were reported by local media, citing Nepal Electricity Authority Executive Director Dirghayu Kumar Shrestha.

Shrestha said the supply had been briefly disrupted after an ice-rock avalanche in the high Himalayas near the Nepal-Tibet border triggered flash floods on August 26. The disaster devastated towns and villages across northern and central Nepal, killing around 1,400 people, while more than 5,000 people remained missing.

The floods damaged homes, vehicles, roads, bridges and hydropower projects. Damage to power infrastructure affected Nepal’s ability to maintain electricity supplies and temporarily interrupted exports to neighbouring countries.

Nearly two-thirds of Nepal’s cross-border electricity supply to India during the period was exported under bilateral agreements, according to the NEA executive director. The figure underscores India’s role as the principal market and transmission partner for Nepal’s surplus power during the post-flood recovery period.

Nepal also resumed exporting 40 MW of electricity to Bangladesh through India’s transmission network on Friday. The supply had been halted after the Bhotekoshi flash floods damaged the Trishuli and Chilime hydropower plants, which had been designated to provide electricity to Bangladesh.

The resumption of the Bangladesh supply followed restoration efforts at the affected facilities and transmission links. Nepal’s renewed exports to India and Bangladesh indicate a gradual recovery in regional electricity trade, although the condition of hydropower assets and related infrastructure remains linked to the pace of reconstruction after the floods.

Nepal exported electricity worth more than USD 39 mn to India between mid-September and mid-October, as cross-border power trading recovered after flash floods disrupted generation and transmission infrastructure in August. The exports were reported by local media, citing Nepal Electricity Authority Executive Director Dirghayu Kumar Shrestha. Shrestha said the supply had been briefly disrupted after an ice-rock avalanche in the high Himalayas near the Nepal-Tibet border triggered flash floods on August 26. The disaster devastated towns and villages across northern and central Nepal, killing around 1,400 people, while more than 5,000 people remained missing. The floods damaged homes, vehicles, roads, bridges and hydropower projects. Damage to power infrastructure affected Nepal’s ability to maintain electricity supplies and temporarily interrupted exports to neighbouring countries. Nearly two-thirds of Nepal’s cross-border electricity supply to India during the period was exported under bilateral agreements, according to the NEA executive director. The figure underscores India’s role as the principal market and transmission partner for Nepal’s surplus power during the post-flood recovery period. Nepal also resumed exporting 40 MW of electricity to Bangladesh through India’s transmission network on Friday. The supply had been halted after the Bhotekoshi flash floods damaged the Trishuli and Chilime hydropower plants, which had been designated to provide electricity to Bangladesh. The resumption of the Bangladesh supply followed restoration efforts at the affected facilities and transmission links. Nepal’s renewed exports to India and Bangladesh indicate a gradual recovery in regional electricity trade, although the condition of hydropower assets and related infrastructure remains linked to the pace of reconstruction after the floods.

Related Stories

Gold Stories

Next Story
Real Estate

Landmark Group plans Rs 150 billion NCR expansion

Landmark Group has announced expansion plans across two real estate projects in the National Capital Region (NCR), with a combined estimated sales potential of Rs 150 billion. The projects include Landmark One, a 2.1 million sq ft corporate office development on Golf Course Extension Road in Gurugram, and a proposed integrated hospitality, commercial and residential development on Dwarka Expressway.Landmark One has an estimated sales value of Rs 40 billion. The project involves an estimated construction investment of Rs 10 billion, apart from the underlying land, currently valued at around Rs ..

Next Story
Real Estate

RMZ entities secure 5-Star ratings in GRESB 2026

RMZ has been recognised as a Global and Regional Sector Leader in the 2026 Global Real Estate Sustainability Benchmark (GRESB) Real Estate Development Assessment, with three of its entities scoring 99.6 out of 100. RMZ Nexus LLP, Millenia Realtors Private Limited and Infralogix LLP secured 5-Star ratings in their respective categories across the Office and Industrial sectors.In the 2026 Development Benchmark, RMZ Nexus LLP and Millenia Realtors Private Limited were named Sector Leaders in the Office and Office Non-Listed categories in Asia. Infralogix LLP received the distinction in the Indust..

Next Story
Products

Schneider Electric deploys smart building systems at Jupiter Hospitals

Schneider Electric has partnered with Jupiter Hospitals to deploy connected building technologies aimed at improving energy efficiency, patient comfort and operational performance across its hospital campus. The deployment of its EcoStruxure Building Operation platform and SpaceLogic thermostats is helping the hospital achieve energy savings of up to 28 per cent, according to the company.With heating, ventilation and air-conditioning (HVAC) systems accounting for nearly 60 per cent of the hospital's total energy consumption, improving efficiency while maintaining the conditions required for pa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code